MONTHYEARML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) IR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations ML24206A0572024-07-25025 July 2024 PRM-50-125 - Letter to Alan Blind; Docketing of Petition for Rulemaking and Sufficiency Review Status (10 CFR Part 50) PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000255/20240112024-07-15015 July 2024 Nuclear Plant - Restart Inspection Report 05000255/2024011 PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24137A0142024-07-0202 July 2024 OEDO-24-00011 - 2.206 Petition for Misuse of Palisades Decommissioning Trust Fund (EPID L-2023-CRS-0008) - Letter ML24183A1382024-07-0202 July 2024 Tribal Letter - Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24183A1552024-07-0101 July 2024 Tribal Letter - Red Lake Band of Chippewa Indians ML24156A0222024-07-0101 July 2024 Initiation of Scoping Process to Prepare an Environmental Assessment for the Environmental Review of Holtec Decommissioning International, Llc’S Licensing and Regulatory Requests for Reauthorization of Power Operations at Palisades EPID L-2 ML24183A1542024-07-0101 July 2024 Tribal Letter Red Cliff Band of Lake Superior Chippewa Indians ML24152A1992024-07-0101 July 2024 Richie Garcia, Water Filtration Supervisor-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No. 50-0255 ML24172A0032024-07-0101 July 2024 Letter to L. Powers, Mackinac Bands of Chippewa and Ottawa Indians Re Initiation of Scoping Process for Environ Review Holtec Decommissioning Intl, LLC Request for Reauthorization of Power Ops-Palisades ML24183A1332024-07-0101 July 2024 Tribal Letter-Forest County Potawatomi Community ML24183A1582024-07-0101 July 2024 Tribal Letter Sault Ste. Marie Tribe of Chippewa Indians ML24183A1302024-07-0101 July 2024 Tribal Letter-Chippewa Cree Indians of the Rocky Boys Reservation ML24183A1572024-07-0101 July 2024 Tribal Letter - Saint Croix Chippewa Indians of Wisconsin ML24183A1282024-07-0101 July 2024 Tribal letter-Bay Mills Indian Community ML24183A1532024-07-0101 July 2024 Tribal Letter Quechan Tribe of the Fort Yuma Indian Reservation ML24183A1462024-07-0101 July 2024 Tribal letter-Mille Lacs Band of Ojibwe ML24183A1492024-07-0101 July 2024 Tribal Letter - Pokagon Band of Potawatomi Indians ML24183A1422024-07-0101 July 2024 Tribal Letter-Little Traverse Bay Bands of Odawa Indians ML24183A1312024-07-0101 July 2024 Tribal Letter-Citizen Potawatomi Nation ML24163A0552024-07-0101 July 2024 Rebecca Held Knoche NOAA-Palisades-NOI to Conduct Scoping Process and Prepare an EA - EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24163A2392024-07-0101 July 2024 Sara Thompson, Michigan DNR-Palisades-NOI to Conduct Scoping Process and Prepare an EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24155A0102024-07-0101 July 2024 Quentin L. Messer Jr., Michigan Econ-Palisades-NOI to Conduct Scoping Process and Prep an EA-EPID No. L-2024-LNE-0003 Docket No.50-0255P ML24155A0032024-07-0101 July 2024 Kathy Kowal, Us EPA Region 5-Palisades-NOI to Cibdyct Scoping Process and Prepare an EA EPID L-2024-LNE-0003 ML24163A0832024-07-0101 July 2024 Ltr to R Schumaker SHPO Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1342024-07-0101 July 2024 Tribal Letter-Grand Portage Band of Lake Superior Chippewa ML24183A1392024-07-0101 July 2024 Tribal Letter-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24183A1272024-07-0101 July 2024 Tribal Letter-Bad River Band of the Lake Superior Tribe of Chippewa ML24183A1412024-07-0101 July 2024 Tribal Letter-Little River Band of Ottawa Indians ML24163A1922024-07-0101 July 2024 Jeremy Rubio, Dept of Env, Great Lakes and Energy, Kalamazoo District-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No.50-0255 ML24183A1322024-07-0101 July 2024 Tribal Letter-Fond Du Lac Band of Lake Superior Chippewa ML24183A1592024-07-0101 July 2024 Tribal letter-Sokaogon Chippewa Community ML24163A0822024-07-0101 July 2024 Ltr to J Loichinger Achp Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1252024-07-0101 July 2024 Letter to G. Gould, Swan Creek Black River Confederated