NRC Staff Submits Supplement 40 to the Hearing File for the Watts Bar Nuclear Plant (Unit 2)
ML13135A448
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 05/15/2013
From: Roth D
NRC/OGC
To: Abramson P, Gary Arnold, Paul Ryerson
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 24528, 50-391-OL, ASLBP 09-893-01-OL-BD01
Download: ML13135A448 (7)


Text

UNITED STATESNUCLEAR REGULATORY COMMISSIONWASHINGTON, DC 20555 - 0001 May 15, 2013

Administrative Judge Paul S. Ryerson, Chair Atomic Safety and Licensing Board Panel

Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel

Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

In the Matter of TENNESSEE VALLEY AUTHORITY (Watts Bar Nuclear Plant Unit 2) Docket No. 50-391-OL; ASLBP No. 09-893-01-OL-BD01

Dear Administrative Judges:

The NRC Staff hereby submits Supplement 40 to the hearing file for the Watts Bar Nuclear Plant (Unit 2) OL proceeding, Docket No. 50-391-OL.

Pursuant to the agreement of the parties, disclosures and the hearing file may be limited to final

non-privileged documents relevant to the admitted contentions. Further, historical versions of the application need not be listed and privilege logs are waived.

This supplement to the hearing file includes materials required pursuant to 10 C.F.R. § 2.1203, as well as the Staff's mandatory disclosures produced pursuant to 10 C.F.R. § 2.336, as modified by the agreement. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System ("ADAMS"). An index containing the ADAMS accession number, date, and title or description of public each item in the hearing file is appended hereto as Attachment 1.

The Staff has taken a broad approach in identifying potentially-relevant documents for inclusion in the disclosures and hearing file. Additional public documents associated with the application, but not relevant to the admitted contention, are readily accessible in ADAMS. In addition, pursuant to the agreement of the parties, the Staff will continue to work with both parties to provide access to documents.

On or around May 15, 2013, the supplement to the hearing file will be made available via the Electronic Hearing Docket ("EHD"), which may be accessed at the following URL:

http://adams.nrc.gov/ehd/. The hearing file will be contained in a sub-folder entitled, "Watts Bar Hearing File" of the "Watts_Bar_50-391-OL" folder of the EHD.

Further, attached is the affidavit of Justin C. Poole certifying that all relevant materials required under the agreement of the parties by this section have been disclosed, and that the disclosures are accurate and complete for documents identified as of May 14, 2013.

Sincerely,

/

Signed (electronically) by/

David Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel

Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov Signed: May 15, 2013

Enclosures:

Attachment 1 - Public Hearing File Index

Affidavit of Justin C. Poole

May 15, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL ) (Watts Bar Nuclear Plant, Unit 2) )

AFFIDAVIT OF JUSTIN C. POOLE CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Justin C. Poole, do hereby state as follows:

1. I am employed as Senior Project Manager, Plant Licensing Branch LPL II-2, in the Division of Operator Reactor Licensing in the U.S. Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. My responsibilities include oversight of the NRC Staff's review and evaluation of the Watts Bar Nuclear Plant, Unit 2 operating license application ("OLA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the OLA at issue in this proceeding. 2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 and 2.1203, as modified by the parties' agreement of December 1, 2009, have been disclosed, and that the disclosures are accurate and complete for documents identified as of May 14, 2013.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

/Executed in Accord with 10 CFR 2.304(d)

/ Justin C. Poole Senior Project Manager, NRR/DORL/LPL II-2 U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: (301)415-2048 E-mail:

Justin.Poole@nrc.gov Date Signed: May 15, 2013

ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - May 15, 2013 1 ID# Accession Number Document Date Title 40-001 ML13107B494 4/17/201304/16/2013 Meeting Summary with the Public to Discuss the Annual Assessment of the Watts Bar Nuclear Unit 2 Construction Project.40-002 ML13095A403 4/9/201304/29/2013 Notice of Meeting with Tennessee Valley Authority (TVA) Regarding Extension Request to Respond to Recommendation 2.1, Flooding, of Near-Term Task Force Review of Insights from Fukushima Da-ichi Accident for Sequoyah Nuclear Plant

