ML20211H431 | 27 August 1999 | Revised Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints | |
ML18152B359 | 23 August 1999 | Revised Tech Specs Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in UFSAR & Includes Ref to Applicable UFSAR Section | |
ML20210L163 | 4 August 1999 | Proposed Tech Specs,Ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification to 4 H Prior to Commencing Backfill Operation | Boric Acid Shutdown Margin |
ML20212J304 | 22 June 1999 | Proposed Tech Specs Re Revised Surveillance Frequency & Action Times Reactor Trip & ESFAS | |
ML20206N369 | 6 May 1999 | Proposed Tech Specs,Revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels & Actuation Logic | Shutdown Margin Earthquake |
ML20206G836 | 3 May 1999 | Proposed Tech Specs,Deleting &/Or Relocating Addl primary- to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event | Grab sample Pressure Boundary Leakage Pressure boundary leak |
ML20206G881 | 3 May 1999 | Proposed Tech Specs,Increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS | Ultimate heat sink |
ML20206H030 | 3 May 1999 | Proposed Tech Specs Bases Page B 3/4 6-1,allowing Use of NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing | |
ML18152B659 | 28 April 1999 | Proposed Tech Specs Re Refueling Water Chemical Addition Tank Min Vol | Boric Acid |
ML18152A213 | 16 February 1999 | Proposed Tech Specs,Consolidating AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 | Tornado Missile |
ML18152B545 | 16 February 1999 | Proposed Tech Specs Pages,Revising Augmented Insp Requirements for Reactor Coolant Pump Flywheels | |
ML20203C825 | 5 February 1999 | Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Operability | Pressure Boundary Leakage |
ML20198J097 | 22 December 1998 | Proposed Tech Specs Bases Changes Re EDG Steady State Frequency to Be Incorporated Into TS During Implementation of Amends 216 & 197 | |
ML20195J443 | 18 November 1998 | Proposed Tech Specs Re Revs to Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir | |
ML20195C946 | 10 November 1998 | Proposed Tech Specs,Clarifying Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters | |
ML18152B615 | 4 November 1998 | Proposed Tech Specs 4.6.A.1.b,re EDG Start & Load Time Testing Requirements & TS 3.16 Bases Re EDG Ratings | |
ML20154P283 | 16 October 1998 | Marked-up & Typed Tech Spec Pages to Revise EDG Section to Be Consistent with Station Procedures Associated with Steady State Conditions & W NSAL 93-022,for 980728 Application for Amends to Licenses NPF-4 & NPF-7 | |
ML20153H534 | 24 September 1998 | Proposed Tech Specs 3/4.5.1 Re Safety Injection Accumulator Boron Concentration Verification | |
ML18153A335 | 24 September 1998 | Proposed Tech Specs Pages Affected by Suppl to 960912 Resubmittal of Change Request Re Relocation of Fire Protection Requirements from TS to UFSAR | Safe Shutdown Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML18153A331 | 24 September 1998 | Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker | |
ML20236U841 | 28 July 1998 | Proposed Tech Specs 4.6.2.2.1 & 4.6.2.2.2,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps | |
ML20236U865 | 28 July 1998 | Proposed Tech Specs 3/4.1.2 & 3/4.5.5,re RWST & Boron Concentration Ph Range Bases Change to Address Discrepancies Between Previous NRC Issued Ser,Ts Bases & Applicable Sections of SRP | Shutdown Margin |
ML20236U871 | 28 July 1998 | Proposed Tech Specs,Revising EDG Section to Be Consistent W/ Station Procedures Associated W/Steady State Conditions & W Nuclear Safety Advisory Ltr NSAL 93-022 | Safe Shutdown |
ML20249C721 | 19 June 1998 | Proposed Improved Tech Specs for North Anna ISFSI | Time of Discovery Fuel cladding |
ML18152B755 | 19 June 1998 | Proposed Tech Specs Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers | |
ML20217E901 | 25 March 1998 | Proposed Tech Specs Re Configuration Risk Mgt Program for risk-informed Allowed Outage Times & Insp Frequency of EDGs | Safe Shutdown Probabilistic Risk Assessment Maintenance Rule Program Offsite Circuit |
ML18152A365 | 25 March 1998 | Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Fire Protection Program |
ML20202E155 | 9 February 1998 | Proposed Tech Specs Re EDG Allowed Outage Time | Safe Shutdown Maintenance Rule Program Offsite Circuit |
ML20202C338 | 3 February 1998 | Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker | |
ML20202C587 | 3 February 1998 | Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insps & Loop Flow Straightener Insps | |
ML18153A348 | 18 December 1997 | Proposed Tech Specs Clarifying Terminology Used for Describing Equipment Surveillances Conducted on Refueling Interval Frequency.Clarification Consistent W/Info Contained in Rev 1 to NUREG-1431 | High Radiation Area VT-2 |
ML20199G416 | 18 November 1997 | Revised Proposed TS Pages,Establishing 14 Day AOT Applicable Whenever EDG Is Inoperable | Safe Shutdown Boric Acid Packing leak Maintenance Rule Program Pressure Boundary Leakage Offsite Circuit |
ML20199H400 | 18 November 1997 | Proposed Tech Specs Permitting Quarterly Testing of Turbine Governor & Throttle Valves | Safe Shutdown Probabilistic Risk Assessment Turbine Missile |
ML20199A148 | 5 November 1997 | Proposed Tech Specs Pages,Providing Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel | |
ML18153A394 | 5 November 1997 | Proposed Tech Specs Re Change for Increased Enrichment of Reload Fuel | |
ML18153A176 | 5 November 1997 | Proposed Tech Specs Re Temporary Svc Water Supply Line to Component Cooling Heat Exchangers | |
ML20141F374 | 14 May 1997 | Proposed Tech Specs Revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided for TS 3/4.7.1.7 | |
ML18153A523 | 24 April 1997 | Proposed Corrected Tech Specs Pages 6.1-3 & 6.1-8 Re Relocation of Fire Protection TS to Updated Final Safety Analysis Rept | Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML18153A503 | 18 March 1997 | Proposed Tech Specs Rev to Section 4.15 for Surry Power Station to Include Pp Inadvertently Omitted from 970203 Request for Amend to Licenses DPR-32 & DPR-37 | |
ML20137C858 | 18 March 1997 | Proposed Tech Specs Re Containment Gaseous & Particulate Radiation Monitors | Pressure Boundary Leakage Pressure boundary leak |
ML20134J414 | 4 February 1997 | Revised Pp of Proposed TS Changes Re Intermediate Range Trip Setpoints & Allowable Values for Units 1 & 2 | Shutdown Margin |
ML18153A492 | 3 February 1997 | Proposed Tech Specs Re Deletion of Specific ASME Section XI Code Ref | |
ML20134F123 | 3 February 1997 | Proposed Tech Specs Re Use of Lead Test Assemblies in Plant,Units 1 & 2 | |
ML20132E621 | 17 December 1996 | Proposed Tech Specs 3/4.7.3 Re Component Cooling Water Sys | Safe Shutdown |
ML20132B511 | 10 December 1996 | Proposed Tech Specs Re Groundwater Level Exceeding Current Maximum Water Level | |
ML18153A635 | 26 November 1996 | Proposed Tech Specs Re Removal of Record Retention Requirements,Per GL 95-06 & Administrative Ltr 95-06 | High Radiation Area |
ML20134H005 | 6 November 1996 | Proposed Tech Specs,Modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves | Shutdown Margin |
ML18153A067 | 12 September 1996 | Proposed Tech Specs Re Relocation of Fire Protection Requirements | Safe Shutdown Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML20134F878 | 4 September 1996 | Proposed Tech Specs Requiring Exemption from Certain Requirements of 10CFR50.44, Stds for Combustible Gas Control Sys in Light Water Cooled Power Reactors & 10CFR50.46, Acceptance Criteria for Eccs.. | Shutdown Margin |
ML20107L395 | 25 April 1996 | Proposed Tech Specs,Providing Suppl Info Re Clarification of TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions | Boric Acid Shutdown Margin |