UNITE D STATE S N UCLEAR REGULATORY C OMMI SS I ON WASHINGTON, DC 20555 - 0001 June 15, 2011 Administrative Judge Administrative Judge Lawrence G. McDade, Chair Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of TENNESSEE VALLEY AUTHORITY (Watts Bar Nuclear Plant Unit 2)
Docket No. 50-391-OL; ASLBP No. 09-893-01-OL-BD01
Dear Administrative Judges:
The NRC Staff hereby submits Supplement 16 to the hearing file for the Watts Bar Nuclear Plant (Unit 2) OL proceeding, Docket No. 50-391-OL.
Pursuant to the agreement of the parties, disclosures and the hearing file may be limited to final non-privileged documents relevant to the admitted contentions. Further, historical versions of the application need not be listed and privilege logs are waived.
This supplement to the hearing file includes materials required pursuant to 10 C.F.R. § 2.1203, as well as the Staffs mandatory disclosures produced pursuant to 10 C.F.R. § 2.336, as modified by the agreement. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. An index of documents protected due to proprietary or security concerns is appended as Attachment 2.
The Staff has taken a broad approach in identifying potentially-relevant documents for inclusion in the disclosures and hearing file. Additional public documents associated with the application, but not relevant to the admitted contention, are readily accessible in ADAMS. In addition,
L. McDade June 15, 2011 P. Abramson G. Arnold pursuant to the agreement of the parties, the Staff will continue to work with both parties to provide access to documents On or around June 15, 2011, the supplement to the hearing file will be made available via the Electronic Hearing Docket (EHD), which may be accessed at the following URL:
http://ehd.nrc.gov/EHD_Proceeding/home.asp. The hearing file will be contained in a sub-folder entitled, Watts Bar Hearing File" of the Watts_Bar_50-391-OL" folder of the EHD.
Further, attached is the affidavit of Justin C. Poole certifying that all relevant materials required under the agreement of the parties by this section have been disclosed, and that the disclosures are accurate and complete for documents identified as of June 15, 2011.
Sincerely,
/Signed (electronically) by/
David E. Roth Counsel for NRC Staff
Enclosures:
Attachment 1 - Hearing File Index Attachment 2 - Protected Index Affidavit of Justin C. Poole cc: Service List
ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - June 15, 2011 Accession Document Title ID#
Number Date Watts Bar Nuclear Plant, Unit 2 - Request for Additional Information Regarding Final 17-0001 ML111240483 05/23/2011 Safety Analysis Report Related to Section 9.5.1 Fire Protection Round 4.
Watts Bar, Unit 2 - Cyber-Security Program Implementation Schedule (TAC No.
17-0002 ML111250415 05/20/2011 ME4958).
Watts Bar, Unit 2 - Response to Request for Additional Information (RAI) Regarding 17-0003 ML11131A124 05/09/2011 Mitigation Strategy Assessments and Closure Process for Phases 1, 2, and 3 -
Revised Response for RAI 2.
05/26/2011 Notice of Meeting with Tennessee Valley Authority to Discuss Watts Bar 17-0004 ML111360026 05/16/2011 Nuclear Plant, Unit 2, Final Safety Analysis Report Regarding Section 7 Instrumentation and Control.
17-0005 ML111370681 05/13/2011 IR 05000391-11-606, on 02/14/2011 - 03/04/2011, Watts Bar Nuclear Plant, Unit 2.
IR 05000391-11-603; 04/02/2011; on February 20 - April 2, 2011, Watts Nuclear 17-0006 ML111370702 05/16/2011 Plant, Unit 2; Construction-NRC Integrated.
Watts Bar, Unit 2 - Additional Responses to Request for Additional Information 17-0007 ML11138A093 05/13/2011 Regarding (1) Large Break Loss of Coolant Accident, (2) Steam Line Break, and (3)
Miscellaneous Analysis.
06/02/2011 Notice of Meeting with Tennessee Valley Authority to Discuss Watts Bar 17-0008 ML111400289 05/23/2011 Nuclear Plant, Unit 2, Final Safety Analysis Report Related to Section 7 Instrumentation and Control.
Watts Bar, Unit 2, Response to Request for Additional Information on Intake 17-0009 ML11143A083 05/19/2011 Pumping Station Water Velocity.
Watts Bar, Unit 2, Response To Request For Additional Information Regarding 17-0010 ML11145A088 05/13/2011 Severe Accident Management Design Alternative Review.
Watts Bar, Unit 2 - Submittal of Pre-op Test Instruction, 2-PTI-065-02, Rev. 0, 17-0011 ML11145A123 05/24/2011 "Emergency Gas Treatment System Pressure Test."
