ML16280A335
From kanterella
Revision as of 11:51, 17 November 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML16280A335 | |
Person / Time | |
---|---|
Site: | Limerick |
Issue date: | 09/19/2016 |
From: | David Helker Exelon Generation Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML16357A167 | List:
|
References | |
Download: ML16280A335 (27) | |
Similar Documents at Limerick | |
---|---|
Category:Letter
MONTHYEARML24151A3842024-10-31031 October 2024
[Table view]– Issuance of Amendment Nos. 264 and 226 Support to Digital Modernization Project Installation (EPID L-2023-LLA-0025) and Exemption from the Requirements of 10 CFR 50.62 ML24303A0902024-10-29029 October 2024 Operator Licensing Examination Approval ML24303A2782024-10-29029 October 2024 10 CFR 50.46 Annual Report ML24299A2642024-10-25025 October 2024 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications IR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR 05000352/LER-2024-003, Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK1232024-06-18018 June 2024 Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK123 ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 05000352/LER-2024-002, Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker2024-06-10010 June 2024 Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure 05000352/LER-2024-001, Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit2024-06-10010 June 2024 Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . 2024-09-06 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML23248A2082023-08-31031 August 2023
[Table view]UFSAR Cover Page ML22278A5972022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-15, Revision 46, Sheet 15, P&ID Compressed Air (Service Air: Reactor Enclosure, Unit 1) ML22278A5612022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-10, Sheet 09, Rev. 09, P&ID Service Water ML22278A5882022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-10, Sheet 01, Rev. 65, P&ID Service Water ML22278A5752022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-15, Rev. 45, Sheet 2, P&ID Compressed Air (Instrument Air Compressor 1A, Unit 1) ML22278A5842022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0020, Sheet 6, Rev. 54, P&ID-Fuel Diesel Oil Storage Transfer Star ML22278A5802022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0015, Rev. 3, Sheet 35, P&ID Compressed Air (Instrument Air: Reactor Enclosure, Unit 1) ML22278A5942022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-06, Sheet 07, Rev. 08, P&ID Feedwater ML22278A5852022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing Fd M-0081, Rev. 8, Sheet 1, Functional Description Miscellaneous Structures-HVAC ML22278A5912022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-10, Sheet 01, Rev. 69, P&ID Service Water ML22278A6012022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing Fd M-0078, Rev. 5, Sheet 3, Functional Description Control Enclosure-HVAC ML22278A5722022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-15, Revision 14, Sheet 25, P&ID Compressed Air (Instr. Air: Turbine Encl., Control Structure & Aux. Boiler Turbine Encl. Unit 2 & Common) ML22278A5772022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-15, Revision 2, Sheet 43, P&ID Compressed Air Instrument Air: Reactor Enclosure El. 177 & El. 201, Racks & Panels - Unit 2 ML22278A5692022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-15, Rev. 19, Sheet 17, P&ID Compressed Air (Service Air: Common Facilities & Diesel Generator - Unit 1 & 2) ML22278A5642022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-15, Sheet 29, Rev. 46, P&ID Compressed Air (Service Air: Reactor Enclosure Unit 2) ML22278A5822022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing No. M-0001, Sheet 0003, Rev 028, P&ID Main Steam (Unit 2) ML22278A5502022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0015, Sheet 41, Rev. 13, P&ID Compressed Air Instrument Air Turbine Enclosure ML22278A5932022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-04, Rev. 39, Sheet 3, P&ID Vents & Drains: Heaters 3, 4, 5, & 6 (Unit 1) ML22278A5992022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0009, Sheet 9, Rev. 7, Pid Circulating Water ML22278A5622022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-15, Sheet 06, Rev. 30, P&ID Compressed Air(Instrument Air: Turbine Enclosure El. 217. Unit 1) ML22278A5662022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-15, Rev. 2, Sheet 39, P&ID Compressed Air (Instrument Air: Turbine Enclosure El. 239 & 269 Racks & Panels, Unit 1) ML22278A5582022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-15, Sheet 11, Rev. 16, P&ID Compressed Air(Instrument Air: Reactor Enclosure Unit 1) ML22278A5532022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0020, Sheet 7, Rev. 60, Pid Fuel and Diesel Oil Storage Transfer (Lube Oil System Unit 1) ML22278A5552022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing No. M-0000, Sheet 0002, Rev 046, Piping & Instrumentation Diagram Legend ML22278A5592022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0020, Sheet 6, Rev. 56, P&ID-Fuel Diesel Oil Storage Transfer Star ML22278A5672022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing No. Fd M-0061, Sheet 0002, Rev 003, Functional Description Liquid Radwaste Collection ML22278A5522022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-09, Revision 64, Sheet 3, P&ID Circulating Water (Unit 1 and Common) ML22278A5682022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-15, Rev. 50, Sheet 14, P&ID Compressed Air (Service Air: Turbine Enclosure Unit 1) ML22278A6002022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0015, Sheet 33, Rev. 5, PID-Compressed Air Inst ML22278A5902022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-08, Sheet 01, Rev. 44, P&ID Condensate and Refueling Water Storage ML22278A5542022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0016, Sheet 3, Rev. 15, Pid Condensate Filter Demineralizers and Deep Bed Demineralizers ML22278A5782022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-10, Sheet 08, Rev. 31, P&ID Service Water ML22278A5862022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0015, Sheet 12, Rev. 43, Pid Compressed Air Inst Air Reactor Enclosure ML22278A5492022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing No. M-0000, Sheet 0001, Rev 042, Piping and Instrumentation Diagram Legend ML22278A5872022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing Fd M-0076, Rev. 11, Sheet 1, Functional Description Reactor Enclosure-HVAC ML22278A5712022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-06, Revision 26, Sheet 6, P&ID Feedwater (Unit 2) ML22278A5732022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing Fd M-0076, Sheet 10, Rev 11, Functional Description Reactor Enclosure-HVAC ML22278A5952022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0006, Sheet 9, Rev. 14, P&ID Hydrogen Water Chemistry System Unit 1, 2, and Common ML22278A5562022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-09, Sheet 01, Rev. 49, P&ID Circulating Water ML22278A5602022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-10, Rev. 67, Sheet 4, P&ID Service Water ML22278A5472022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0015, Sheet 23, Rev. 09, Pid Compressed Air Instr Air Turbine Enclosure EL.239 Ft ML22278A5572022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-06, Sheet 08, Rev. 09, P&ID Feedwater ML22278A5792022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-04, Revision 41, Sheet 1, P&ID Vents & Drains: Heaters 3, 4, 5, & 6 (Unit 1) ML22278A5982022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-14, Revision 35, Sheet 1, P&ID Turbine Enclosure Cooling Water (Unit 1) ML22278A5832022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0002, Sheet 01, Rev. 042, P&ID Extraction Steam ML22278A5812022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-20, Revision 39, Sheet 3, P & I Diagram Fuel & Diesel Oil Storage & Transfer (Fuel Oil & Transfer System Unit 1) ML22278A5962022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0007, Rev. 26, Sheet 3, Pid Air Removal and Sealing Steam ML22278A5742022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0015, Rev. 1, Sheet 34, P&ID Compressed Air (Instrument Air: Reactor Enclosure, Unit 1) ML22278A5762022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0010, Sheet 7, Rev. 25, PID-Service Water ML22278A5892022-09-19019 September 2022 Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0015, Sheet 0018, Rev 014, P&ID Compressed Air Instrument Air Compres 2023-08-31 |
Retrieved from "https://kanterella.com/w/index.php?title=ML16280A335&oldid=178277"