ML18057A043

From kanterella
Revision as of 18:43, 21 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Unit 2 - Emergency Plan Implementing Procedures Revision
ML18057A043
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 02/23/2018
From: Simmons P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML18057A043 (2)


Text

Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 Febru ary 23, 2018 10 CFR 50, Appendix E, Section V 10 CFR 50 54(qX5) 10 cFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 & U nit 2 Facility Operating License No. NPF-90 NRC Docket No. 50-390, 50-391

Subject:

Emergency Plan lmplementing Procedures Revision ln accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, 10 CFR 50.54(q)(5), and 10 CFR72.44(f), the following Emergency Plan lmplementing Procedures (EPIP) have been revised with administrative and editorial changes:

EPIP Revision Title Effective Date 12 0043 Emergency Equipment and Supplies 2t01t2018 2 0039 Notification of Unusual Event 2t09t2018 3 0043 AIert 2t09t2018 The above referenced revisions continue to comply with regulations and there is no reduction in effectiveness of the plan. EPIP-2 and EPIP-3 revisions added document titles to references, changed "peer check" nomenclature to "peer review," and performed various other editorial changes. EPIP-12 moved the Hazardous Material Response Vehicle Preventative Maintenance (PM) documentation requirement from monthly to quarterly and changed the PM number throughout the document.

U.S. Regulatory Commission February 23,2018 Page2 There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Thomas Detchemendy, Emergency Preparedness Manager, at (423) 365-3232.

Respectfully, Paul Simmons Site Vice President Watts Bar Nuclear Plant NRC Regional Administrator - Region ll NRC Senior Resident lnspector - Watts Bar Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant