NRC Watts Bar 2 Discovery Update 41 June 2013, in the Matter of Tennessee Valley Authority (Watts Bar Nuclear Plant Unit 2)
ML13165A391
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 06/14/2013
From: Roth D
NRC/OGC
To: Abramson P, Gary Arnold, Paul Ryerson
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 24690, 50-391-OL, ASLBP 09-893-01-OL-BD01
Download: ML13165A391 (7)


Text

UNITE D STATE S N UCLEAR REGULATORY C OMMI SS I ON WASHINGTON, DC 20555 - 0001 June 14, 2013 Administrative Judge Administrative Judge Paul S. Ryerson, Chair Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of TENNESSEE VALLEY AUTHORITY (Watts Bar Nuclear Plant Unit 2)

Docket No. 50-391-OL; ASLBP No. 09-893-01-OL-BD01

Dear Administrative Judges:

The NRC Staff hereby submits Supplement 41 to the hearing file for the Watts Bar Nuclear Plant (Unit 2) OL proceeding, Docket No. 50-391-OL.

Pursuant to the agreement of the parties, disclosures and the hearing file may be limited to final non-privileged documents relevant to the admitted contentions. Further, historical versions of the application need not be listed and privilege logs are waived.

This supplement to the hearing file includes materials required pursuant to 10 C.F.R. § 2.1203, as well as the Staffs mandatory disclosures produced pursuant to 10 C.F.R. § 2.336, as modified by the agreement. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS). An index containing the ADAMS accession number, date, and title or description of public each item in the hearing file is appended hereto as Attachment 1.

The Staff has taken a broad approach in identifying potentially-relevant documents for inclusion in the disclosures and hearing file. Additional public documents associated with the application, but not relevant to the admitted contention, are readily accessible in ADAMS. In addition, pursuant to the agreement of the parties, the Staff will continue to work with both parties to provide access to documents.

On or around June 17, 2013, the supplement to the hearing file will be made available via the Electronic Hearing Docket (EHD), which may be accessed at the following URL:

http://adams.nrc.gov/ehd/. The hearing file will be contained in a sub-folder entitled, Watts Bar Hearing File" of the Watts_Bar_50-391-OL" folder of the EHD.

Further, attached is the affidavit of Justin C. Poole certifying that all relevant materials required under the agreement of the parties by this section have been disclosed, and that the disclosures are accurate and complete for documents identified as of June 14, 2013.

Sincerely,

/Signed (electronically) by/

David Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov Signed: June 14, 2013

Enclosures:

Attachment 1 - Public Hearing File Index Affidavit of Justin C. Poole

ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - June 14, 2013 Accession ID# Document Date Title Number 06/11/2013 Notice of Meeting with Tennessee Valley Authority Regarding Status of 41-001 ML13149A122 5/30/2013 Construction and Licensing of Watts Bar Nuclear Plant, Unit 2.41-002 ML13134A350 4/1/2013 2013/04/01 Watts Bar 2 OL - 2013-04 WBN Project Plan - Unit 2.pdf 41-003 ML13134A341 4/11/2013 2013/04/11 Watts Bar 2 OL - 2012-04 WBN Project Plan - Unit 2.pdf 41-004 ML13134A338 4/15/2013 2013/04/15 Watts Bar 2 OL - 2012-04 WBN Project Plan - Unit 2.pdf 41-005 ML13134A333 4/18/2013 2013/04/18 Watts Bar 2 OL - 2012-04 WBN Project Plan - Unit 2.pdf 41-006 ML13134A337 4/22/2013 2013/04/22 Watts Bar 2 OL - 2012-04 WBN Project Plan - Unit 2.pdf 41-007 ML13134A332 4/25/2013 2013/04/25 Watts Bar 2 OL - 2012-04 WBN Project Plan - Unit 2.pdf 2013/04/29 Watts Bar 2 OL - TVA - WBN U1 and U2 Day Report and Annual Report 41-008 ML13134A331 4/29/2013 for 2012 Integrated Inspection Included Aspects of Engineering and Construction Activities41-009 Performed by TVA Associated with the Watts Bar Nuclear (WBN) Plant Unit 2 ML13134A239 5/10/2013 Construction Project.

NUREG-0498 Supp 2 Vol 1 "Final Environmental Statement Related to the Operation of 41-010 ML13144A092 5/31/2013 Watts Bar Nuclear Plant, Unit 2" (Final Report).

NUREG-0498 Supp 2 Vol 2 "Final Environmental Statement Related to the Operation of 41-011 ML13144A093 5/30/2013 Watts Bar Nuclear Plant, Unit 2" (Final Report).

Press Release-13-049: NRC Issues Final Environmental Impact Statement For Watts Bar 41-012 ML13161A370 6/7/2013 Unit 2 Operating License.