Watts Bar, Unit 2 - Instrumentation and Controls (I&C) Staff Information Requests -
17-0012 ML11145A126 05/20/2011 Presentation Package for Public Meeting Held on May 12, 2011.
Watts Bar, Unit 2, Responses to Request for Additional Information Regarding (1) 17-0013 ML11145A162 05/24/2011 Bottom Mounted Instrument (BMI) Tube Failure and (2) Mass Addition Events.
Watts Bar, Revised Response to Request for Additional Information Question 3 17-0014 ML11145A163 05/20/2011 Regarding Final Safety Analysis Report Section 2.4.
ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - June 15, 2011 Accession Document Title ID#
Number Date Watts Bar, Unit 2, Response to Final Safety Analysis Report, Chapter 11 and Final 17-0015 ML11146A044 05/20/2011 Supplemental Environmental Impact Statement Request for Additional Information.
Watts Bar, Unit 2, Response to Request for Additional Information Item Numbers 2, 17-0016 ML11147A099 05/25/2011 3, 5 and 15 Regarding Severe Accident Management Design Alterative Review (TAC MD8203).
Watts Bar Nuclear Plant, Unit 2 - Request for Additional Information Regarding Final 17-0017 ML111510979 06/08/2011 Safety Analysis Report Related to Section 9.5.1 Fire Protection Round 5.
Watts Bar, Unit 2, Response to Request for Information from Public Meeting on May 17-0018 ML11152A160 05/26/2011 11, 2011.
17-0019 ML111540134 06/02/2011 06/20/11 Notice of Meeting with Tennessee Valley Authority.
06/16/2011 Notice of Meeting with Tennessee Valley Authority to Discuss Watts Bar 17-0020 ML111540518 06/06/2011 Nuclear Plant, Unit 2, Final Safety Analysis Report Related to Section 7 Instrumentation and Control.
Watts Bar, Unit 2, Information Presented in the May 11-12, 2011 TVA/NRC Meeting 17-0021 ML11154A139 06/01/2011 Regarding Final Safety Analysis Report Section 2.4.
Enclosure 1, 05/11/2011 Presentation Package "Temporary Dams' Modification 17-0022 ML11154A140 06/01/2011 Project."
Enclosure 3, Calculation RSOGENROGCDX00033320110002, "Seismic Evaluation 17-0023 ML11154A141 04/14/2011 of HESCO Baskets."
Watts Bar Nuclear Plant (WBN), Unit 2 - Final Safety Analysis Report (FSAR) -
17-0024 ML111570312 06/06/2011 Response to Request for Additional Information (RAI) Regarding Accident Dose Analysis Basis.
Enclosure 2, Calculation RSOFLHROGCDX00033320090003, "PMF Temporary 17-0025 ML11157A042 11/02/2009 Modification Analysis."
17-0026 ML111590882 06/08/2011 IR 05000390-11-403 & 05000391-11-403, on 05/27/11, Watts Bar Nuclear Plant.
Watts Bar Nuclear Plant, Unit 2 Safety Evaluation Report Supplement 22 (SSER 22) 17-0027 ML11161A128 06/07/2011
- Second Response to NRC Required Action Items.
17-0028 ML11164A140 06/09/2011 Watts Bar, Unit 2, Submittal of Pre-op Test Instruction.
Watts Bar Nuclear Plant (WBN) Unit 2 - Reply to Notice of Violation 17-0029 ML11164A141 06/09/2011 0500039/112010603 Failure to Adequately Evaluate and Qualify Molded Case Circuit Breakers - Revised Response.
ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - June 15, 2011 Accession Document Title ID#
Number Date 17-0030 ML11165A099 06/08/2011 2011/06/08 Watts Bar 2 OL - expanded HH table 17-0031 ML11165A100 06/08/2011 2011/06/08 Watts Bar 2 OL - FW: Bucket List 6/9/11 17-0032 ML11165A101 06/07/2011 2011/06/07 Watts Bar 2 OL - FW: NRC Bucket List 6/9/11 17-0033 ML11165A103 06/06/2011 2011/06/06 Watts Bar 2 OL - Additional need for clarification on Chapter 11/EIS 2011/06/06 Watts Bar 2 OL - FW: 20110526 Open Item List Master TVA Update 06-17-0034 ML11165A104 06/06/2011 6-11.docx 17-0035 ML11165A105 06/06/2011 2011/06/06 Watts Bar 2 OL -Request for GALE input parameters 17-0036 ML11165A106 06/01/2011 2011/06/01 Watts Bar 2 OL - discussion topics for clarification call 17-0037 ML11165A107 05/31/2011 2011/05/31 Watts Bar 2 OL - NRC I&C RAI metrics 17-0038 ML11165A108 05/31/2011 2011/05/31 Watts Bar 2 OL - FW: Bucket List 6/2/11 17-0039 ML11165A109 05/26/2011 2011/05/26 Watts Bar 2 OL - FW: Updated OI List 2011/05/23 Watts Bar 2 OL - FW: 20110506 Open Item List Master TVA Update 05-17-0040 ML11165A110 05/23/2011 23-11.docx 17-0041 ML11165A141 05/23/2011 2011/05/23 Watts Bar 2 OL - FW: NRC Bucket List and SSER 22/23 for 5/26/11 17-0042 ML11165A145 05/18/2011 2011/05/18 Watts Bar 2 OL - Commitments and SSER Open Items 17-0043 ML11165A146 05/18/2011 2011/05/18 Watts Bar 2 OL - Bucket List 5/19/11 17-0044 ML11165A147 05/12/2011 2011/05/12 Watts Bar 2 OL - FW: Text of additional question from today's meeting 2011/05/11 Watts Bar 2 OL - Request for Information from Public Meeting on 17-0045 ML11165A148 05/11/2011 5/11/11 Watts Bar, Unit 2 - Cyber Security Implementation Schedule Including Systems 17-0046 ML11165A217 06/10/2011 Common to WBN, Unit 1.
2011/05/10 Watts Bar 2 OL - TVA letter to NRC_2011-05-09_10 CFR 50-54 (hh)(2) 17-0047 ML11166A104 05/10/2011 Commitments_Revised RAI 2 Response 2011/05/16 Watts Bar 2 OL - TVA lettter to NRC_2011-05 SAMDA RAI 17-0048 ML11166A106 05/16/2011
Response
17-0049 ML11166A107 05/19/2011 2011/05/19 Watts Bar 2 OL - TVA letter to NRC_05-19-11_ IPS Flow Response 2011/05/23 Watts Bar 2 OL - FW: TVA letter to NRC_05-20-11_Revised RAI 17-0050 ML11166A149 05/23/2011 Response_Question 3 _FSAR 2.4 17-0051 ML11166A154 05/23/2011 2011/05/23 Watts Bar 2 OL - Chapter 11 FSAR RAI Response
ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - June 15, 2011 Accession Document Title ID#
Number Date 2011/05/24 Watts Bar 2 OL - FW: TVA letter to NRC_05-24-11_BMI & Mass 17-0052 ML11166A155 05/24/2011 Addition Events RAI Response 2011/05/24 Watts Bar 2 OL - TVA letter to NRC_05-24-11_2-PTI-065-02 transmittal 17-0053 ML11166A157 05/24/2011 to NRC 2011/05/25 Watts Bar 2 OL - TVA letter to NRC_05-25-11_WBN U2 SAMDA 17-0054 ML11166A173 05/25/2011 Remaining RAI Responses
ATTACHMENT 2 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES PROTECTED FILE INDEX Supplemental Disclosures - June 15, 2011 Accession Document ID# Protected Reason Title Number Date Watts Bar Nuclear Plant, Unit 2, Enclosure 1, Response 17-P001 ML11131A125 05/09/2011 Security Related to Request for Additional Information Regarding Mitigation Strategies - Revised Response for RAI 2.
Additional Responses to Request for Additional 17-P002 ML11138A094 05/13/2011 Proprietary Information Regarding (1) LBLOCA, (2) Steam Line Break (SLB), and (3) Miscellaneous Analysis.
Watts Bar, Unit 2, Instrumentation and Controls Presentation Package For May 12, 2011 NRC Public 17-P003 ML11145A127 05/20/2011 Proprietary Meeting Titled: "WINCISE System - Design Scope" (Proprietary).
Watts Bar, Unit 2, Response to Request for Additional 17-P004 ML111520119 05/26/2011 Fire Protection Information Regarding "Fire Protection Report."
Watts Bar Nuclear Plant, Units 1 & 2, Emergency Plan Implementing Procedure Revision, EPIP 1, Revision 35, 17-P005 ML11152A166 05/27/2011 Security Related 05/06/2011, In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V.
IR 05000390-11-403 & 05000391-11-403, on 02/14-17-P006 ML111590872 06/08/2011 Security Related 18/2011- 05/23-27/2011, Watts Bar Nuclear Plant, Units 1 and 2, NRC Security Inspection Report.
Watts Bar, Unit 2, Response to NRC Round 4b Request 17-P007 ML11161A127 06/07/2011 Fire Protection for Additional Information (RAI) Regarding "Fire Protection Report." (TAC No. ME3091).
Watts Bar, Unit 2 - Cyber Security Implementation 17-P008 ML11165A218 06/10/2011 Security Related Schedule Including Systems Common to WBN, Unit 1, Enclosures 1 - 4.
2011/05/16 Watts Bar 2 OL 13-11_WB2 Mirando 17-P009 ML11166A100 05/16/2011 Proprietary Audit RAI Response 2011/05/19 Watts Bar 2 OL - FW: TVA letter to NRC_5-17-P010 ML11166A102 05/19/2011 Fire Protection 18-11_RAI Response Fire Protection Report
ATTACHMENT 2 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES PROTECTED FILE INDEX Supplemental Disclosures - June 15, 2011 Accession Document ID# Protected Reason Title Number Date 2011/05/23 Watts Bar 2 OL - FW: TVA letter to NRC_05-17-P011 ML11166A138 05/23/2011 Proprietary 20-11_I&C Staff Requests_Presentation Pkg for Public Meeting on 2011MAY12 2011/05/31 Watts Bar 2 OL 26-11_RAI re Fire 17-P012 ML11166A140 05/31/2011 Fire Protection Protection Report ltr to NRC 2011/06/08 Watts Bar 2 OL - TVA letter to NRC_6 17-P013 ML11166A146 06/08/2011 Fire Protection 11_Response to NRC Round 4b FPR RAIs
June 15, 2011 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of TENNESSEE VALLEY AUTHORITY Docket No. 50-391-0L (Watts Bar Nuclear Plant, Unit 2)
AFFIDAVIT OF JUSTIN C. POOLE CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
I, Justin C. Poole, do hereby state as follows:
- 1. I am employed as Project Manager, Watts Bar Special Projects Branch, in the Division of Operator Reactor Licensing in the U.S. Nuclear Regulatory Commission's ("NRC")
Office of Nuclear Reactor Regulation. My responsibilities include oversight of the NRC Staff's review and evaluation of the Watts Bar Nuclear Plant, Unit 2 operating license application
("OLA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the OLA at issue in this proceeding.
- 2. I hereby certify that all relevant materials required to be disclosed pursuant to 10C.F.R. §§ 2.336 and 2.1203, as modified by the parties' agreement of December 1, 2009, have been disclosed, and that the disclosures are accurate and complete for documents identified as of June 15, 2011.
-2
- 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
~ Justin C. Poole Executed in Rockville, Maryland this 15th day of June, 2011
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL
)
(Watts Bar Nuclear Plant, Unit 2) )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing NRC STAFF'S SUPPLEMENTAL DISCLOSURE, INCLUDING HEARING FILE INDEX, PROTECTED INDEX, AND AFFIDAVIT OF JUSTIN C.
POOLE, dated June 15, 2011, have been served upon the following by the Electronic Information Exchange, this 15th day of June, 2011:
Administrative Judge Office of Commission Appellate Lawrence G. McDade, Chair Adjudication Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Mail Stop: O-16G4 Mail Stop: T-3 F23 Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: OCAAMAIL.resource@nrc.gov E-mail: lgm1@nrc.gov Administrative Judge Office of the Secretary Paul B. Abramson Attn: Rulemaking and Adjudications Staff Atomic Safety and Licensing Board Panel Mail Stop: O-16G4 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Mail Stop: T-3 F23 Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: Hearing.Docket@nrc.gov E-mail: pba@nrc.gov Administrative Judge Edward Vigluicci, Esq.
Gary S. Arnold Christopher C. Chandler, Esq.
Atomic Safety and Licensing Board Panel Scott A. Vance, Esq.
U.S. Nuclear Regulatory Commission Tennessee Valley Authority Mail Stop: T-3 F23 400 West Summit Hill Drive, WT 6A-K Washington, DC 20555-0001 Knoxville, TN 37902 E-mail: gxa1@nrc.gov E-mail: ejvigluicci@tva.gov ccchandler0@tva.gov savance@tva.gov
Kathryn M. Sutton, Esq. Diane Curran Paul M. Bessette, Esq. for Southern Alliance for Clean Energy Morgan, Lewis & Bockius, LLP (SACE) 1111 Pennsylvania Avenue, NW Harmon, Curran, Spielberg & Eisenberg, LLP Washington, D.C. 20004 1726 M Street N.W., Suite 600 E-mail: ksutton@morganlewis.com Washington, DC 20036 E-mail: pbessette@morganlewis.com E-mail: dcurran@harmoncurran.com
/Signed (electronically) by/
David E. Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov Signed: June 15, 2011