DCL-15-134, ISFSI - Submits 2014 Annual Commitment Change Summary Report
ML15309A764 | |
Person / Time | |
---|---|
Site: | Diablo Canyon ![]() |
Issue date: | 11/05/2015 |
From: | Welsch J Pacific Gas & Electric Co |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
References | |
DCL-15-134, DIL-15-023 | |
Download: ML15309A764 (1) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Letter type:DCL
MONTHYEARDCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024
[Table view]Nuclear Material Transaction Report for New Fuel DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System DCL-23-092, Material Status Report for the Period Ending August 31, 20232023-09-28028 September 2023 Material Status Report for the Period Ending August 31, 2023 DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff2023-09-13013 September 2023 Upcoming Meeting with Nuclear Security and Incident Response Staff DCL-23-078, Nuclear Material Transaction Report for New Fuel2023-09-0606 September 2023 Nuclear Material Transaction Report for New Fuel DCL-23-070, Withdrawal of Request Regarding Senior Reactor Operator License Application2023-08-16016 August 2023 Withdrawal of Request Regarding Senior Reactor Operator License Application DCL-23-068, Nuclear Material Transaction Report for New Fuel2023-08-0909 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-066, Nuclear Material Transaction Report for New Fuel2023-08-0303 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure2023-07-27027 July 2023 Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure DCL-23-064, Nuclear Material Transaction Report for New Fuel2023-07-26026 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-054, License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-07-13013 July 2023 License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-055, Nuclear Material Transaction Report for New Fuel2023-07-0606 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-042, Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 02023-05-24024 May 2023 Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 0 DCL-23-032, Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program2023-05-22022 May 2023 Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program DCL-23-041, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20222023-05-22022 May 2023 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2022 DCL-23-038, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2023-05-15015 May 2023 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Nonradiological Environmental Operating Report DCL-23-036, 2022 Annual Radiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Radiological Environmental Operating Report DCL-23-025, 2022 Annual Radioactive Effluent Release Report2023-05-0101 May 2023 2022 Annual Radioactive Effluent Release Report DCL-2023-512, Submittal of Receiving Water Monitoring Program 2022 Annual Report2023-04-27027 April 2023 Submittal of Receiving Water Monitoring Program 2022 Annual Report DCL-23-035, Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application2023-04-24024 April 2023 Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application DCL-23-028, Technical Specification Bases, Revision 142023-04-24024 April 2023 Technical Specification Bases, Revision 14 DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 20232023-04-20020 April 2023 Report on Discharge Monitoring for the First Quarter of 2023 DCL-23-031, Submittal of Annual Report of Occupational Radiation Exposure for 20222023-04-19019 April 2023 Submittal of Annual Report of Occupational Radiation Exposure for 2022 DCL-23-024, Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2023-04-0404 April 2023 Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-23-022, 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant2023-03-29029 March 2023 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-23-021, Independent Spent Fuel Storage Installation, Emergency Plan Update2023-03-23023 March 2023 Independent Spent Fuel Storage Installation, Emergency Plan Update DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts2023-03-17017 March 2023 Responses to NRC Questions Regarding License Renewal Efforts DCL-23-009, Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage2023-02-22022 February 2023 Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage DCL-23-008, Request Regarding Senior Reactor Operator License Application2023-02-22022 February 2023 Request Regarding Senior Reactor Operator License Application DCL-2023-503, Annual Sea Turtle Report2023-01-26026 January 2023 Annual Sea Turtle Report DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring2023-01-18018 January 2023 (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring DCL-22-091, Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage2022-12-20020 December 2022 Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage DCL-22-089, Core Operating Limits Report for Unit 2 Cycle 242022-12-20020 December 2022 Core Operating Limits Report for Unit 2 Cycle 24 DCL-22-085, Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application2022-10-31031 October 2022 Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 2024-01-29 Category:Report MONTHYEARML23307A1622023-11-0303 November 2023
