ML13105A400

From kanterella
Jump to navigation Jump to search
NRC Staff Submittal of Supplement 39 to the Hearing File for Watts Bar, OL Proceeding
ML13105A400
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 04/15/2013
From: Roth D
NRC/OGC
To: Abramson P, Gary Arnold, Paul Ryerson
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 24389, 50-391-OL, ASLBP 09-893-01-OL-BD01
Download: ML13105A400 (10)


Text

UNITE D STATE S N UCLEAR REGULATORY C OMMI SS I ON WASHINGTON, DC 20555 - 0001 April 15, 2013 Administrative Judge Administrative Judge Paul S. Ryerson, Chair Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of TENNESSEE VALLEY AUTHORITY (Watts Bar Nuclear Plant Unit 2)

Docket No. 50-391-OL; ASLBP No. 09-893-01-OL-BD01

Dear Administrative Judges:

The NRC Staff hereby submits Supplement 39 to the hearing file for the Watts Bar Nuclear Plant (Unit 2) OL proceeding, Docket No. 50-391-OL.

Pursuant to the agreement of the parties, disclosures and the hearing file may be limited to final non-privileged documents relevant to the admitted contentions. Further, historical versions of the application need not be listed and privilege logs are waived.

This supplement to the hearing file includes materials required pursuant to 10 C.F.R. § 2.1203, as well as the Staffs mandatory disclosures produced pursuant to 10 C.F.R. § 2.336, as modified by the agreement. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS). An index containing the ADAMS accession number, date, and title or description of public each item in the hearing file is appended hereto as Attachment 1. An index of items which are non-public due to proprietary or security information is appended hereto as Attachment 2.

The Staff has taken a broad approach in identifying potentially-relevant documents for inclusion in the disclosures and hearing file. Additional public documents associated with the application, but not relevant to the admitted contention, are readily accessible in ADAMS. In addition,

pursuant to the agreement of the parties, the Staff will continue to work with both parties to provide access to documents.

On or around April 15, 2013, the supplement to the hearing file will be made available via the Electronic Hearing Docket (EHD), which may be accessed at the following URL:

http://adams.nrc.gov/ehd/. The hearing file will be contained in a sub-folder entitled, Watts Bar Hearing File" of the Watts_Bar_50-391-OL" folder of the EHD.

Further, attached is the affidavit of Justin C. Poole certifying that all relevant materials required under the agreement of the parties by this section have been disclosed, and that the disclosures are accurate and complete for documents identified as of April 9, 2013.

Sincerely,

/Signed (electronically) by/

David Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov Signed: April 15, 2013

Enclosures:

Attachment 1 - Public Hearing File Index Attachment 2 - Non-Public Hearing File Index Affidavit of Justin C. Poole

ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - April 15, 2013 Accession Document ID# Title Number Date 04/16/2013 Meeting Announcement - Public Meeting to Discuss the Annual 39-001 ML13087A344 3/28/2013 Assessment of the Watts Bar Nuclear Unit 2 Construction Project with the Public.

2013/01/24 Watts Bar 2 OL - TVA letter to NRC_Liability Insurance Coverage 39-002 ML13072A229 1/24/2013 Requested SSER Open Item 25 2013/01/31 Watts Bar 2 OL - TVA letter to NRC_01-31-2013_Commerical Grade 39-003 ML13072A210 1/31/2013 Dedication Program 39-004 ML13072A220 2/4/2013 2013/02/04 Watts Bar 2 OL - 2012-02 WBN Project Plan - Unit 2.pdf 39-005 ML13072A243 2/7/2013 2013/02/07 Watts Bar 2 OL - 2012-02 WBN Project Plan - Unit 2.pdf 2013/02/08 Watts Bar 2 OL - FW: Fire Protection Questions from January 31, 2013 39-006 ML13072A235 2/8/2013 Meeting 39-007 2013/02/08 Watts Bar 2 OL - RE: Fire Protection Questions from January 31, 2013 ML13072A248 2/8/2013 Meeting 39-008 ML13072A251 2/11/2013 2013/02/11 Watts Bar 2 OL - 2012-02 WBN Project Plan - Unit 2.pdf 39-009 ML13072A253 2/13/2013 2013/02/13 Watts Bar 2 OL - FW: WBN 2 technical issue: sprinkler obstruction 39-010 2013/02/14 Watts Bar 2 OL - TVA letter to NRC_02-13-13_2-PTI-015-01, 2-PTI-068-04 ML13072A262 2/14/2013