Ojibwa-Init of Scoping Process for the Env Rev of Holtec Decommissioning Intl, LLC Request for Reauth of Power Ops at Palisades ML24183A1352024-07-0101 July 2024 Tribal Letter-Hannahville Indian Community ML24183A1442024-07-0101 July 2024 Tribal Letter - Menominee Indian Tribe of Wisconsin ML24183A1502024-07-0101 July 2024 Tribal Letter - Prarie Band Potawatomi Nation ML24183A1452024-07-0101 July 2024 Tribal Letter - Miami Tribe of Oklahoma ML24152A1972024-07-0101 July 2024 Mayor Annie Brown, South Haven-Palisades-NOI to Conduct Scoping and Develop an Environmental Assessment for the Palisades Nuclear Plant Reauthorization of Power Operation 2024-09-06
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000255/20173022017-08-16016 August 2017 NRC Initial License Reexamination Report 05000255/2017302 (Meb) IR 05000255/20153012015-02-18018 February 2015 Er 05000255/2015301; on 01/21/15 - 01/28/15; Entergy Nuclear Operations, Inc., Palisades Nuclear Plant; Initial License Examination Report IR 05000255/20143012014-11-0505 November 2014 Er 05000255/2014301, September 8, 2014 Through October 14, 2014Palisades Initial License Examination Report IR 05000255/20103012010-10-13013 October 2010 Er 05000255-10-301(DRS) on 08/16/10 - 09/01/10 for Palisades Nuclear Plant, Initial License Examination Report IR 05000255/20093012009-06-30030 June 2009 Er 05000255/09-301 (DRS) on 06/01/09 - 06/09/09 for Palisades IR 05000255/20083012008-08-14014 August 2008 Er 05000255-08-301(DRS), on 07/07/2008 - 07/11/2008, Palisades Nuclear Plant, Initial License Examination Report IR 05000255/20073012007-10-22022 October 2007 Er 05000255-07-301, on 09/10/07 - 09/14/07, Palisades Nuclear Plant; Initial License Examination Report ML0608102942006-03-21021 March 2006 03/21/06 Initial License Examination Report 2006-301 IR 05000255/20053012005-07-14014 July 2005 Er 05000255-05-301(DRS); 05/23/2005-06/01/2005; Palisades Nuclear Plant Initial License Examination Report ML0219804662002-07-0909 July 2002 Voluntary Response to NRC Regulatory Issue Summary 2002-09: Preparation and Scheduling of Operator Licensing Examinations 2017-08-16
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 30, 2009 Mr. Christopher J. Schwarz Vice President, Operations Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 SUBJECT: PALISADES NUCLEAR PLANT NRC INITIAL LICENSE EXAMINATION REPORT 05000255/2009301(DRS)
Dear Mr. Schwartz:
On June 9, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process at your Palisades Nuclear Plant. The enclosed report presents the results of the examination which were discussed on June 4 and June 9, 2009, with you and with other members of your staff.
The NRC examiners administered initial license examination operating tests from June 1, 2009 through June 5, 2009. Members of the Palisades Training Department administered the initial license written examination on June 8, 2009, to the applicants. Five senior reactor operator (SRO) and four reactor operator (RO) applicants were administered license examinations. The results of the examinations were finalized on June 22, 2009. All nine applicants passed all sections of their examinations resulting in the issuance of five senior reactor operator and four reactor operator licenses.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). We will gladly discuss any questions you have concerning this examination.
Sincerely,
/RA/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20
Enclosures:
1. Operator Licensing Examination Report 050000255/2009301(DRS) 2. Simulation Facility Report 3. Written Examinations and Answer Keys (RO and SRO)
REGION III==
Docket No: 50-255
License No: DPR-20 Report No: 05000255/2009301(DRS)
Licensee: Entergy Nuclear Operations, Inc. Facility: Palisades Nuclear Plant Location: Covert, MI Dates: June 1 through June 9, 2009 Examiners: N. Valos, Chief Examiner C. Zoia, Examiner D. Reeser, Examiner Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety
SUMMARY OF FINDINGS
ER 05000255/2009301 (DRS); 06/01/09 - 06/09/09; Palisades Nuclear Plant; Initial License Examination Report.