[Table view]OIG-24-A-01 Inspector Generals Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 2024 ML23130A0052023-06-27027 June 2023 Report to Congress Regarding Diablo Canyon ML22108A2892022-05-0303 May 2022 Enclosure - Response to Representative Carbajal Regarding OIG Report on Diablo ML22108A1662022-05-0303 May 2022 Enclosure 1 - Assessment Event Inquiry Into the Nuclear Regulatory Commission Oversight of the Auxiliary Feedwater System at Diablo Canyon Nuclear L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation DCL-21-071, Federally Listed Species Affects Determination Memorandum2021-10-14014 October 2021 Federally Listed Species Affects Determination Memorandum ML21188A0362021-07-0707 July 2021 Draft PG&E Letter DCL-21-046 - Diablo Canyon Unit 1: Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML21076A6142021-03-17017 March 2021 NRC Examination Report 05000275/2021301 and 05000323/2021301 ML20353A3972020-12-18018 December 2020 NRC Response to Public Comment Regarding Spent Fuel Canister Drop from 2019 Regcon DCL-20-102, Nuclear Material Transaction Report for New Fuel2020-12-0909 December 2020 Nuclear Material Transaction Report for New Fuel ML20335A0132020-11-30030 November 2020 NRC Response to Public Watchdogs November 2 ML20328A3012020-11-23023 November 2020 NERC Reliability Standards for the Bulk Electric System of North America Updated July 20, 2020 (Cgnp Public Comments on Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Pre-submittal Meeting of 11/24/2020) ML20239A9562020-08-26026 August 2020 Evaluation of the Potential Piping Degradation Safety Concern on the Auxiliary Feedwater System at Diablo Canyon Unit 1 DCL-19-054, Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 12019-07-0101 July 2019 Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 1 ML18254A0402019-01-22022 January 2019 Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 22018-09-11011 September 2018 Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 IR 05000275/20180052018-08-31031 August 2018 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2018005 and 05000323/2018005) DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-72018-08-0808 August 2018 Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 DCL-18-027, Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insight2018-04-24024 April 2018 Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insights ML17024A2072017-12-18018 December 2017 Staff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation ML17341A0652017-11-30030 November 2017 Technical Evaluation Report Diablo Canyon Nuclear Power Plant Tsunami Hazard Reevaluation Review ML17334A1052017-11-29029 November 2017 Reactor Coolant System Pressure and Temperature Limits Report ML17229B6172017-08-17017 August 2017 Flaw Evaluation of Residual Heat Removal Suction Weld Joint DCL-17-064, Plant Focused Evaluation Report for External Flooding2017-07-19019 July 2017 Plant Focused Evaluation Report for External Flooding DCL-17-049, Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint2017-05-18018 May 2017 Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint DCL-16-117, Reactor Coolant System Pressure and Temperature Limits Report, Revision 152016-11-10010 November 2016 Reactor Coolant System Pressure and Temperature Limits Report, Revision 15 DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 52016-11-0909 November 2016 Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 ML16314C6912016-11-0909 November 2016 Enclosure, Statement of the Problem Concerning PWR Primary Coolant System Pipe Rupture ML16314B0822016-11-0909 November 2016 Criteria for Protection Against Dynamic Effects Associated with a Postulated Rupture of Piping ML16287A7552016-10-0606 October 2016 Technical Assessment Implementation of Alternative Source Terms Summary of Dose Analyses and Results Revision 4 ML16215A1092016-08-0202 August 2016 OEDO-16-00436 - Supplemental Information from Mr. Lochbaum 10 CFR 2.206 Petition on Apparent Violation of 10 CFR 50.9 at Diablo Canyon Nuclear Power Plant ML16169A2652016-05-18018 May 2016 Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 ML16146A0952016-04-21021 April 2016 54006-CALC-01, Diablo Canyon Power Plant: Evaluation of Risk Significance of Permanent ILRT Extension. ML16238A1042016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). DCL-16-081, 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm).2016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16019A2242016-02-0101 February 2016 Record of Review, Dispositions to Diablo Canyon Nuclear Plant, Units 1 and 2, Internal Events, Internal Flooding, Seismic, and Fire PRA Facts and Observations ML16061A4642016-01-15015 January 2016 Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi ML16061A4682016-01-15015 January 2016 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi DCL-16-020, Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV ML16061A4592016-01-14014 January 2016 Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report2016-01-14014 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16048A2152015-12-15015 December 2015 Fleet Vehicle-Asset List ML16048A2072015-12-15015 December 2015 Once Through Cooling ML16004A3542015-12-11011 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Terms Summary of Dose Analysis & Results, Revision 1 DCL-15-134, ISFSI - Submits 2014 Annual Commitment Change Summary Report2015-11-0505 November 2015 ISFSI - Submits 2014 Annual Commitment Change Summary Report DCL-15-102, 10 CFR 71.95 Report Regarding Energy Solutions' Model 8-120B Shipping Cask2015-08-24024 August 2015 10 CFR 71.95 Report Regarding Energy Solutions' Model 8-120B Shipping Cask ML15231A5712015-07-28028 July 2015 Holtec Information Bulletin (HIB) No. 67 (Rev. 0), VCT Restraint Strap Weld Failure ML15160A2612015-07-0101 July 2015 Letter to NMFS Notice of Intent to Reinitiate Scoping Process for Diablo Canyon Power Plant Units 1 and 2 License Renewal Application ML16048A2042015-06-30030 June 2015 Notice of Intent, General Permit to Discharge Storm Water 2023-06-27 Category:Technical MONTHYEARML23307A1622023-11-0303 November 2023
[Table view]OIG-24-A-01 Inspector Generals Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 2024 L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation ML21076A6142021-03-17017 March 2021 NRC Examination Report 05000275/2021301 and 05000323/2021301 ML20239A9562020-08-26026 August 2020 Evaluation of the Potential Piping Degradation Safety Concern on the Auxiliary Feedwater System at Diablo Canyon Unit 1 DCL-19-054, Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 12019-07-0101 July 2019 Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 1 DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 22018-09-11011 September 2018 Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-72018-08-0808 August 2018 Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 DCL-18-027, