MONTHYEARML20211H4311999-08-27027 August 1999 Revised Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints ML18152B3591999-08-23023 August 1999 Revised Tech Specs Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in UFSAR & Includes Ref to Applicable UFSAR Section ML20210L1631999-08-0404 August 1999 Proposed Tech Specs,Ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification to 4 H Prior to Commencing Backfill Operation ML20212J3041999-06-22022 June 1999 Proposed Tech Specs Re Revised Surveillance Frequency & Action Times Reactor Trip & ESFAS ML20206N3691999-05-0606 May 1999 Proposed Tech Specs,Revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels & Actuation Logic ML20206G8361999-05-0303 May 1999 Proposed Tech Specs,Deleting &/Or Relocating Addl primary- to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206G8811999-05-0303 May 1999 Proposed Tech Specs,Increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20206H0301999-05-0303 May 1999 Proposed Tech Specs Bases Page B 3/4 6-1,allowing Use of NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing ML18152B6591999-04-28028 April 1999 Proposed Tech Specs Re Refueling Water Chemical Addition Tank Min Vol ML18152A2131999-02-16016 February 1999 Proposed Tech Specs,Consolidating AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18152B5451999-02-16016 February 1999 Proposed Tech Specs Pages,Revising Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML20203C8251999-02-0505 February 1999 Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Operability ML20198J0971998-12-22022 December 1998 Proposed Tech Specs Bases Changes Re EDG Steady State Frequency to Be Incorporated Into TS During Implementation of Amends 216 & 197 ML20195J4431998-11-18018 November 1998 Proposed Tech Specs Re Revs to Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9461998-11-10010 November 1998 Proposed Tech Specs,Clarifying Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML18152B6151998-11-0404 November 1998 Proposed Tech Specs 4.6.A.1.b,re EDG Start & Load Time Testing Requirements & TS 3.16 Bases Re EDG Ratings ML20154P2831998-10-16016 October 1998 Marked-up & Typed Tech Spec Pages to Revise EDG Section to Be Consistent with Station Procedures Associated with Steady State Conditions & W NSAL 93-022,for 980728 Application for Amends to Licenses NPF-4 & NPF-7 ML18153A3351998-09-24024 September 1998 Proposed Tech Specs Pages Affected by Suppl to 960912 Resubmittal of Change Request Re Relocation of Fire Protection Requirements from TS to UFSAR ML18153A3311998-09-24024 September 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML20153H5341998-09-24024 September 1998 Proposed Tech Specs 3/4.5.1 Re Safety Injection Accumulator Boron Concentration Verification ML20236U8411998-07-28028 July 1998 Proposed Tech Specs 4.6.2.2.1 & 4.6.2.2.2,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20236U8651998-07-28028 July 1998 Proposed Tech Specs 3/4.1.2 & 3/4.5.5,re RWST & Boron Concentration Ph Range Bases Change to Address Discrepancies Between Previous NRC Issued Ser,Ts Bases & Applicable Sections of SRP ML20236U8711998-07-28028 July 1998 Proposed Tech Specs,Revising EDG Section to Be Consistent W/ Station Procedures Associated W/Steady State Conditions & W Nuclear Safety Advisory Ltr NSAL 93-022 ML20249C7211998-06-19019 June 1998 Proposed Improved Tech Specs for North Anna ISFSI ML18152B7551998-06-19019 June 1998 Proposed Tech Specs Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML20217E9011998-03-25025 March 1998 Proposed Tech Specs Re Configuration Risk Mgt Program for risk-informed Allowed Outage Times & Insp Frequency of EDGs ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML20202E1551998-02-0909 February 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20202C3381998-02-0303 February 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML20202C5871998-02-0303 February 1998 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insps & Loop Flow Straightener Insps ML18153A3481997-12-18018 December 1997 Proposed Tech Specs Clarifying Terminology Used for Describing Equipment Surveillances Conducted on Refueling Interval Frequency.Clarification Consistent W/Info Contained