Revised Commitments for Extension Request Re Flooding Hazard Reevaluation Report Required by NRC Request for Information Pursuant to 10 CFR 50.54(f) Re 41-013 Recommendation 2.1, Flooding, of Near-Term Task Force Review of Insights from ML13133A004 5/9/2013 Fukushima Dai-ichi....

Watts Bar Nuclear Plant Unit 2 Construction - NRC Problem Identification and 41-014 ML13158A115 6/7/2013 Resolution Inspection Report 05000391-13-613.

Watts Bar Nuclear Plant, Unit 2 - Notice of Availability of of Supplement 2 to Final 41-015 ML13150A379 6/6/2013 Environmental Statement for Operation (TAC No. MD8203).

Watts Bar Nuclear Plant, Unit 2 - Notice of Availability of Supplement 2 to the Final 41-016 ML13151A292 6/6/2013 Environmental Statement.

1

ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - June 14, 2013 Accession ID# Document Date Title Number Watts Bar Nuclear Plant, Unit 2 - Notice of Availability of Supplement 2 to the Final 41-017 ML13151A278 6/7/2013 Environmental Statement.

Watts Bar Nuclear Plant, Unit 2 - Notice of Availability of the Final Environmental 41-018 Statement Related to the Operation of Watts Bar Nuclear Plant, Unit 2, Supplement 2, ML13158A098 6/7/2013 Final Report.

Watts Bar Nuclear, Unit 2, Final Environmental Statement, Supplement 2, (TAC 41-019 ML13130A031 5/10/2013 MD8203).

Watts Bar, Unit 1 & 2, Status Update of Completion Schedule for Phase 2 Staffing 41-020 Assessment Regarding 60-Day Response to 3/12/12, Request for Information Pursuant ML13162A303 6/6/2013 to Title 10 of Code of Federal Regulations 50.54(f) Regarding Recommendations...

Watts Bar, Unit 2 - Construction Deficiency Report 50-391/2013 Commercial Grade 41-021 ML13129A176 5/6/2013 Dedication Program - Second Interim Report.

Watts Bar, Unit 2 - Submittal of Pre-op Test Instructions, Rev. 0, 2-PTI-070-02A,41-022 "Component Cooling System, Unit 2 Train A Flow Balance", Rev. 0, 2-PTI-070-02B, ML13127A214 5/2/2013 "Component Cooling System, Train B Flow Balance".41-023 ML13148A010 5/20/2013 Watts Bar, Unit 2 - Submittal of Pre-op Test Instructions.

Watts Bar, Unit 2, Preoperational Test, 2-PTI-068-03, Rev. 0, "Pressurizer Heater and 41-024 ML13148A011 6/12/2012 Spray Control."

Watts Bar, Unit 2, Preoperational Test, 2-PTI-068-07, Rev. 0, "Reactor Coolant Pump 41-025 ML13148A012 12/19/2012 Motor Logic Test."

Watts Bar, Unit 2, Preoperational Test, 2-PTI-068-09, Rev. 0, "Reactor Vessel Head Vent 41-026 ML13148A013 12/13/2012 System."

Watts Bar, Unit 2, Preoperational Test, 2-PTI-068-13, Rev. 1, "Shutdown from Outside 41-027 ML13148A014 4/4/2013 the Main Control Room."

Watts Bar, Unit 2, Service Air System (System 033) Transition from ASME Section III to 41-028 ML13127A216 5/2/2013 ASME Section XI.

2

June 14, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL

)

(Watts Bar Nuclear Plant, Unit 2) )

AFFIDAVIT OF JUSTIN C. POOLE CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Justin C. Poole, do hereby state as follows:

1. I am employed as Senior Project Manager, Plant Licensing Branch LPL II-2, in the Division of Operator Reactor Licensing in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. My responsibilities include oversight of the NRC Staffs review and evaluation of the Watts Bar Nuclear Plant, Unit 2 operating license application (OLA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the OLA at issue in this proceeding.
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 and 2.1203, as modified by the parties agreement of December 1, 2009, have been disclosed, and that the disclosures are accurate and complete for documents identified as of June 13, 2013.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

/Executed in Accord with 10 CFR 2.304(d)/

Justin C. Poole Senior Project Manager, NRR/DORL/LPL II-2 U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: (301)415-2048 E-mail: Justin.Poole@nrc.gov Date Signed: June 14, 2013

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL

)

(Watts Bar Nuclear Plant, Unit 2) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R.§ 2.305 (revised), I hereby certify that copies of the foregoing NRC STAFF'S SUPPLEMENTAL DISCLOSURE 41, INCLUDING PUBLIC HEARING FILE INDEX, AND AFFIDAVIT OF JUSTIN C. POOLE dated June 14, 2013, have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 14th day of June, 2013:

/Signed (electronically) by/

David E. Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov Signed: June 14, 2013