MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000255/20173022017-08-16016 August 2017 NRC Initial License Reexamination Report 05000255/2017302 (Meb) IR 05000255/20153012015-02-18018 February 2015 Er 05000255/2015301; on 01/21/15 - 01/28/15; Entergy Nuclear Operations, Inc., Palisades Nuclear Plant; Initial License Examination Report IR 05000255/20143012014-11-0505 November 2014 Er 05000255/2014301, September 8, 2014 Through October 14, 2014Palisades Initial License Examination Report IR 05000255/20103012010-10-13013 October 2010 Er 05000255-10-301(DRS) on 08/16/10 - 09/01/10 for Palisades Nuclear Plant, Initial License Examination Report IR 05000255/20093012009-06-30030 June 2009 Er 05000255/09-301 (DRS) on 06/01/09 - 06/09/09 for Palisades IR 05000255/20083012008-08-14014 August 2008 Er 05000255-08-301(DRS), on 07/07/2008 - 07/11/2008, Palisades Nuclear Plant, Initial License Examination Report IR 05000255/20073012007-10-22022 October 2007 Er 05000255-07-301, on 09/10/07 - 09/14/07, Palisades Nuclear Plant; Initial License Examination Report ML0608102942006-03-21021 March 2006 03/21/06 Initial License Examination Report 2006-301 IR 05000255/20053012005-07-14014 July 2005 Er 05000255-05-301(DRS); 05/23/2005-06/01/2005; Palisades Nuclear Plant Initial License Examination Report ML0219804662002-07-0909 July 2002 Voluntary Response to NRC Regulatory Issue Summary 2002-09: Preparation and Scheduling of Operator Licensing Examinations 2017-08-16
[Table view] |
Text
ust 14, 2008
SUBJECT:
PALISADES NUCLEAR PLANT INITIAL LICENSED OPERATOR EXAMINATION 05000255/2008301(DRS)
Dear Mr. Schwartz:
On July 14, 2008, Nuclear Regulatory Commission (NRC) examiners completed the initial operator licensing examination process for an examination administered at your Palisades Nuclear Plant. The enclosed report documents the results of the examination and the examination process which was discussed with you and other members of your staff during an exit meeting on July 10, 2008. A memorandum was received from Mr. R. A. White of your staff on July 14, 2008, stating the Palisades Nuclear Plant Training Department personnel had no post examination comments for this examination.
The NRC examiners administered an initial license examination operating test during the week of July 7, 2008. The written examination was administered by Palisades Nuclear Plant training department personnel on July 11, 2008. Two Senior Reactor Operator (SRO) applicants and one Reactor Operator (RO) applicant were administered license examinations. Both SRO applicants were previously licensed ROs at the Palisades Nuclear Plant. The results of the examination were finalized on July 18, 2008. All three applicants passed all sections of their respective examinations and were issued applicable operator licenses.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system
C. Schwarz -2-(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
We will gladly discuss any questions you have concerning this examination.
Sincerely,
/RA by M. Bielby for/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20
Enclosures:
1. Operator Licensing Examination Report 05000255/2008301 2. Simulation Facility Report 3. Written Examinations and Answer Keys (RO/SRO)
REGION III==
Docket No: 50-255 License No: DPR-20 Report No: 05000255/2008-301 Licensee: Entergy Nuclear Operations, Inc.
Facility: Palisades Nuclear Plant Location: Covert, MI Dates: July 7 - 11, 2008 Inspectors: D. McNeil, Chief Examiner C. Moore, Examiner C. Zoia, Examiner Approved by: H. Peterson, Chief Operations Branch Division of Reactor Safety Enclosure 1
SUMMARY OF FINDINGS
ER 05000255/2008301(DRS); 07/07/2008 - 07/11/2008; Palisades Nuclear Plant; Initial License
Examination Report The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9.
- Three license examinations were administered (one reactor operator and two senior reactor operators).
- All applicants passed all sections of their examinations, resulting in the issuance of one reactor operator and two senior reactor operator licenses.
REPORT DETAILS
OTHER ACTIVITIES
4OA5 Other Activities
.1 Initial Licensing Examinations
a. Examination Scope
An announced operator licensing initial examination was conducted during the week of July 07, 2008. The Nuclear Regulatory Commission (NRC) examiners and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, to develop, validate, administer, and grade the written examination and operating test. Members of the facility licensees staff prepared the outline and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of June 9, 2008, with the assistance of members of the facility licensees staff. The NRC examiners administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of July 7, 2008 - July 10, 2008. The facility licensee administered the written examination on July 11, 2008.
b. Findings
Written Examination The NRC examiners determined that the written examination, as originally submitted by the licensee, was within the range of acceptability expected for a proposed examination.
All changes made to the submitted examination, were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, and documented on Form ES-401-9, Written Examination Review Worksheet, which is available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). The licensee had no post-examination comments on the written examination, as stated in a memorandum, dated July 14, 2008, from Mr. R. A. White. The NRC examiners completed the final grading of the written examination on July 17, 2008, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
Operating Test The NRC examiners determined that the operating test, as originally submitted by the licensee, was within the range of acceptability expected for a proposed operating test.
All changes made to the submitted operating test, were made and documented in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." Changes were documented in a document titled, Operating Test Comments, which is available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS).
During administration of the examination, control room JPM f was administered on Monday, July 07, to the RO applicant. It was intended that the two Senior Reactor Operator (SRO) applicants also be administered JPM f. However, the JPM was not scheduled correctly and was missed for the two SRO applicants. This was discovered on Tuesday, July 08, and control room JPM d was administered to the two SRO applicants vice JPM f. This caused the two SRO applicants to receive one more alternate path JPM than specified in NUREG-1021, but does not invalidate the examination results. The NRC examiners completed operating test grading on July 17, 2008.
Examination Results Two applicants at the Senior Reactor Operator (SRO) level and one applicant at the Reactor Operator (RO) level were administered written and operating tests. All applicants passed all sections of their examinations resulting in the issuance of two senior reactor operator and one reactor operator licenses.
.2 Examination Security
a. Scope
The NRC examiners briefed the facility contact on the NRCs requirements and guidelines related to examination physical security (e.g., access restrictions and simulator considerations) and integrity in accordance with 10 CFR 55.49, Integrity of Examinations and Tests, and NUREG-1021, Operator Licensing Examination Standard for Power Reactors. The examiners reviewed and observed the licensees implementation and controls of examination security and integrity measures (e.g., security agreements) throughout the examination process.
b. Findings
No findings of significance were observed in the area of examination security.
4OA6 Management Meetings
Exit Meeting Summary
On July 10, 2008, the inspectors presented an examination status report to Mr. C. Schwarz, and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- C. Schwarz, Site Vice President
- T. Kirwin, Plant General Manager
- S. Martin, Operations Initial Training Superintendent
- B. Nixon, Assistant Operations Manager
- A. Pullam, Acting Training Manager
- M. Sicard, Operations Manager
- R. White, Assistant Operations Manager - Training
Nuclear Regulatory Commission
- D. McNeil, Senior Operations Specialist
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Open, Closed, and
Discussed
None
LIST OF DOCUMENTS REVIEWED