NRC Staff Hearing File Update 37 Feb 2013
ML13046A165
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/15/2013
From: Roth D
NRC/OGC
To: Abramson P, Gary Arnold, Paul Ryerson
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 24132, 50-391-OL, ASLBP 09-893-01-OL-BD01
Download: ML13046A165 (6)


Text

UNITE D STATE S N UCLEAR REGULATORY C OMMI SS I ON WASHINGTON, DC 20555 - 0001 February 15, 2013 Administrative Judge Administrative Judge Paul S. Ryerson, Chair Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of TENNESSEE VALLEY AUTHORITY (Watts Bar Nuclear Plant Unit 2)

Docket No. 50-391-OL; ASLBP No. 09-893-01-OL-BD01

Dear Administrative Judges:

The NRC Staff hereby submits Supplement 37 to the hearing file for the Watts Bar Nuclear Plant (Unit 2) OL proceeding, Docket No. 50-391-OL.

Pursuant to the agreement of the parties, disclosures and the hearing file may be limited to final non-privileged documents relevant to the admitted contentions. Further, historical versions of the application need not be listed and privilege logs are waived.

This supplement to the hearing file includes materials required pursuant to 10 C.F.R. § 2.1203, as well as the Staffs mandatory disclosures produced pursuant to 10 C.F.R. § 2.336, as modified by the agreement. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS). An index containing the ADAMS accession number, date, and title or description of public each item in the hearing file is appended hereto as Attachment 1.

The Staff has taken a broad approach in identifying potentially-relevant documents for inclusion in the disclosures and hearing file. Additional public documents associated with the application, but not relevant to the admitted contention, are readily accessible in ADAMS. In addition, pursuant to the agreement of the parties, the Staff will continue to work with both parties to provide access to documents.

On or around February 15, 2013, the supplement to the hearing file will be made available via the Electronic Hearing Docket (EHD), which may be accessed at the following URL:

http://adams.nrc.gov/ehd/. The hearing file will be contained in a sub-folder entitled, Watts Bar Hearing File" of the Watts_Bar_50-391-OL" folder of the EHD.

Further, attached is the affidavit of Justin C. Poole certifying that all relevant materials required under the agreement of the parties by this section have been disclosed, and that the disclosures are accurate and complete for documents identified as of February 5, 2013.

Sincerely,

/Signed (electronically) by/

David Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov Signed: February 15, 2013

Enclosures:

Attachment 1 - Public Hearing File Index Affidavit of Justin C. Poole

ATTACHMENT 1 WATTS BAR OPERATING LICENSE APPLICATION HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplemental Disclosures - February 15, 2013 Accession Document ID# Title Number Date 2012/12/10 Watts Bar 2 OL - TVA letter to NRC_12-10-12_GA Document 37-0001 ML13007A052 12/10/2012 Response_SSER Item 80_Final.pdf 37-002 ML13007A053 12/13/2012 2012/12/13 Watts Bar 2 OL - 2012-12 WBN Project Plan - Unit 2.pdf 2012/12/18 Watts Bar 2 OL - TVA letter to NRC_12-17-12_2-PTI-063-06 transmittal to 37-003 ML13007A054 12/18/2012 NRC Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3;37-004 Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2 -

ML12348A571 1/4/2013 Reassignment of Branch Chief for Plant Licensing Branch II-2.

Bellefonte, Units 1 & 2, Browns Ferry, Units 1, 2 & 3, Sequoyah, Units 1 & 2, Watts Bar, Unit 1 & 2, Response to March 12, 2012, Request for Information Enclosure 2,37-005 Recommendation 2.1, Flooding , Required Response 1, Integrated Assessment ML13032A069 1/29/2013 Approach.

Notification of Part 21 Report re Belden EPDM Lead Wire Used in Rewind of 37-006 ML13029A498 1/18/2013 Environmentally Qualified (EQ) Form-wound Motors Is Not Fully Qualified.37-007 Watts Bar Nuclear Plant Unit 2 - Documentation of Liability Insurance Coverage ML13030A032 1/24/2013 Requested Per Supplemental Safety Evaluation Report (SSER) Open Item 25.37-008 Watts Bar Nuclear Plant, Units 1 and 2 - Letter - Request for Additional Information Regarding Physical Security Plan, Training, and Qualification Plan, and Safeguards ML12356A240 1/2/2013 Contingency Plan (TAC No. MF0443).37-009 Watts Bar, Unit 2, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 9 (TAC No. MD6311), and Status of Generic ML13023A315 1/17/2013 Communications for Unit 2 -Revision 9 (TAC MD8314).37-010 Watts Bar, Unit 2, Supplemental Safety Evaluation Report Appendix HH Item 50, ML13030A031 1/24/2013 Anchor Bolt Documentation and Pull Tests - Revision.37-011 Watts Bar, Unit 2, Waste Confidence Rulemaking and Environmental Impact ML13030A030 1/24/2013 Statement.

February 15, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL

)

(Watts Bar Nuclear Plant, Unit 2) )

AFFIDAVIT OF JUSTIN C. POOLE CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Justin C. Poole, do hereby state as follows:

1. I am employed as Senior Project Manager, Plant Licensing Branch LPL II-2, in the Division of Operator Reactor Licensing in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. My responsibilities include oversight of the NRC Staffs review and evaluation of the Watts Bar Nuclear Plant, Unit 2 operating license application (OLA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the OLA at issue in this proceeding.
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 and 2.1203, as modified by the parties agreement of December 1, 2009, have been disclosed, and that the disclosures are accurate and complete for documents identified as of February 5, 2013.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

/Executed in Accord with 10 CFR 2.304(d)/

Justin C. Poole Senior Project Manager, NRR/DORL/LPL II-2 U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: (301)415-2048 E-mail: Justin.Poole@nrc.gov Date Signed: February 15, 2013

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 50-391-OL

)

(Watts Bar Nuclear Plant, Unit 2) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (revised), I hereby certify that copies of the foregoing NRC STAFF'S SUPPLEMENTAL DISCLOSURE, INCLUDING HEARING FILE INDEX AND AFFIDAVIT OF JUSTIN C. POOLE dated February 15, 2013, have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 15th day of February, 2013:

/Signed (electronically) by/

David E. Roth Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-2749 E-mail: David.Roth@nrc.gov Signed: February 15, 2013