|
---|
Category:E-Mail
MONTHYEARML24270A2622024-09-26026 September 2024 Email to Petitioners and Licensee Representatives Transmitting Order of the Secretary Re Petition for Declaratory Order from Beyond Nuclear Et Al., for the Palisades Nuclear Plant ML24269A0162024-09-24024 September 2024 Email from Holtec Decommissioning International, LLC Re Reply to Beyond Nuclear Et Al.S Petition for Declaratory Order ML24262A2232024-09-18018 September 2024 Part Event Notification 57330. Part 21 - Control Relay Defect ML24262A0732024-09-18018 September 2024 Restart La Docs - FW Palisades Scoping Comment Period Ended ...E-mail Capture Platform Status ML24262A0742024-09-18018 September 2024 Restart La Docs - FW Palisades Scoping Comment Period Ended ...E-mail Capture Platform Status ML24260A3552024-09-16016 September 2024 Restart La Docs - Palisades Reauthorization of Power Operations- Environmental Audit RCI Responses ML24260A3542024-09-12012 September 2024 Restart La Docs - (External_Sender) Re Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24250A0502024-09-0606 September 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML24250A0542024-09-0606 September 2024 LRA - Requests for Additional Information - Set 1 - Email from Brian Harris to Adam Peck ML24256A1402024-09-0505 September 2024 Preliminary Data Needs and Agenda to Support the Supplemental Environmental Audit for Point Beach, Units 1 and 2 - File Copy ML24248A0572024-09-0404 September 2024 Restart La Docs - Draft Letter in Support of Draft RAIs and Draft Environmental Regulatory Audit Plan ML24248A2622024-09-0404 September 2024 Restart La Docs - FW Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A2612024-09-0404 September 2024 Restart La Docs - Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A0902024-08-28028 August 2024 Steam Generator Inspection Call ML24235A2032024-08-22022 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Final Determination e-mail - EPID L-2024-CRS-0000 ML24226A6842024-08-13013 August 2024 NRR E-mail Capture - Point Beach, Units 1 and 2 - Acceptance of License Amendment Request to Adopt TSTF-577 ML24270A2712024-08-0707 August 2024 Public Comments for August 1, 2024, Public Outreach Meeting on Potential Palisades Nuclear Plant Restart ML24215A2092024-08-0101 August 2024 NRR E-mail Capture - Final RAI - Point Beach 1 & 2 - License Amendment Request to Modify Containment Average Air Temperature Requirements ML24205A0622024-07-23023 July 2024 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval to Extend the Alternative for Use of Full Structural Weld Overlay ML24199A2142024-07-17017 July 2024 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Modify Containment Average Air Temperature Requirements ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24192A0012024-07-0606 July 2024 (E-Mail) Palisades Nuclear Plant - Plant - Draft Request for Additional Information: Palisades Operating TS License Amendment Request - June 6, 2024 ML24187A1332024-07-0505 July 2024 LTR-24-0069 Emailed Response Regarding Palisades Restart Project ML24184C0422024-07-0202 July 2024 NRR E-mail Capture - Request for Additional Information Diablo Canyon 50.69 risk-informed Categorization ML24187A1382024-07-0202 July 2024 License Renewal Environmental Review: Summary of June 27 Clarification Call Regarding Pg&Es Response to RCI AQN-3 ML24192A1472024-06-28028 June 2024 Email - Palisades Nuclear Plant - Draft Request for Additional Information: Palisades Administrative TS License Amendment Request - June 28, 2024 ML24192A1672024-06-28028 June 2024 Restart - NRC Request for Additional Information - EP ORO Coordination - June 28, 2024 ML24248A0562024-06-27027 June 2024 Restart La Docs - Draft Letter in Support of Draft RAIs and Draft Environmental Regulatory Audit Plan ML24149A0832024-05-28028 May 2024 Acceptance Review: Diablo Canyon Request for Alternative Security Measures and Exemption for the Early Warning System ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24144A1082024-05-22022 May 2024 Acceptance Review Adoption of TSTF-569, Revise Response Time Testing Definition (EPID L-2024-LLA-0059) - Email ML24145A0612024-05-22022 May 2024 Written Limited Appearance Statement of Doris Nassiry ML24135A3542024-05-20020 May 2024 NRC Response to Jody Flynn of Michigan Regarding Statements Made About Holtec in the April 25, 2024 Peekskill Herald Article: Holtec Playing Fast and Loose with Taxpayers Money by Tina Volz-Bongar (Docket 50-255) ML24141A0862024-05-16016 May 2024 Notification of NRC Activities Regarding Palisades Restart ML24170A8812024-05-15015 May 2024 NRR E-mail Capture - Post Acceptance/Abeyance Process for the 10 CFR 2.206 Petition on Palisades Misuse of Decommissioning Trust Fund ML24136A1622024-05-15015 May 2024 OEDO-24-00083 (E-Mail) 10 CFR 