UNITE D STATE S N UCLEAR REGULATORY C OMMI SS I ON WASHINGTON, DC 20555 - 0001 February 15, 2012 Administrative Judge Administrative Judge Lawrence G. McDade, Chair Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of TENNESSEE VALLEY AUTHORITY (Watts Bar Nuclear Plant Unit 2)
Docket No. 50-391-OL; ASLBP No. 09-893-01-OL-BD01
Dear Administrative Judges:
The NRC Staff hereby submits Supplement 25 to the hearing file for the Watts Bar Nuclear Plant (Unit 2) OL proceeding, Docket No. 50-391-OL.
Pursuant to the agreement of the parties, disclosures and the hearing file may be limited to final non-privileged documents relevant to the admitted contentions. Further, historical versions of the application need not be listed and privilege logs are waived.
This supplement to the hearing file includes materials required pursuant to 10 C.F.R. § 2.1203, as well as the Staffs mandatory disclosures produced pursuant to 10 C.F.R. § 2.336, as modified by the agreement. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. An index of documents protected due to proprietary or security concerns is appended as Attachment 2.
The Staff has taken a broad approach in identifying potentially-relevant documents for inclusion in the disclosures and hearing file. Additional public documents associated with the application, but not relevant to the admitted contention, are readily accessible in ADAMS. In addition,
L. McDade February 15, 2012 P. Abramson G. Arnold pursuant to the agreement of the parties, the Staff will continue to work with both parties to provide access to documents On or around February 15, 2012, the supplement to the hearing file will be made available via the Electronic Hearing Docket (EHD), which may be accessed at the following URL:
http://adams.nrc.gov/ehd/. The hearing file will be contained in a sub-folder entitled, Watts Bar Hearing File" of the Watts_Bar_50-391-OL" folder of the EHD.
Further, attached is the affidavit of Justin C. Poole certifying that all relevant materials required under the agreement of the parties by this section have been disclosed, and that the disclosures are accurate and complete for documents identified as of February 15, 2012.
Sincerely,
/Signed (electronically) by/
David E. Roth Counsel for NRC Staff
Enclosures:
Attachment 1 - Hearing File Index Attachment 2 - Protected Index Affidavit of Justin C. Poole cc: Service List
ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - February 15, 2012 Accession Document ID# Number Date Title 25-001 ML120190571 01/20/2012 02/02/2012 Notice of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Submittals.25-002 ML12018A404 12/06/2011 2011/12/06 Watts Bar 2 OL - WATTS BAR 2 APPENDIX HH Status 12-06-11.docx 25-003 ML12018A466 12/12/2011 2011/12/12 Watts Bar 2 OL - DRAFT Request for Additional Information Regarding Open Item 98 25-004 ML12013A038 12/12/2011 2011/12/12 Watts Bar 2 OL - NRC PM Open Items List 12-13-11.docx 25-005 ML12018A465 12/12/2011 2011/12/12 Watts Bar 2 OL - Watts Bar hearing emails for November 25-006 ML12018A464 12/13/2011 2011/12/13 Watts Bar 2 OL - FW: NRC PM Open Items List 12-16-11.docx 25-007 ML12018A463 12/21/2011 2011/12/21 Watts Bar 2 OL - FW: EPA's comments on the DFEIS Related to the Operation of Watts Bar Nuclear Plant...25-008 ML12018A397 12/21/2011 2011/12/21 Watts Bar 2 OL - Tennessee DOT - No Comment Letter 25-009 ML12018A462 12/21/2011 2011/12/21 Watts Bar 2 OL - TVA letter to NRC_12-20-2011_Regulatory Framework Submittal Letter Rev 7