& 2-PTI-072-01 transmittal to NRC 39-011 ML13072A267 2/21/2013 2013/02/21 Watts Bar 2 OL - 2012-02 WBN Project Plan - Unit 2.pdf 39-012 ML13072A276 2/25/2013 2013/02/25 Watts Bar 2 OL - 2012-02 WBN Project Plan - Unit 2.pdf 39-013 ML13072A548 2/27/2013 2013/02/27 Watts Bar 2 OL - Documents needed for FES39-014 ML13063A460 3/4/2013 Annual Assessment Letter for Watts Bar Nuclear Plant Unit 2 (IR 05000390-13-601).

Watts Bar, Unit 2 - Supplemental Condenser Cooling Water Thermal Mixing Reports Enclosure 1, Summer 2010 Compliance Survey for Watts Bar Nuclear Plant Outfall 39-015 ML13080A366 3/18/2013 Passive Mixing Zone.

Enclosure 2, Winter 2010 Compliance Survey for Watts Bar Nuclear Plant Outfall Passive Mixing Zone 1

ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - April 15, 2013 Accession Document ID# Title Number Date Watts Bar, Unit 2 - Supplemental Condenser Cooling Water Thermal Mixing Reports Enclosure 3, Summer 2011 Compliance Survey for Watts Bar Nuclear Plant Outfall Passive Mixing Zone.

Enclosure 4, Winter 2011 Compliance Survey for Watts Bar Nuclear Plant Outfall 39-016 ML13080A363 3/18/2013 Passive Mixing Zone Enclosure 5, Summer 2012 Compliance Survey for Watts Bar Nuclear Plant Outfall Passive Mixing Zone Enclosure 6, Winter 2012 Compliance Survey for Watts Bar Nuclear Plant Outfall Passive Mixing Zone 39-017 ML13091A388 3/28/2013 Interim Part 21 Report Involving Review of Seismic Testing Methodology.39-018 IR 05000391-13-611, on 12/3/2012 and 12/07/2012, 01/10/2013, 02/14/2013, Watts ML13085A258 3/26/2013 Bar Nuclear plant, Unit 2, Construction - NRC Focused Problem Identification and Resolution Inspection.39-019 IR 05000391-13-612, 01/01/2013 - 02/16/2013, Watts Bar Nuclear Plant, Unit 2, ML13088A066 3/28/2013 Construction - NRC Integrated Inspection.39-020 Notice to the U.S. Nuclear Regulatory Commission of a Possible Deviation or Defect in ML13094A177 3/18/2013 Nuclear Qualified High Efficiency Particulate Air Filters Manufactured by AAF.

Notification of Potential Part 21 Interim Report re Possible Deviation or Defect in 39-021 ML13079A320 3/18/2013 Nuclear Qualified High Efficiency Particulate Air Filters.

Public Meeting Notice Tennessee Valley Authority, Browns Ferry, Sequoyah, Watts Bar 39-022 ML13078A421 3/19/2013 for Commercial Grade Dedication Program.

Revised Watts Bar Nuclear Plant Unit 1/Unit 2 As-Designed Fire Protection Report.39-023 ML13081A002 3/13/2013 Part 1 of 2.

Revised Watts Bar Nuclear Plant Unit 1/Unit 2 As-Designed Fire Protection Report.39-024 ML13081A003 3/13/2013 Part 2 of 2.

2

ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - April 15, 2013 Accession Document ID# Title Number Date Sequoyah, Unit 1 & 2, Watts Bar, Unit 1 & 2, Extension Request Regarding the Flooding 39-025 ML13080A073 3/12/2013 Hazard Reevaluation Report Required by NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation....

Watts Bar Nuclear Experience Review (NER), NER 950161, "IE Notice 95-005, Under 39-026 ML13092A334 4/27/1995 Voltage Protection Relay Settings Out of Tolerance Due to Test Equipment Harmonics 2", dated April 27, 1995.39-027 Watts Bar Nuclear Plant Physical Security Plan, Training and Qualification Plan, ML13087A581 3/13/2013 Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 14.39-028 Watts Bar Nuclear Plant Unit 2, Transmittal of Revised Unit 1/Unit 2 As-Designed Fire ML13081A004 3/13/2013 Protection Report (TAC No. ME3091).39-029 Watts Bar Nuclear Plant, Unit 2, Request for Additional Information Regarding ML13037A265 3/13/2013 Technical Specifications Instrumentation and Controls Branch (TAC NO. ME7713).39-030 Watts Bar Nuclear Plant, Unit 2, Response to Request for Additional Information ML13080A269 3/18/2013 Regarding Final Safety Analysis Report Amendment Related Section 3.11 - Revised (TAC No. ME2731).39-031 ML13071A324 3/6/2013 Watts Bar Nuclear Plant, Unit 2, Submittal of Pre-op Test Instruction.

Watts Bar Nuclear Plant, Unit 2, Submittal of Pre-op Test Instructions for Condenser 39-032 ML13091A037 3/26/2013 Vacuum and Flood Mode Boration.

Watts Bar Nuclear Plant, Unit 2, Transition From American Society of Mechanical 39-033 ML13073A029 3/12/2013 Engineers (ASME) Boiler and Pressure Vessel Code Section III Division I to Section XI-Modification of Two Previous Statements.

Watts Bar, Unit 2 - Response to Request for Additional Information Regarding 39-034 ML13085A219 3/21/2013 Technical Specifications Changes - Instrumentation and Controls Branch.

3

ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - April 15, 2013 Accession Document ID# Title Number Date Watts Bar, Unit 2 - Supplemental Condenser Cooling Water Thermal Mixing Reports39-035 ML13080A365 3/18/2013 Cover Letter 4

ATTACHMENT 2 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES PROTECTED FILE INDEX Supplemental Disclosures - April 15, 2013 Accession Document ID # Protected Reason Title Number Date Attachment 3, Conceptual Sketches, Reactor Core Cooling and Heat 39-P001 ML13067A031 2/28/2013 Fire Protection Removal (Steam Generator Available) Strategies.

Watts Bar, Unit 1 & 2, Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to 39-P002 ML13067A030 2/28/2013 Fire Protection Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049).

Watts Bar, Unit 2 - Fire Protection Report - Response to Request for 39-P003 ML13066A170 2/28/2013 Fire Protection Additional Information.

April 15, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL

)

(Watts Bar Nuclear Plant, Unit 2) )

AFFIDAVIT OF JUSTIN C. POOLE CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Justin C. Poole, do hereby state as follows:

1. I am employed as Senior Project Manager, Plant Licensing Branch LPL II-2, in the Division of Operator Reactor Licensing in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. My responsibilities include oversight of the NRC Staffs review and evaluation of the Watts Bar Nuclear Plant, Unit 2 operating license application (OLA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the OLA at issue in this proceeding.
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 and 2.1203, as modified by the parties agreement of December 1, 2009, have been disclosed, and that the disclosures are accurate and complete for documents identified as of April 9, 2013.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

/Executed in Accord with 10 CFR 2.304(d)/

Justin C. Poole Senior Project Manager, NRR/DORL/LPL II-2 U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: (301)415-2048 E-mail: Justin.Poole@nrc.gov Date Signed: April 15, 2013

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL

)

(Watts Bar Nuclear Plant, Unit 2) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (revised), I hereby certify that copies of the foregoing NRC STAFF'S SUPPLEMENTAL DISCLOSURE 39, INCLUDING PUBLIC HEARING FILE INDEX, PROTECTED HEARING FILE INDEX, AND AFFIDAVIT OF JUSTIN C. POOLE dated April 15, 2013, have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 15th day of April, 2013:

/Signed (electronically) by/

David E. Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov Signed: April 15, 2013