NRC Staff Watts Bar Discovery Update 33 Oct 2012
ML12289A422
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 10/15/2012
From: Catherine Kanatas
NRC/OGC
To: Abramson P, Gary Arnold, Lawrence Mcdade
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 23626, 50-391-OL, ASLBP 09-893-01-OL-BD01
Download: ML12289A422 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 October 15, 2012 Administrative Judge Administrative Judge Lawrence G. McDade, Chair Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of TENNESSEE VALLEY AUTHORITY (Watts Bar Nuclear Plant Unit 2)

Docket No. 50-391-OL; ASLBP No. 09-893-01-OL-BD01

Dear Administrative Judges:

The NRC Staff hereby submits Supplement 33 to the hearing file for the Watts Bar Nuclear Plant (Unit 2) OL proceeding, Docket No. 50-391-OL.

Pursuant to the agreement of the parties, disclosures and the hearing file may be limited to final non-privileged documents relevant to the admitted contentions. Further, historical versions of the application need not be listed and privilege logs are waived.

This supplement to the hearing file includes materials required pursuant to 10 C.F.R. § 2.1203, as well as the Staffs mandatory disclosures produced pursuant to 10 C.F.R. § 2.336, as modified by the agreement. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. An index of documents protected due to proprietary or security concerns is appended as Attachment 2.

The Staff has taken a broad approach in identifying potentially-relevant documents for inclusion in the disclosures and hearing file. Additional public documents associated with the application, but not relevant to the admitted contention, are readily accessible in ADAMS. In addition,

pursuant to the agreement of the parties, the Staff will continue to work with both parties to provide access to documents On or around October 15, 2012, the supplement to the hearing file will be made available via the Electronic Hearing Docket (EHD), which may be accessed at the following URL:

http://adams.nrc.gov/ehd/. The hearing file will be contained in a sub-folder entitled, Watts Bar Hearing File" of the Watts_Bar_50-391-OL" folder of the EHD.

Further, attached is the affidavit of Justin C. Poole certifying that all relevant materials required under the agreement of the parties by this section have been disclosed, and that the disclosures are accurate and complete for documents identified as of October 10, 2012.

Sincerely,

/Signed (electronically) by/

Catherine Kanatas Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2321 E-mail: Catherine.Kanatas@nrc.gov Signed: October 15, 2012

Enclosures:

Attachment 1 - Hearing File Index Attachment 2 - Protected Index Affidavit of Justin C. Poole cc: Service List

ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - October 15, 2012 Accession ID# Document Date Title Number ML12263A019 03/31/1995 Biological Opinion for the Proposed Operation of the Watts Bar Nuclear Plant.

33-0001 ML12279A197 08/30/2012 2012/08/30 Watts Bar 2 OL - 2012-08 WBN Project Plan - Unit 2.pdf 33-0002 ML12279A191 09/06/2012 2012/09/06 Watts Bar 2 OL - TVA letter to NRC_09-06-2012_Cherokee and Douglas Dam Analysis 33-0003 ML12279A194 09/10/2012 2012/09/10 Watts Bar 2 OL - 2012-09 WBN Project Plan - Unit 2.pdf 33-0004 ML12279A192 09/17/2012 2012/09/17 Watts Bar 2 OL - 2012-09 WBN Project Plan - Unit 2.pdf 33-0005 ML12279A196 09/20/2012 2012/09/20 Watts Bar 2 OL - 2012-09 WBN Project Plan - Unit 2.pdf 33-0006 ML12279A195 09/20/2012 2012/09/20 Watts Bar 2 OL - 2012-09 WBN Project Plan - Unit 2.pdf 33-0007 2012/09/26 Watts Bar 2 OL - ACCEPTANCE OF REQUESTED LICENSING ACTION REGARDING REQUEST TO USE AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

ML12279A199 09/26/2012 33-0008 BOILER AND PRESSURE VESSEL CODE, CODE CASES N-520-4 and N-520-5 (TAC NO.

ME9299)

ATTACHMENT 2 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES PROTECTED FILE INDEX Supplemental Disclosures - October 15, 2012 Accession Document ID # Protected Reason Title Number Date Watts Bar Nuclear Plant, Unit 2 - Resolution of Concerns With Fire ML12263A246 09/13/2012 33-P0001 Security Protection Report Operator Manual Action 723 - Fire Protection Report Part Vl, "Fire Hazards Analysis".

Watts Bar Nuclear Plant, Unit 2 - Resolution of Concerns With Fire ML12263A247 09/13/2012 33-P0002 Security Protection Report Operator Manual Action 723 - Part VI - Fire Hazards Analysis.

ML12263A245 09/13/2012 Watts Bar Nuclear Plant, Unit 2 - Resolution of Concerns with Fire 33-P0003 Security Protection Report Operator Manual Action 732.

ML12279A187 09/14/2012 2012/09/14 Watts Bar 2 OL - TVA letter to NRC_09-13-2012_OMA 732 33-P0004 Security Commitment Update

October 15, 2012 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL

)

(Watts Bar Nuclear Plant, Unit 2) )

AFFIDAVIT OF JUSTIN C. POOLE CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Justin C. Poole, do hereby state as follows:

1. I am employed as Senior Project Manager, Plant Licensing Branch LPL II-2, in the Division of Operator Reactor Licensing in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. My responsibilities include oversight of the NRC Staffs review and evaluation of the Watts Bar Nuclear Plant, Unit 2 operating license application (OLA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the OLA at issue in this proceeding.
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 and 2.1203, as modified by the parties agreement of December 1, 2009, have been disclosed, and that the disclosures are accurate and complete for documents identified as of October 10, 2012.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

/Executed in Accord with 10 CFR 2.304(d)/

Justin C. Poole Senior Project Manager, NRR/DORL/LPL II-2 U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: (301)415-2048 E-mail: Justin.Poole@nrc.gov Executed in Rockville Maryland this 15th day of October, 2012

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL

)

(Watts Bar Nuclear Plant, Unit 2) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (revised), I hereby certify that copies of the foregoing NRC STAFF'S SUPPLEMENTAL DISCLOSURE, INCLUDING HEARING FILE INDEX, PROTECTED INDEX, AND AFFIDAVIT OF JUSTIN C. POOLE dated October 15, 2012, have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 15th day of October, 2012:

/Signed (electronically) by/

Catherine Kanatas Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2321 E-mail: Catherine.Kanatas@nrc.gov Signed: October 15, 2012