25-010 ML12018A408 12/22/2011 2011/12/22 Watts Bar 2 OL - NRC PM Open Items List 1-3-12 25-011 ML12018A411 12/22/2011 2011/12/22 Watts Bar 2 OL - TVA letter to NRC_12-22-11_2-PTI-099-04 transmittal to NRC 25-012 ML12018A410 12/22/2011 2011/12/22 Watts Bar 2 OL - TVA letter to NRC_12-22-2011_I&C RAI Response 25-013 ML12018A407 12/29/2011 2011/12/29 Watts Bar 2 OL - Transcripts from Public Comment Meeting Held on 12/08/2011 Related to Draft Final Environmental Statement 25-014 ML12018A403 01/03/2012 2012/01/03 Watts Bar 2 OL - NRC PM Open Items List 01-04-12.docx
ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - February 15, 2012 Accession Document ID# Number Date Title 25-015 ML12018A402 01/03/2012 2012/01/03 Watts Bar 2 OL - RE: Additional Questions on Appendix HH Item 98 25-016 ML12018A401 01/04/2012 2012/01/04 Watts Bar 2 OL - NRC PM Open Items List 01-05-12.docx 25-017 ML12013A037 01/05/2012 2012/01/05 Watts Bar 2 OL - NRC PM Open Items List 01-06-12.docx 25-018 ML12018A398 01/06/2012 2012/01/06 Watts Bar 2 OL - NRC PM Open Items List 01-09-12 (2).docx 25-019 ML12018A400 01/06/2012 2012/01/06 Watts Bar 2 OL - SACE opposition to TVA motion documents25-020 ML12023A199 01/12/2012 2012/01/12 Watts Bar 2 OL - TVA letter to NRC_01-12-12 Boron Dilution Response 25-021 ML12023A198 01/12/2012 2012/01/12 Watts Bar 2 OL - Updated HH Open Item Status Lists25-022 ML12023A197 01/16/2012 2012/01/16 Watts Bar 2 OL - NRC PM Open Items List 01-17-12.docx 25-023 ML12023A194 01/18/2012 2012/01/18 Watts Bar 2 OL - FW: Updated HH Open Item Status Lists25-024 ML12023A195 01/18/2012 2012/01/18 Watts Bar 2 OL - NRC PM Open Items List 01-19-12.docx 25-025 ML12023A200 01/18/2012 2012/01/18 Watts Bar 2 OL - TVA letter to NRC_01-17-12_2-PTI-030L-01 transmittal to NRC 25-026 ML12023A192 01/19/2012 2012/01/19 Watts Bar 2 OL - NRC PM Open Items List 01-20-12.docx 25-027 ML12023A191 01/19/2012 2012/01/19 Watts Bar 2 OL - TVA letter to NRC_01-19-2012_I&C RAI Response 25-028 ML12023A189 01/20/2012 2012/01/20 Watts Bar 2 OL - NRC PM Open Items List 01-23-12.docx 25-029 ML12023A185 01/23/2012 2012/01/23 Watts Bar 2 OL - FW: Comments and Recommendations on the Draft Supplemental Environmental Impact Statement (SEIS) Related to the Operation of Watts Bar Nuclear Plant, Unit 2, Supplement 2 in Rhea County, TN - ER 11-1021
ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - February 15, 2012 Accession Document ID# Number Date Title 25-030 ML12023A186 01/23/2012 2012/01/23 Watts Bar 2 OL - NRC PM Open Items List 01-24-12.docx 25-031 ML12030A013 01/24/2012 2012/01/24 Watts Bar 2 OL - Draft Questions on Technical Specifications25-032 ML12030A014 01/24/2012 2012/01/24 Watts Bar 2 OL - FW: Request for Meeting 25-033 ML12030A016 01/24/2012 2012/01/24 Watts Bar 2 OL - FW: Request for Meeting 25-034 ML12030A017 01/24/2012 2012/01/24 Watts Bar 2 OL - NRC PM Open Items List 01-25-12.docx 25-035 ML12030A018 01/26/2012 2012/01/26 Watts Bar 2 OL - RE: Comments on draft Supplement 2 to the Final Environmental Statement Related to the Operation of Watts Bar Unit 2 25-036 ML12030A019 01/26/2012 2012/01/26 Watts Bar 2 OL - Talking point for the meeting on Feb 2 25-037 ML12045A038 01/27/2012 2012/01/27 Watts Bar 2 OL - Comments on Watts Bar 2 DFES from SACE 25-038 ML12030A020 01/27/2012 2012/01/27 Watts Bar 2 OL - Updated Appendix HH Open Item status list 25-039 ML12030A021 01/30/2012 2012/01/30 Watts Bar 2 OL - NRC PM Open Items List 01-30-12 .docx 25-040 ML12045A037 01/30/2012 2012/01/30 Watts Bar 2 OL - NRC PM Open Items List 01-31-12 .docx 25-041 ML12045A039 01/30/2012 2012/01/30 Watts Bar 2 OL - Talking points for the meeting on Thursday 25-042 ML12045A040 02/01/2012 2012/02/01 Watts Bar 2 OL - FW: Docket ID NRD-2008-0369 - Comments to NRC on Draft SFES - WBN Unit 2 25-043 ML12045A033 02/01/2012 2012/02/01 Watts Bar 2 OL - NRC PM Open Items List 02-03-12 .docx 25-044 ML12045A030 02/02/2012 2012/02/02 Watts Bar 2 OL - TVA letter to NRC_02-01-2012_I&C RAI Response
ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - February 15, 2012 Accession Document ID# Number Date Title 25-045 ML12045A035 02/02/2012 2012/02/02 Watts Bar 2 OL - WBN2 - Construction Refurbishment 25-046 ML12045A027 02/03/2012 2012/02/03 Watts Bar 2 OL - NRC PM Open Items List 02-06-12 .docx 25-047 ML12045A024 02/07/2012 2012/02/07 Watts Bar 2 OL - NRC PM Open Items List 02-08-12 .docx 25-048 ML12045A026 02/08/2012 2012/02/08 Watts Bar 2 OL - TVA letter to NRC_02-07-12_2-PTI-030J-02; 2-PTI-063-02; 2-PTI-099-08 transmittal to NRC 25-049 ML12019A272 01/17/2012 2-PTI-030L-01, Rev. 0, "Watts Bar Nuclear Plant (WBN) Unit 2 - Submittal of Pre-op Test Instruction."25-050 ML12018A214 12/22/2011 Attachment 3 - TVA Calculation EPM-MCP-071689, "Cooling/Heating Load & Equipment/Component Performance Analysis for the Control Building Electrical Board Room Areas (EL. 692.0 & 708.0)," Revision
- 21. (Letter Item 4, SSER 23 Appendix HH Item Number 108).25-051 ML12018A215 08/14/2011 Attachment 4 - TVA Calculation EPM-LCP-072489, "Cooling and Heating Load Analysis, Main Control Room HVAC," Revision 14 (Letter Item 4, SSER 23 Appendix HH Item Number 108).25-052 ML12018A216 02/28/2011 Attachment 6 - WEC Non-Proprietary Document EQ-QR-68-WBT-NP, "Qualification Summary Report for Post-Accident Monitoring System (PAMS)," Revision 0 (Letter Item 4, SSER 23 Appendix HH Item Number 108).25-053 ML12018A217 11/22/2011 Attachment 8 - TVA Design Criteria Document WB-DC-40-24, "Radiation Monitoring (Unit 1 /Unit 2),"
Revision 24, dated November 30, 2011 (Letter Item 6).25-054 ML12012A113 01/04/2012 Comment (3) by Anonymous Individual Opposing Draft Supplement 2 to FEIS re Operations of Watts Bar Unit 2.25-055 ML12030A100 01/24/2012 Comment (4) of Diane Curran, on Behalf of Southern Alliance for Clean Energy, on Environmental Impact Statement Related to the Operation of Watts Bar Nuclear Plant, Unit 2.
ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - February 15, 2012 Accession Document ID# Number Date Title 25-056 ML12040A052 01/27/2012 Comment (5) of Brenda E. Brickhouse of Tennessee Valley Authority on the Draft Supplement 2 to Final Environmental Statement Related to the Operation of Watts Bar Nuclear Plant, Unit 2.25-057 ML12034A202 02/03/2012 IR 05000391-11-610, on 12/31/2011, Watts Bar Nuclear Plant, Unit 2, Construction-NRC Integrated Inspection.25-058 ML12011A024 11/30/2011 NUREG-0847, Supp. 25, "Safety Evaluation Report, Related to the Operation of Watts Bar Nuclear Plant, Unit 2".25-059 ML12041A393 02/07/2012 Watts Bar Nuclear Plant (WBN) Unit 2 - Submittal of Pre-op Test Instructions.25-060 ML12018A213 12/22/2011 Watts Bar Nuclear Plant, Unit 2 - Instrumentation and Controls Staff Information Requests.25-061 ML120050183 01/19/2012 Watts Bar Nuclear Plant, Unit 2 - Request for Relief Regarding Use of American Society of Mechanical Engineers Boiler & Pressure Vessel Code Cases N-801 & N-802 (TAC No. ME7063).25-062 ML12005A228 01/18/2012 Watts Bar Nuclear Plant, Unit 2 - Status of Operating License Application Review Regarding Fire Protection Program (TAC NO. ME2731).25-063 ML12034A164 02/01/2012 Watts Bar, Unit 2 - Instrumentation and Controls Staff Information Requests.25-064 ML12011A044 09/01/2011 Watts Bar, Unit 2 - Relief Request to Use American Society of Mechanical Engineers (ASME) Code Cases N-801 and N-802.25-065 ML12018A315 01/12/2012 Watts Bar, Unit 2, Final Safety Analysis Report - Chapter 15.2.4 Inadvertent Boron Dilution.25-066 ML12034A166 01/31/2012 Watts Bar, Unit 2, WBT-D-3753 NP-Enclosure - Clarification of Dielectric Withstand Testing in Response to WNA-CN-00157-WBT.25-067 ML12009A072 12/27/2011 Watts Bar, Units 1 and 2, Notification of National Pollutant Discharge Elimination System Permit Modification.
