MONTHYEARGO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000397/20230122023-11-20020 November 2023 Commercial Grade Dedication Inspection Report 05000397/2023012 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000397/20230102023-11-0909 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000397/2023010 IR 05000397/20230932023-11-0101 November 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023093 ML23299A2072023-10-26026 October 2023 Biennial Requalification Inspection Request for Information IR 05000397/20230032023-10-25025 October 2023 Integrated Inspection Report 05000397/2023003 IR 05000397/20230112023-10-0404 October 2023 License Renewal Phase 2 Report 05000397/2023011 IR 05000397/20234012023-09-11011 September 2023 Security Baseline Inspection Report 05000397/2023401 GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) ML24032A2182023-09-0101 September 2023 Information Request, Security IR 2024401 GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000397/20230052023-08-22022 August 2023 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter IR 05000397/20230022023-08-0101 August 2023 Integrated Inspection Report 05000397/2023002 GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 ML23206A2442023-07-25025 July 2023 Energy Northwest Columbia Generating Station, Response to Apparent Violation in NRC Inspection Report 05000397/2023092; EA-23-054 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation ML23143A1202023-06-27027 June 2023 Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance ML23163A2502023-06-12012 June 2023 Summary of Changes and Analysis for Revision 41 of Plant Procedures Manual 13.8.1 Emergency Dose Projection System Operations GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report ML23157A2702023-06-0101 June 2023 4-2022-011 -022 Letter - OI Closure to Licensee IR 05000397/20230922023-06-0101 June 2023 NRC Inspection Report 05000397/2023092 and Preliminary White Finding IR 05000397/20230902023-06-0101 June 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023090 GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report IR 05000397/20230012023-05-0505 May 2023 Integrated Inspection Report 05000397/2023001 - April 26, 2023 GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications IR 05000397/20233012023-05-0101 May 2023 NRC Examination Report 05000397/2023301 GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 2024-01-08
[Table view] |
Text
~
M ~
STA.';Tii&D DISTRIBUTION FO COMING MATERIAL RELATING TO > XI CONTAINMENT U~ NUCLEAR REGULATORY COMMISSION COCKET NUM8ER NRC FORM 195 I2 78) 3%8%ilNSKK NRC DISTRIBUTION FoR PART 60 DOCKET MATERIAL TOP ICAL REPORT OATE OF OOCUMENT Mr. Olan Parr General Electric 09/26/7?
San Jose, California 95125 OATE RECEIVEO L. J. Sobon 09/29/77 GNOTORIZEO PROP INPUT FORM NUM8ER OF COPIES RECEIVEO gK,ETTE R QORIGINAI HVNCLASSIFIEO gfCCP V OESCRIPTION ENCLOSURE Consists of GE Report NEDO-24010 entitled: "Technical Basis For The Use Of The Square Root Of The Sum Of Squares (SRSS) IIetho For Combining Dyamic Loads On Nark II Plants" 1p
'td. July, 1977 ,
5/BR LETTERS OF INCORPORATXON WILL BE PLACED XN EACH DOCKET LISTED BELOWo NOTE CYS WILL BE PLACED IN'HE LPDR FOR THE FOLLOWING:
ZIKKR 50 358 NINE MlLE POINT 50-410 LIMERICK 50-352 353 jcm 09/30/77 WPP S-2 BAILLY 50-367 SHORE HAM ~
$ 0-342 LA SALLE 50-373/374 FOR ACTION/INFORMATION INTERNAL OISTRI BUTION CENTRAL FILES 2 W s o eac LETTER ONLY NRC PDR Ro DEYOUNG LPDR~S 7) Se Note o e Do VASSALLO Ko KNIEL NSIC Oo PARR ACRS 6 Jo Xo SIINELL 2 Ro TEDESCO Go LAINAS 7 M RUSHBROOK Jo KNIGHT 2 Wo PIKE Co ANDERSON So VARGA Io PELTIER Ro BIRKEL LYNCH MD Jo SNELL Ao BOURNIA Wo IGQIE S~ MINER EXTERNAL DISTRIBUTION CONTROL NUMBER
~/Z
ggPPj[gj)t~,('I] ~~i~(gil II'IIIII'ENERAL
ELECTRIC NUCLEAR ENERGY SYSTEMS DIVISION GENERAL ELECTRIC COMPANY, 175 CURTNER AVE. SAN JOSE, CALIFORNIA 95125
~
BWR PROJECTS DEPARTMENT MC 681, (408) 925-3495 Mar-,,364=.7$
September 26, 1977 Office of Nuclear Regulation U.S Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Olan Parr, Chief Light Water Reactor Branch 3 Division of Project Management
SUBJECT:
GE REPORT NEDO 24010 - "TECHNICAL BASIS FOR THE USE OF THE SQUARE ROOT OF THE SUM OF SQUARES (SRSS) METHOD FOR COMBINING DYNAMIC LOADS ON MARK II PLANTS" - JULY, 1977
Reference:
Letter, L. J. Sobon to Olan Parr, dated August 1, 1977 transmitting GE report NEDE 24010-P - TECHNICAL BASIS FOR USE OF THE SQUARE ROOT OF THE SUM OF SQUARES (SRSS) METHOD FOR COMBINING DYNAMIC LOADS ON MARK II PLANTS - JULY, 1977.
Seventy copies of the subject report are being provided by general Electric for the Mark II Owners Group as part of the Mark II Containment Program.
This is the non proprietary version of GE Report NEDE 24010-P transmitted by the above reference.
Any questions regarding this final report should be directed to K.G. Hazifotis, Containment Licensing Engineer, (408) 925-2209.
Sincerel L. J. Sobon, Manager BWR Containment Licensing Containment Improvement Programs LJS:KGH:bjd
Enclosures:
70 cc: R. S. Boyd (NRC) C.J. Anderson (NRC)
H. C. Brinkmann (Mark II Owners Group) J.C. Guibert (NRC)
R. C. DeYoung (NRC)~
L. S. Gifford (GE-Bethesda)
F. Miner (NRC)
R. L. Tedesco (NRC)
J. P. Knight (NRC)
'I 0