2.206 - Diablo Canyon Power Plant, Unit Nos. 1 and 2 Seismic - Initial Assessment ML24134A1902024-05-10010 May 2024 Written Limited Appearance Statement of Shelley Hamilton ML24134A1872024-05-10010 May 2024 Written Limited Appearance Statement of Charlene M. Woodcock ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24122C6702024-04-29029 April 2024 Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24108A1022024-04-17017 April 2024 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Revision to Reactor Vessel Surveillance ML24095A3172024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Revise Technical Specification 5.6.6 for Pressure and Temperature Limits Report ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24088A2382024-03-28028 March 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 OEDO-24-00083 - Screen-in e-mail L-2024-CRS-0000 ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML24058A1032024-03-0808 March 2024 OEDO-23-00350-NRR - Initial Assessment - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24071A1762024-03-0707 March 2024 Email - (External Sender) NRC Proceeding on Diablo Canyon 50-275 and 50-323 LR-2 ML24067A0892024-03-0505 March 2024 Email Response from Diane Curran to Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0902024-03-0505 March 2024 Email to Diane Curran from the Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0882024-03-0404 March 2024 Email Hearing Request from San Luis Obispo Mothers for Peace, Friends of the Earth, and Environmental Working Group 2024-09-06
[Table view] |
Text
Zerth, Marjorie From: Sent: To: Giessner, John Wednesday, July 15, 2015 6:04 PM Zerth, Marjorie
Subject:
FW: Re: [External_Sender]
Hi John, a question re: a document you wrote in April 2013 From: Giessner, John Sent: Wednesday, July 15, 2015 6:03 PM To: 'Kevin Kamps'
Subject:
RE: Re: [External_Sender]
Hi John, a question re: a document you wrote in April 2013 Mr. Kamps for your question and the follow-up.
My apologies I got a little behind today. I did review the issue with the Agency's experts and I confirmed the date listed for Diablo Canyon is accurate as 2033. I do want to note, as stated in the answer for question 4, this value is an estimate.
Updated fluence calculations, capacity factors changes, power uprates, new surveillance data, among other items can change these estimates.
I hope this answers your question.
Jack Jack Giessner Deputy Director DRP R3 From: Kevin Kamps Sent: Wednesday, July 15, 2015 5:59 PM To: Giessner, John
Subject:
[External_Sender]
Re: [External_Sender]
Hi John, a question re: a document you wrote in April 2013 Hi Jack Just fiJJ!owing up about this question below. Thanks. Kevin Kamps, Beyond Nuclear On Fri, Jul 10, 2015 at 8: 18 Pl\1, Cfiessner, John From: Kevin Kamps Sent: Friday, July lO, 2015 05:54 PM To: Giessner, John wrote: 1
Subject:
[External_Sender]
Hi John, a question re: a document you wrote in April 2013 Hi John, How are you? I have a question about this April 18, 2013 document you wrote: See Point #4, on Page 5 of 15 on PDF counter. Re: this listing: 1. Point Beach 2 (2017) 2. Palisades (2017) 3. DiabJo Canyon 1 (2033) 4. Indian Point 3 (2025) 5. Beaver Valley 1 (2033) Is this completely accurate?
Is #3, E>iablo\;an)'on 1 (20$$) a typo? It says 2033, but is it supposed to say 2023? I ask because the weird order has always seemed odd to me. It appears to be a chronologically ordered list, but #3 is out of order. But if it is 2023, that would put it back into chronological order. The Kalamazoo Gazette seems to have interpreted it that way, reporting last summer the Diablo Canyon 1 date not as 2033, but rather 2023:
nuclear pla!JL_embrit.
html [see 8 paragraphs down in the section entitled "A crucial question of safety".]
Any clarification/confirmation you could provide would be most appreciated.
Thanks. ---Kevin Kamps, Beyond Nuclear & Don't Waste Ml Kevin Kamps Radioactive Waste Watchdog Beyond Nuclear 6930 CaITolI A venue, Suite 400 Takoma Park, :tvfaryland 20912 Office: 1 Cell: Fax: .... _ ........ -........................
.. 2 Beyond Nuclear aims to educate and activate the public about the connections between nuclear power and nuclear vveapons and the need to abandon both to safeguard our future. Beyond Nuclear advocates for an energy future that is sustainable, benign and democratic.
Kevin Kamps Radioactive Waste Watchdog Beyond Nuclear 6930 Carroll Avenue, Suite 400 Takoma Park. Maryland 20912 Office: (301) 270-2209 ext. 1 Cell: (240) 462-3216 Fax: (30 I) 270-4000 Beyond Nuclear aims to educate and activate the public about the connections between nuclear power and nuclear weapons and the need to abandon both to safeguard our future. Beyond Nuclear advocates for an energy future that is sustainable, benign and democratic.
3