ATTACHMENT 2 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES PROTECTED FILE INDEX Supplemental Disclosures - February 15, 2012 Accession Document ID # Number Date Protected Reason Title 25-P001 ML12018A218 02/28/2011 Proprietary Attachment 5 - WEC proprietary Document EQ-QR-68-WBT-P, "Qualification Summary Report for Post-Accident Monitoring System (PAMS)," Revision 0 (Letter Item 4, SSER 23 Appendix HH Item Number 108).
25-P002 ML12034A167 01/31/2012 Proprietary Watts Bar, Unit 2 - WBT-D-3753 P-Enclosure - Clarification of Dielectric Withstand Testing in Response to WNA-CN-00157-WBT.
25-P003 ML12030A012 01/24/2012 Fire-Protection 2012/01/24 Watts Bar 2 OL - FW: WBN Unit 2 Appendix R Deviation Request 25-P004 ML12026A820 01/25/2012 Security-Related Assessment Follow Up Letter For Security - Watts Bar Nuclear Plant.
February 15, 2012 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL
)
(Watts Bar Nuclear Plant, Unit 2) )
AFFIDAVIT OF JUSTIN C. POOLE CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
I, Justin C. Poole, do hereby state as follows:
- 1. I am employed as Senior Project Manager, Watts Bar Special Projects Branch, in the Division of Operator Reactor Licensing in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. My responsibilities include oversight of the NRC Staffs review and evaluation of the Watts Bar Nuclear Plant, Unit 2 operating license application (OLA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the OLA at issue in this proceeding.
- 2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 and 2.1203, as modified by the parties agreement of December 1, 2009, have been disclosed, and that the disclosures are accurate and complete for documents identified as of February 15, 2012.
- 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
/Signed (electronically) by/
Justin C. Poole Senior Project Manager, NRR/DORL/LPWB U.S. Nuclear Regulatory Commission Washington, DC 20005 Telephone: (301)415-2048 E-mail: Justin.Poole@nrc.gov Executed in Rockville, Maryland this 15th day of February, 2012
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL
)
(Watts Bar Nuclear Plant, Unit 2) )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing NRC STAFF'S SUPPLEMENTAL DISCLOSURE, INCLUDING HEARING FILE INDEX, PROTECTED INDEX, AND AFFIDAVIT OF JUSTIN C.
POOLE, dated February 15, 2012, have been served upon the following by the Electronic Information Exchange, this 15th day of February, 2012:
Administrative Judge Office of Commission Appellate Lawrence G. McDade, Chair Adjudication Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Mail Stop: O-16G4 Mail Stop: T-3 F23 Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: OCAAMAIL.resource@nrc.gov E-mail: lgm1@nrc.gov Administrative Judge Office of the Secretary Paul B. Abramson Attn: Rulemaking and Adjudications Staff Atomic Safety and Licensing Board Panel Mail Stop: O-16G4 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Mail Stop: T-3 F23 Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: Hearing.Docket@nrc.gov E-mail: pba@nrc.gov Administrative Judge Edward Vigluicci, Esq.
Gary S. Arnold Christopher C. Chandler, Esq.
Atomic Safety and Licensing Board Panel Scott A. Vance, Esq.
U.S. Nuclear Regulatory Commission Tennessee Valley Authority Mail Stop: T-3 F23 400 West Summit Hill Drive, WT 6A-K Washington, DC 20555-0001 Knoxville, TN 37902 E-mail: gxa1@nrc.gov E-mail: ejvigluicci@tva.gov ccchandler0@tva.gov savance@tva.gov
Kathryn M. Sutton, Esq. Diane Curran Paul M. Bessette, Esq. for Southern Alliance for Clean Energy Morgan, Lewis & Bockius, LLP (SACE) 1111 Pennsylvania Avenue, NW Harmon, Curran, Spielberg & Eisenberg, LLP Washington, D.C. 20004 1726 M Street N.W., Suite 600 E-mail: ksutton@morganlewis.com Washington, DC 20036 E-mail: pbessette@morganlewis.com E-mail: dcurran@harmoncurran.com
/Signed (electronically) by/
David E. Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov Signed: February 15, 2012