Withdrawal of Amendment Request Associated with Mode 4 Residual Heat Removal (RHR) Shutdown Cooling Requirements
ML071710589
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/26/2007
From: Sands S
NRC/NRR/ADRO/DORL/LPLIII-2
To: Allen B
FirstEnergy Nuclear Operating Co
Wengert, Thomas NRR/DORL 415-4037
References
TAC MD2140
Download: ML071710589 (6)


Text

June 26, 2007Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - WITHDRAWAL OFAMENDMENT REQUEST ASSOCIATED WITH MODE 4 RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING REQUIREMENTS (TAC NO.

MD2140)

Dear Mr. Allen:

By letter dated June 1, 2006, you applied for an amendment to the Perry Nuclear Power PlantUnit No. 1 (Perry), Facility Operating License No. NPF-58. The proposed change would have modified the facility technical specifications (TS) pertaining to TS 3.4.10, "Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown," by adding a default Condition to address situations when an RHR Shutdown Cooling subsystem becomes inoperable in MODE 4 and, within the Completion Time of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, an alternate method of decay heat removal cannot be verified to be available. Subsequently, by letter dated June 19, 2007, you withdrew the amendment request. The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment toFacility Operating License with the Office of the Federal Register for publication.Sincerely,/RA/Stephen P. Sands, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear ReactorRegulationDocket No. 50-440

Enclosure:

Notice of Withdrawal cc w/encl: See next page Mr. Barry S. AllenJune 26, 2007Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - WITHDRAWAL OFAMENDMENT REQUEST ASSOCIATED WITH MODE 4 RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING REQUIREMENTS (TAC NO.

MD2140)

Dear Mr. Allen:

By letter dated June 1, 2006, you applied for an amendment to the Perry Nuclear Power PlantUnit No. 1 (Perry), Facility Operating License No. NPF-58. The proposed change would have modified the facility technical specifications (TS) pertaining to TS 3.4.10, "Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown," by adding a default Condition to address situations when an RHR Shutdown Cooling subsystem becomes inoperable in MODE 4 and, within the Completion Time of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, an alternate method of decay heat removal cannot be verified to be available. Subsequently, by letter dated June 19, 2007, you withdrew the amendment request. The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment toFacility Operating License with the Office of the Federal Register for publication.Sincerely,/RA/Stephen P. Sands, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-440

Enclosure:

Notice of Withdrawal cc w/encl: See next pageDISTRIBUTION

NON-PUBLICLPL3-2 R/FRidsNrrPMTWengertRidsNrrLAEWhitt RidsNrrDorlLpl3-2RidsOgcRpRidsAcrsAcnwMailCenterRidsRgn3MailCenter RidsNrrDorlDprRidsNrrPMSSandsADAMS ACCESSION NO: ML071710589NRR-106OFFICELPL3-2/PMLPL3-2/LALPL3-2/BCNAMETWengertEWhittRGibbs(CGratton for)DATE6/25/07 6/25/076/26/07OFFICIAL RECORD COPY Perry Nuclear Power Plant, Unit No. 1 cc:David W. Jenkins, AttorneyFirstEnergy CorporationMail Stop A-GO-1576 South Main StreetAkron, OH 44308Resident Inspector's OfficeU.S. Nuclear Regulatory CommissionP.O. Box 331Perry, OH 44081-0331Regional Administrator, Region IIIU.S. Nuclear Regulatory Commission2443 Warrenville Road, Suite 210Lisle, IL 60532-4531Sue HiattOCRE Interim Representative8275 MunsonMentor, OH 44060Manager, Site Regulatory ComplianceFirstEnergy Nuclear Operating CompanyPerry Nuclear Power PlantMail Stop A-PY-A200P.O. Box 97, 10 Center RoadPerry, OH 44081-0097Mayor, Village of North PerryNorth Perry Village Hall4449 Lockwood RoadNorth Perry Village, OH 44081Donna Owens, DirectorOhio Department of CommerceDivision of Industrial ComplianceBureau of Operations & Maintenance6606 Tussing RoadP.O. Box 4009Reynoldsburg, OH 43068-9009Carol O'Claire, Chief, Radiological BranchOhio Emergency Management Agency2855 West Dublin Granville RoadColumbus, OH 43235-7150Mayor, Village of PerryP.O. Box 100Perry, OH 44081-0100 Dennis ClumRadiological Assistance Section SupervisorBureau of Radiation ProtectionOhio Department of HealthP.O. Box 118Columbus, OH 43266-0118Zack A. Clayton DERROhio Environmental Protection AgencyATTN: Mr. Zack A. ClaytonP.O. Box 1049Columbus, OH 43266-0149ChairmanPerry Township Board of Trustees3750 Center Road, Box 65Perry, OH 44081Daniel Z. FisherTransportation DepartmentPublic Utilities Commission180 East Broad StreetColumbus, OH 43215-3793 James H. LashSenior Vice President of Operations and Chief Operating OfficerFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH 44308Director, Fleet Regulatory AffairsFirstEnergy Nuclear Operating CompanyMail Stop A-GO-276 South Main StreetAkron, OH 44308Joseph J. HaganPresident and Chief Nuclear OfficerFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH 44308 Perry Nuclear Power Plant, Unit No. 1 cc:

Danny L. Pace Senior Vice President, Fleet EngineeringFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH 44308Jeannie M. RinckelVice President, Fleet OversightFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH 44308Manager, Fleet LicensingFirstEnergy Nuclear Operating CompanyMail Stop A-GO-276 South Main StreetAkron, OH 44308Richard AndersonVice President, Nuclear SupportFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH 44308 7590-01-PUNITED STATES NUCLEAR REGULATORY COMMISSIONFIRSTENERGY NUCLEAR OPERATING COMPANYDOCKET NO. 50-440 NOTICE OF WITHDRAWAL OF APPLICATION FORAMENDMENT TO FACILITY OPERATING LICENSEThe U.S. Nuclear Regulatory Commission (the Commission) has granted the request ofFirstEnergy Nuclear Operating Company (the licensee), to withdraw its June 1, 2006, application for proposed amendment to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit No. 1, located in Lake County, Ohio. . The proposed amendment would have modified the facility technical specifications (TS)pertaining to TS 3.4.10, "Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown," by adding a default Condition to address situations when an RHR Shutdown Cooling subsystem becomes inoperable in MODE 4 and, within the Completion Time of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, an alternate method of decay heat removal cannot be verified to be available. The Commission had previously issued a Notice of Consideration of Issuance ofAmendment published in the FEDERAL REGISTER on August 15, 2006 (71 FR 46935).

However, by letter dated June 19, 2007, the licensee withdrew the proposed change.For further details with respect to this action, see the application for amendment datedJune 1, 2006, and the licensee's letter dated June 19, 2007, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm.html. Persons who do not have access to ADAMS or whoencounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr@nrc.gov. Dated at Rockville, Maryland, this 26 th day of June 2007.FOR THE NUCLEAR REGULATORY COMMISSION/RA/Stephen P. Sands, Project ManagerPlant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation