ML18100A626

From kanterella
Revision as of 09:35, 21 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Submits Suppl to 930611 Request for Amend Re Boron Concentration Reduction,In Response to NRC Concerns for Bases Used to Calculate Boron Concentration in RCS at Given Temp.Concentration Based on Listed WCAP Topical Repts
ML18100A626
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/16/1993
From: Hagan J
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18100A627 List:
References
LCR-93-17, NLR-N93129, NUDOCS 9309290244
Download: ML18100A626 (4)


Text

  • , Public Service Electric and Gas Company Joseph J. Hagan Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President - Nuclear Operations SEP 16 1993 NLR-N93129 LCR 93-17, Supplement-2 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

SUPPLEMENT TO REQUEST FOR AMENDMENT BORON CONCENTRATION REDUCTION SALEM GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSES DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 In accordance with the requirements of 10CFR50.90, Public Service Electric and Gas Company (PSE&G) hereby transmits a supplement to the request for amendment of Facility Operating Licenses DPR-70 and DPR-75 for Salem Unit Nos. 1 and 2. Pursuant to the requirements of 10CFR50.9l(b) (1), a copy of this request for amendment has been sent to the State of New Jersey.

The NRC's concern for the bases used to calculate the Boron Concentration in the Reactor Coolant System at a given temperature is addressed in Appendix 4 of Attachment 3 of the proposed change (PSE&G letter NLR-N93077 dated June 11, 1993) and is based on the Westinghouse Cycle Specific Calculation for Salem 1 and 2, WCAP-13380 and WCAP-12534 respectively. These Cycle Specific Calculations are based on the Westinghouse Advance Nodal Computer Code, WCAP-10965-P-A, December 1985 and Nuclear Design System for Pressurized Water Reactor Cores, WCAP-11596-P-A, June 1988. Both WCAP-10965-P-A and WCAP-11596-P-A are NRC approved documents.

Attachment 1 contains updated pages with the editorial changes and corrections that superseded page 3/4 1-17(a) and 3/4 1-12(a) of Attachment 2 and page A4-4 of Attachment 3, of the proposed change in our letter NLR-N93077 dated June 11, 1993. On pages 3/4 1-17(a) and 3/4 1-12(a), the nominal measured volume in the Boric Acid Tank (BAT) as a percentage was added to the graph.

This makes it consistent with the. Control Room indication for the BAT volume. At the end of the first paragraph on page A4-4, the figure numbers A5-1 and A5-2 have been corrected to A4-1 and A4-2 respectively.

(

9309290244 PDR ADOCK 05000272 93091~~-;u p . .. PDR *

  • SEP 16 1993 Document Control Desk NLR-N93129 The editorial changes and corrections stated herein do not involve any changes to the intent of our request for amendment to Technical Specification. Therefore, the Determination of No Significant Hazards Consideration provided in PSE&G's letter dated June 11, 1993, remains valid.

Sincerely, an sident Operation Attachment c Mr. T. T. Martin, Administrator - Region I

u. s. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. J. c. Stone, Licensing Project Manager - Salem U. s. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. T. P. Johnson (S09)

USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625

REF: NLR-N93129 STATE OF NEW JERSEY SS.

COUNTY OF SALEM J. J. Hagan, being duly sworn according to law deposes and says:

I am Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in the above referenced letter, concerning the Salem Generating Station, Unit Nos. 1 and 2, are true to the best of my knowledge, information and belief.

',* T\1-~scr~~b~.' d ... and Sworn ~before me

~ ,~this. ll(~K day o~fum buL , 1993

~~'~

~>. .' p*ot~ry

~ChlM.

'.

KIMBERLY JO BROWN My Commission expires on ~~~~uN~OT~A_R_Y~PU~B_Ll~C~O~F~N~EW~JwE~R~SE~Y~~

My eu11e11lss1on 6pires April 21, 1998

ATTACHMENT 1