FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Station 10 Center Road Perry, Ohio 44081 Barry S. Allen Vice President 440-280-5382 Fax: 440-280-8029 June 19, 2007 PY-CEI/NRR-3046L ATTN: Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555-0001 Perry Nuclear Power Plant Docket No. 50-440
Subject:
Withdrawal of Two License Amendment Requests Associated with MODE 3 and 4 Residual Heat Removal (RHR) Shutdown Cooling Requirements (TAC Nos. MD2139 and MD2140)
By letters dated June 1, 2006 (PY-CEI/NRR-2963L and PY-CEI/NRR-2964L), FirstEnergy Nuclear'Ope'ratingd Company submitted two license amendment requests involving MODE 3
.and 4,Residu6al H-leat Removal (RHR) Shutdown Cooling System Technical Specifications for Nuclear Re gul0a'tory Commission (NRC) consideration. Based on discussions with the NRC staff,'tfese two license amendment requests are hereby withdrawn. The Technical Specification compliance issues that these two requests were designed to resolve are being discussed with industry organizations for potential generic resolution.
There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager - Fleet Licensing, at (330) 761-6071.
Sincerely, K. Krueger for B. Allen 6cc':