in Rev 1 to NUREG-1431 ML20199G4161997-11-18018 November 1997 Revised Proposed TS Pages,Establishing 14 Day AOT Applicable Whenever EDG Is Inoperable ML20199H4001997-11-18018 November 1997 Proposed Tech Specs Permitting Quarterly Testing of Turbine Governor & Throttle Valves ML18153A3941997-11-0505 November 1997 Proposed Tech Specs Re Change for Increased Enrichment of Reload Fuel ML20199A1481997-11-0505 November 1997 Proposed Tech Specs Pages,Providing Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML18153A1761997-11-0505 November 1997 Proposed Tech Specs Re Temporary Svc Water Supply Line to Component Cooling Heat Exchangers ML20141F3741997-05-14014 May 1997 Proposed Tech Specs Revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided for TS 3/4.7.1.7 ML18153A5231997-04-24024 April 1997 Proposed Corrected Tech Specs Pages 6.1-3 & 6.1-8 Re Relocation of Fire Protection TS to Updated Final Safety Analysis Rept ML18153A5031997-03-18018 March 1997 Proposed Tech Specs Rev to Section 4.15 for Surry Power Station to Include Pp Inadvertently Omitted from 970203 Request for Amend to Licenses DPR-32 & DPR-37 ML20137C8581997-03-18018 March 1997 Proposed Tech Specs Re Containment Gaseous & Particulate Radiation Monitors ML20134J4141997-02-0404 February 1997 Revised Pp of Proposed TS Changes Re Intermediate Range Trip Setpoints & Allowable Values for Units 1 & 2 ML18153A4921997-02-0303 February 1997 Proposed Tech Specs Re Deletion of Specific ASME Section XI Code Ref ML20134F1231997-02-0303 February 1997 Proposed Tech Specs Re Use of Lead Test Assemblies in Plant,Units 1 & 2 ML20132E6211996-12-17017 December 1996 Proposed Tech Specs 3/4.7.3 Re Component Cooling Water Sys ML20132B5111996-12-10010 December 1996 Proposed Tech Specs Re Groundwater Level Exceeding Current Maximum Water Level ML18153A6351996-11-26026 November 1996 Proposed Tech Specs Re Removal of Record Retention Requirements,Per GL 95-06 & Administrative Ltr 95-06 ML20134H0051996-11-0606 November 1996 Proposed Tech Specs,Modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML18153A0671996-09-12012 September 1996 Proposed Tech Specs Re Relocation of Fire Protection Requirements ML20134F8781996-09-0404 September 1996 Proposed Tech Specs Requiring Exemption from Certain Requirements of 10CFR50.44, Stds for Combustible Gas Control Sys in Light Water Cooled Power Reactors & 10CFR50.46, Acceptance Criteria for Eccs.. ML20107L3951996-04-25025 April 1996 Proposed Tech Specs,Providing Suppl Info Re Clarification of TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions 1999-08-04
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211H4311999-08-27027 August 1999 Revised Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints ML18152B3591999-08-23023 August 1999 Revised Tech Specs Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in UFSAR & Includes Ref to Applicable UFSAR Section ML20211D9201999-08-20020 August 1999 Revised Pages to Third Ten Year ISI Program & Relief Requests ML18151A6641999-08-0606 August 1999 Rev 0 to Surry Unit 2 Cycle 16 Startup Physics Tests Rept. ML20210L1631999-08-0404 August 1999 Proposed Tech Specs,Ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification to 4 H Prior to Commencing Backfill Operation ML20212J3041999-06-22022 June 1999 Proposed Tech Specs Re Revised Surveillance Frequency & Action Times Reactor Trip & ESFAS ML20195B5691999-05-14014 May 1999 Rev 8,Change 2 to Vepc North Anna,Unit 1 IST Program Plan for Pumps & Valves Second Insp Interval 901214-001214 ML20195B5881999-05-14014 May 1999 Rev 8,Change 2 to Vepc North Anna Unit 2 IST Program Plan for Pumps & Valves Second Insp Interval,901214-001214 ML20206N3691999-05-0606 May 1999 Proposed Tech Specs,Revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels & Actuation Logic ML20206G8361999-05-0303 May 1999 Proposed Tech Specs,Deleting &/Or Relocating Addl primary- to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206G8811999-05-0303 May 1999 Proposed Tech Specs,Increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20206H0301999-05-0303 May 1999 Proposed Tech Specs Bases Page B 3/4 6-1,allowing Use of NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing ML20205P2341999-05-0101 May 1999 Rev 0 to Vepc North Anna Unit 1 ISI Program for Third Insp Interval Vol 1:ISI Program for Components & Component Supports for Interval 3 990501-090430 ML20205P2511999-05-0101 May 1999 Rev 0 to Vepc North Anna Power Station Unit 1 ISI Program Plan for Third Insp Interval:Components & Component Supports ML18152B6591999-04-28028 April 1999 Proposed Tech Specs Re Refueling Water Chemical Addition Tank Min Vol ML18152A2131999-02-16016 February 1999 Proposed Tech Specs,Consolidating AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18152B5451999-02-16016 February 1999 Proposed Tech Specs Pages,Revising Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML18151A5511999-02-10010 February 1999 to NE-1187, Surry Unit 1,Cycle 16 Startup Physics Tests Rept. ML20203C8251999-02-0505 February 1999 Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Operability ML20205P2651999-02-0404 February 1999 Rev 0 to Vepc North Anna Power Station Unit 1 ISI Plan for Third Interval for Sys Pressure Tests ML20196K1971998-12-22022 December 1998 Rev 0 to NE-1176, North Anna Unit 1,Cycle 14 Startup Physics Tests Rept, Dec 1998 ML20198J0971998-12-22022 December 1998 Proposed Tech Specs Bases Changes Re EDG Steady State Frequency to Be Incorporated Into TS During Implementation of Amends 216 & 197 ML20206N8851998-12-14014 December 1998 Rev 0 to ASME Section XI Sys Pressure Test Program,Second Insp Interval ML20206N8711998-11-30030 November 1998 Rev 11,Vol I to ISI Plan for Second Insp Interval for Components & Component Supports ML20195J4431998-11-18018 November 1998 Proposed Tech Specs Re Revs to Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9461998-11-10010 November 1998 Proposed Tech Specs,Clarifying Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML18152B6151998-11-0404 November 1998 Proposed Tech Specs 4.6.A.1.b,re EDG Start & Load Time Testing Requirements & TS 3.16 Bases Re EDG Ratings ML20154P2831998-10-16016 October 1998 Marked-up & Typed Tech Spec Pages to Revise EDG Section to Be Consistent with Station Procedures Associated with Steady State Conditions & W NSAL 93-022,for 980728 Application for Amends to Licenses NPF-4 & NPF-7 ML18153A3311998-09-24024 September 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML18153A3351998-09-24024 September 1998 Proposed Tech Specs Pages Affected by Suppl to 960912 Resubmittal of Change Request Re Relocation of Fire Protection Requirements from TS to UFSAR ML20153H5341998-09-24024 September 1998 Proposed Tech Specs 3/4.5.1 Re Safety Injection Accumulator Boron Concentration Verification ML20236U8411998-07-28028 July 1998 Proposed Tech Specs 4.6.2.2.1 & 4.6.2.2.2,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20236U8651998-07-28028 July 1998 Proposed Tech Specs 3/4.1.2 & 3/4.5.5,re RWST & Boron Concentration Ph Range Bases Change to Address Discrepancies Between Previous NRC Issued Ser,Ts Bases & Applicable Sections of SRP ML20236U8711998-07-28028 July 1998 Proposed Tech Specs,Revising EDG Section to Be Consistent W/ Station Procedures Associated W/Steady State Conditions & W Nuclear Safety Advisory Ltr NSAL 93-022 ML20236H5311998-07-0101 July 1998 Draft Nuclear Control Room Operator Development Program NAPS Module NCRODP-78 Spent Fuel Dry Storage Cask System. Draft Lesson Plans & Job Performance Measures Included ML20236U8891998-06-25025 June 1998 Rev 0 to NE-1163, North Anna Unit 2 Cycle 13 Startup Physics Tests Rept ML20249C7211998-06-19019 June 1998 Proposed Improved Tech Specs for North Anna ISFSI ML18152B7551998-06-19019 June 1998 Proposed Tech Specs Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML20236H5391998-06-0404 June 1998 Rev 1 to Procedure VPAP-0809, NUREG-0612 Heavy Load Program ML20236H5541998-06-0404 June 1998 Rev 5 to Procedure VPAP-0810, Crane & Hoist Program ML20249B9911998-05-0606 May 1998 Analysis of Capsule X Virginia Power Surry Unit 1 Reactor Vessel Matl Surveillance Program. W/Evaluation of Surry Unit 1 Surveillance Capsule X Results & Response to NRC RAI Re GL 92-01,rev 1,suppl 1 ML18151A1931998-05-0404 May 1998 Rev 1 to Summary of Changes to Surry Units 1 & 2 Third Interval IST Program. ML20206N8581998-04-30030 April 1998 Rev 5,Vol 1 to