|
---|
Category:Letter
MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 2024-01-31
[Table view] |
Text
Entergy Services, Inc 1340 Echelon Parkway Jackson, Mississippi 39213_W- yTel 601-368-5000 To Whom It May Concern: Please retain the enclosed Standard Practice Procedures Plan's for Waterford 3 Nuclear Power Station and Palisades Nuclear Plant.If you have any questions, please contact me at: mcastercentergy.
com-or-601-201-7388 Regards, Michael R. Caster Security Coordinator Entergy Services, Inc.
Standard Practice Procedures Plan The following Standard Practice Procedures Plan applies to Entergy Operations, Inc. facilities authorized to use but not possess Classified Information.
This document outlines the security responsibilities of: Palisades Nuclear Power Plant With its principle office and place of business at: 1340 Echelon Parkway Jackson, MS 39213 Doing business at the address below: 27780 Blue Star Highway Covert, Ml 49043 The provision of our license with the Nuclear Regulatory Commission (NRC) does not require our company to receive, store, transmit, or originate Classified Information within our facilities.
This company's personnel will, however, have authorized access to Classified Information at approved NRC facilities.
The NRC security clearances granted our personnel have been issued, or approved by NRC headquarters.
We understand that our company will be responsible for ensuring that the following security requirements are met: Initial and annual refresher briefings are conducted and documented as required by 10 CFR Part 95 and that the SF-312, Classified Information Nondisclosure Agreement Form, is signed and processed prior to any access to Classified Information.
Termination briefings are conducted and documented in accordance with 10 CFR Parts 25 and 95 for all cleared individuals leaving our employment, losing their clearances, or no longer requiring a clearance.
Termination statements are forwarded to NRC headquarters..
Cleared company personnel are apprised of and comply with the personnel clearance reporting requirements.
Foreign National employees are not placed in a position to exercise control or influence over properly cleared U.S. citizens who have been granted access to NRC classified information.
1 of 2 Standard Practice Procedures Plan Reporting requirements involving foreign ownership, control, or influence conditions are complied with.Procedures are developed describing internal company processes for performing functions to accomplish each of the items above. Applicable company employees will be familiar and comply with security procedures and be informed of their individual responsibilities in executing and supporting these procedures.
Designated representatives of the NRC are required periodically to inspect the procedures, methods, and facilities utilized by the company in complying with the requirements of the terms and conditions of 10 CFR Part 25 and 95. The company shall assist by providing necessary documentation for review.CERTIFICATIONS I have been designated as the Facility Security Officer for the above mentioned site. I will be responsible for ensuring the above requirements are fully complied with.David Berkenpas Name Signature 269-764-2835 Phone Number Certified By Fred Marcussen Title Director, Security 09-05-2013 Date Signature
& Date 2 of 2 Standard Practice Procedures Plan The following Standard Practice Procedures Plan applies to Entergy Operations, Inc. facilities authorized to use but not possess Classified Information.
This document outlines the security responsibilities of: Waterford 3 Nuclear Power Plant With its principle office and place of business at: 1340 Echelon Parkway Jackson, MS 39213 Doing business at the address below: 17265 River Road Killona, LA 70057 The provision of our license with the Nuclear Regulatory Commission (NRC) does not require our company to receive, store, transmit, or originate Classified Information within our facilities.
This company's personnel will, however, have authorized access to Classified Information at approved NRC facilities.
The NRC security clearances granted our personnel have been issued, or approved by NRC headquarters.
We understand that our company will be responsible for ensuring that the following security requirements are met: Initial and annual refresher briefings are conducted and documented as required by 10 CFR Part 95 and that the SF-312, Classified Information Nondisclosure Agreement Form, is signed and processed prior to any access to Classified Information.
Termination briefings are conducted and documented in accordance with 10 CFR Parts 25 and 95 for all cleared individuals leaving our employment, losing their clearances, or no longer requiring a clearance.
Termination statements are forwarded to NRC headquarters.
Cleared company personnel are apprised of and comply with the personnel clearance reporting requirements.
Foreign National employees are not placed in a position to exercise control or influence over properly cleared U.S. citizens who have been granted access to NRC classified information.
1 of 2 Standard Practice Procedures Plan Reporting requirements involving foreign ownership, control, or influence conditions are complied with.Procedures are developed describing internal company processes for performing functions to accomplish each of the items above. Applicable company employees will be familiar and comply with security procedures and be informed of their individual responsibilities in executing and supporting these procedures.
Designated representatives of the NRC are required periodically to inspect the procedures, methods, and facilities utilized by the company in complying with the requirements of the terms and conditions of 10 CFR Part 25 and 95. The company shall assist by providing necessary documentation for review.CERTIFICATIONS I have been designated as the Facility Security Officer for the above mentioned site. I will be responsible for ensuring the above requirements are fully complied wi.Andre James Pod, IL f4Add Name Sign4(ure q.-~-i3 504-739-6340 Phone Number Date Signature
& Date Certified By Title Fred Marcussen Director, Security 2 of 2