The announced operator licensing initial examination was conducted by regional examiners in accordance with the guidance of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1.
Examination Summary
$ Nine examinations were administered (five senior reactor operator and four reactor operator).
$ All nine applicants passed all sections of their examinations resulting in the issuance of five senior reactor operator and four reactor operator licenses.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other
.1 Initial Licensing Examinations
a. Examination Scope
The NRC examiners conducted an announced operator licensing initial examination during the week of June 1, 2009. The facility licensee's training staff used the guidance prescribed in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, to prepare the outline and develop the written examination and operating test. The examiners administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of June 1 through June 5, 2009. The facility licensee administered the written examination on June 8, 2009. Five senior reactor operator and four reactor operator applicants were examined. During the on-site validation week of May 4, 2009, the examiners audited one license application for accuracy.
b. Findings
Written Examination The NRC examiners determined that the written examination, as originally submitted by the licensee, was within the range of acceptability expected for a proposed examination. All changes made to the submitted examination were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors. The licensee had no post examination comments on the written examination.
Operating Test The NRC examiners determined that the operating test, as originally submitted by the licensee, was within the range of acceptability expected for a proposed examination. All changes made to the submitted examination were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." Examination Results All nine applicants passed all sections of their examinations resulting in the issuance of five senior reactor operator and four reactor operator licenses.
.2 Examination Security
a. Inspection Scope
The NRC examiners briefed the facility contact on the NRC's requirements and guidelines related to examination physical security (e.g., access restrictions and simulator considerations) and integrity in accordance with 10 CFR 55.49, "Integrity of Examinations and Tests," and NUREG-1021, "Operator Licensing Examination Standard for Power Reactors." The examiners reviewed and observed the licensee's implementation and controls of examination security and integrity measures (e.g., security agreements) throughout the examination process.
b. Findings
No findings of significance were identified.
4OA6 Meetings
Exit Meeting The chief examiner presented the examination team's preliminary observations and findings with Mr. C. Schwartz and other members of the licensee management on June 4, 2009. A subsequent exit was held on June 9, 2009, with Mr. J. Iliff following the determination that there were no site post-examination comments. No proprietary information was identified during the exit meeting with the licensee. The licensee acknowledged the observations provided.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- C. Schwartz, Site Vice President
- T. Kirwin, Plant General Manager
- G. Sleeper, Assistant Operations Manager
- J. Moceri, Operations
- T. Mulford, Operations
- P. Pitcher, Operations
- R. White, Operations
- H. Nixon, Training Manager
- S. Martin, Initial License Training Supervisor
- J. Iliff, Training/Examination Author
- P. Schmidt, Training
- P. Anderson, Licensing Manager
- T. Davis, Licensing
NRC
- N. Valos, Chief Examiner
- J. Ellegood, Senior Resident Inspector
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None. LIST OF ACRONYMS
ADAMS Agency-Wide Document Access and Management System CFR Code of Federal Regulations CR Condition Report
DRS Division of Reactor Safety ILT Initial License Training NRC Nuclear Regulatory Commission PARS Publicly Available Records System RO Reactor Operator
SDP Significance Determination Process SRO Senior Reactor Operator
SIMULATION FACILITY REPORT
Facility Licensee: Palisades Nuclear Plant
Facility Licensee Docket No. 50-255
Operating Tests Administered: June 1 through June 5, 2009
The following documents observations made by the NRC examination team during the initial operator license examination. These observations do not constitute audit or inspection findings
and are not, without further verification and review, indicative of non-compliance with 10 CFR 55.45(b). These observations do not affect NRC certification or approval of the simulation facility other than to provide information which may be used in future evaluations. No licensee action is required in response to these observations.
During the conduct of the simulator portion of the operating tests, the following items were observed:
ITEM DESCRIPTION
While following guidance given in the Duty Plant Manager's Book to fill the piping from the Boric Acid Blender to the charging pump suction with 40 gallons of boric acid, an unanticipated 10 gallons of boration occurred. [Condition Report CR-PLP-2009-02981 issued]
1WRITTEN EXAMINATIONS AND ANSWER KEYS (RO/SRO)
RO/SRO Initial Examination ADAMS Accession #ML091680280.