ISI Program for Second Insp Interval & Components & Component Supports,For 901214-010430 ML20236H5701998-04-0202 April 1998 Rev 8 to Procedure VPAP-1901, Industrial Safety & Health ML20217E9011998-03-25025 March 1998 Proposed Tech Specs Re Configuration Risk Mgt Program for risk-informed Allowed Outage Times & Insp Frequency of EDGs ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML20236H5631998-02-10010 February 1998 Rev 11 to Procedure VPAP-0105, Fitness for Duty Program ML20202E1551998-02-0909 February 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20202C5871998-02-0303 February 1998 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insps & Loop Flow Straightener Insps ML20202C3381998-02-0303 February 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker 1999-08-06
[Table view] |
Text
Attachment 2 Proposed Technical Specification Change North Anna Units 1 and 2 Virginia Electric and Power Company
~*
6.3
"
ADMINISTRATIVE CONTROLS FACILITY STAFF QUALIFICATIONS 6.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANS 3.1-(12/79 Draft)* for comparable positions, except for:
- 1. The Superintendent - Radiological Protection shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975.
- 2. Incumbents in the positions of Shift Supervisor, Assistant Shift Supervisor (SRO), Control Room Operator - Nuclear (RO), and Shift Technical Advisor, shall meet or exceed the qualifications of the applicable training programs as accredited by the National Academy for Nuclear Training.
- 3. The Superintendent Operations shall hold (or have previously held) a Senior Reactor Operator License for North Anna Power Station or a similar design Pressurized Water Reactor plant.
- 4. The Supervisor Shift Operations shall hold an active Senior Reactor Operator License for North Anna Power Station.
6.4 TRAINING 6.4.1 The Manager - Nuclear Training is responsible for ensuring that retraining and replacement training programs for the facility staff are maintained and that such programs have achieved, and continue to maintain, accreditation by the National Academy for Nuclear Training. Retraining and replacement training programs shall meet the recommendations of Section 5 of ANS 3.1 (12/79 Draft)* for staff in positions for which no accredited program exists.
6.5 REVIEW AND AUDIT 6.5.1 STATION NUCLEAR SAFETY AND OPERATING COMMITIEE (SNSOC)
FUNCTION 6.5.1.1 The SNSOC shall function to advise the Station Manager on all matters related to nuclear safety.
- Exceptions to this requirement are specified in VEPCO's QA Topical Report, VEP-1, "Quality Assurance Program,.*Operational Phase" NORTH ANNA - UNIT 1 6-5
6.3
-
ADMINISTRATIVE CONTROLS FACILITY STAFF QUALIFICATIONS 6.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANS 3.1-(12/79 Draft)* for comparable positions, except for:
- 1. The Superintendent - Radiological Protection shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975.
- 2. Incumbents in the positions of Shift Supervisor, Assistant Shift Supervisor (SRO),Control Room Operator - Nuclear (RO), and Shift Technical Advisor, who shall meet or exceed the qualifications of the applicable training programs as accredited by the National Academy for Nuclear Training.
- 3. The Supervisor Shift Operations shall hold an active Senior Reactor Operator License for North Anna Power Station.
- 4. Incumbents in those positions for which training programs are accredited by the National Academy for Nuclear Training shall meet or exceed the minimum qualifications of the applicable training program guide.
6.4 TRAINING 6.4.1 The Manager - Nuclear Training is responsible for ensuring that retraining and replacement training programs for the facility staff are maintained and that such programs have achieved, and continue to maintain, accreditation by the National Academy for Nuclear Training. Retraining and replacement training programs shall meet the recommendations of Section 5 of ANS 3.1 (12/79 Draft)* for staff in positions for which no accredited program exists.
6.5 REVIEW AND AUDIT 6.5.1 STATION NUCLEAR SAFETY AND OPERATING COMMITTEE (SNSOC)
FUNCTION 6.5.1.1 The SNSOC shall function to advise the Station Manager on all matters related to nuclear safety.