& Watts Bar.40-003 ML13099A350 3/7/20132013/03/07 Watts Bar 2 OL - 2012-03-07 - WBN Project Plan - Unit 2.pdf 40-004 ML13099A353 3/7/20132013/03/07 Watts Bar 2 OL - TVA letter to NRC_03-06-13_2-PTI-068-13 transmittal to NRC 40-005 ML13099A349 3/11/20132013/03/11 Watts Bar 2 OL - 2012-03-11 - WBN Project Plan - Unit 2.pdf 40-006 ML13099A372 3/12/20132013/03/12 Watts Bar 2 OL - TVA letter to NRC_03-12-2013_Code Transition Change to two Previous Statements40-007 ML13099A360 3/13/20132013/03/13 Watts Bar 2 OL - TVA letter to NRC_03-13-2013_WBN2 Transmittal of Revised Unit 1 Unit 2 As Designed FPR 40-008 ML13099A344 3/14/20132013/03/14 Watts Bar 2 OL - 2012-03-14 - WBN Project Plan - Unit 2.pdf 40-009 ML13099A341 3/18/20132013/03/18 Watts Bar 2 OL - 2012-03-18 - WBN Project Plan - Unit 2.pdf 40-010 ML13099A369 3/18/20132013/03/18 Watts Bar 2 OL - TVA letter to NRC_03-18-13_FSEIS Document Submittal 40-011 ML13099A370 3/18/20132013/03/18 Watts Bar 2 OL - TVA letter to NRC_03-18-2013_CAT II Cable Letter 40-012 ML13099A336 3/21/20132013/03/21 Watts Bar 2 OL - 2012-03-21 - WBN Project Plan - Unit 2.pdf 40-013 ML13099A438 3/21/20132013/03/21 Watts Bar 2 OL - TVA letter to NRC_03-21-13_TS 3.3.1 RAI Response 40-014 ML13099A436 3/26/20132013/03/26 Watts Bar 2 OL - TVA letter to NRC_03-26-13_2-PTI-002-02 & 2-PTI-084-01 transmittal to NRC 40-015 ML13099A334 3/28/20132013/03/28 Watts Bar 2 OL - 2012-03-28 - WBN Project Plan - Unit 2.pdf 40-016 ML13109A556 4/19/20135/7/2013 Notice of Meeting With Tennessee Valley Authority To Obtain Additional Information To Allow NRC To Make Subsequent Significance Determination & Enforcement Decisions Related To Three Apparent Violations Identified In NRC Inspection Report .....

ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - May 15, 2013 2 ID# Accession Number Document Date Title 40-017 ML13107B505 4/17/2013Public Meeting Summary Watts Bar Nuclear Plant Unit 2 Presentation (NRC Inspection Report 05000391/2013601.40-018 ML13120A132 4/29/2013Sequoyah and Watts Bar Nuclear Plants, Units 1 and 2 - NTTF Recommendation 2.1, Flooding Hazard Reevaluation Report Extension Request.40-019 ML13108A107 4/16/2013Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Commitment to Install Improved Flood Mitigation Systems.40-020 ML13121A062 4/26/2013Tennessee Valley Authority - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012.40-021 ML13092A362 4/2/2013Tennessee Valley Authority Public Meeting Summary.40-022 ML13121A427 4/29/2013Watts Bar, Unit 2 - Construction Deficiency Report 50-391/2013 Instrument Sense Line Slope Issue-Interim Report.40-023 ML13120A004 4/25/2013Watts Bar, Units 1 and 2 - 10 CFR 50.46 30-Day Report of Changes and Errors to the Calculated Peak Cladding Temperatures and Annual Report for 2012.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

In the Matter of )

) TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL ) (Watts Bar Nuclear Plant, Unit 2) )

CERTIFICATE OF SERVICE

Pursuant to 10 C.F.R. § 2.305 (revised), I hereby certify that copies of the foregoing "NRC STAFF'S SUPPLEMENTAL DISCLOSURE 40, INCLUDING PUBLIC HEARING FILE INDEX, PROTECTED HEARING FILE INDEX, AND AFFIDAVIT OF JUSTIN C. POOLE" dated April 15, 2013, have been served upon the Electronic Information Exchange, the NRC's E-Filing System, in the above captioned proceeding, this 15th day of May, 2013:

/Signed (electronically) by/

David E. Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel

Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov

Signed: May 15, 2013