- Exceptions to this requirement are specified in VEPCO's QA Topical Report, VEP-1, "Quality Assurance Prograrlll*Operational Phase" NORTH ANNA - UNIT 2 . 6-6
Attachment 3 Proposed Technical Specification Change Surry Units 1 and 2 Virginia Electric and Power Company
.......
- TS 6.1-2 B. The facility organization shall conform to the following requirements:
- 1. Each member of the facility staff shall meet or exceed the minimum qualifications of ANS 3.1-(12/79 Draft) for comparable positions, except fqr: f
- a. The Superintendent - Radiological Protection shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975.
- b. The Superintendent Operations shall hold (or have previously held) a Senior Reactor Operator License for Surry Power Station or a similar design Pressurized Water Reactor plant.
- c. The Supervisor Shift Operations shall hold an active Senior Reactor Operator License for Surry Power Station.
- 2. Incumbents in the positions of Shift Supervisor, Assistant Shift Supervisor (SRO), Control Room Operator - Nuclear (RO), and Shift Technical Advisor, shall meet or exceed the qualifications of the applicable training programs as accredited by the National Academy for Nuclear Training.
- 3. The Manager - Nuclear Training is responsible for ensuring that retraining and replacement training programs for the facility staff are maintained and that such programs have achieved, and continue to maintain, accreditation by the National Academy for Nuclear Training.
Retraining and replacement training programs shall meet the recommendations of Section 5 of ANS 3.1 (12/79 Draft)* for staff in positions for which no accredited program exists.
- 4. Each on-duty shift shall be composed of at least the minimum shift crew composition for each unit as shown in Table 6.1-1.
- 5. A health physics technician shall be on site when fuel is in the reactor.
- 6. All core alterations shall be observed and directly supervised by either a licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation.
- Exceptions to this requirement are specified in VEPCO's QA Topical Report, VEP-1, "Quality Assurance Program, Operational Phase" Amendment Nos. 1p'i and 1~
-
Attachment 4 10 CFR 50.92, No Significant Hazards Consideration North Anna Units 1 and 2 Surry Units 1 and 2 Virginia Electric and Power Company
- -
1O CFR 50.92 Significant Hazards Considerations Analysis The proposed changes are being made to remove language describing, or committing to, any previous operator training programs since the training programs at North Anna and Surry have been accredited and certified in accordance with Regulatory Guide 1.8, Revision 2, "Qualification and Training of Personnel for Nuclear Power Plants."
The proposed changes delete reference to the March 28, 1980 NRC letter and substitute Virginia Electric and Power Company accredited training programs (including Shift Supervisor, Assistant Shift Supervisor, Control Room Operator -
Nuclear, and Shift Technical Advisor) for the previous training requirements.
In addition, the proposed changes redefine the responsibilities of the Manager -
Nuclear Training to encompass the responsibilities for ensuring retraining and replacement programs that have achieved accreditation and the responsibility for maintaining accreditation.
The proposed Technical Specification changes have been determined to administrative in nature.
It has a been determined that the proposed changes do not involve a significant hazards consideration as defined in 1O CFR 50.92. This determination was based on the following points.
- 1. Accident Probability or Consequence Increase. The proposed changes have no adverse impact upon potential accident probability or consequence. The proposed changes allow for substitution of regulatory requirements for training programs which have been accredited and certified. North Anna and Surry's training programs are accredited and certified as permitted by the regulation.
Likewise, the consequences of the accidents will not increase as a result of the proposed Technical Specification changes.
Therefore, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Accident Probability Creation. The proposed changes allow for substitution of regulatory requirements for training programs which have been accredited and certified. North Anna and Surry's training programs are accredited and certified as permitted by the regulation. The proposed changes Therefore, the proposed changes will not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Safety Margin Reduction. The proposed changes allow for substitution of regulatory requirements for training programs which have been accredited and certified. North Anna and Surry's training programs
IT
- "
are accredited and certified as permitted by the regulation. Therefore, the proposed changes do not involve a reduction in the margin to safety.
Based on the above significant hazards consideration evaluation,, Virginia Electric and Power Company concludes that the activities associated with this proposed Technical Specification change satisfies the no significant hazards consideration standards of 1O CFR 50.92(c) and, accordingly, a no significant hazards consideration finding is justified.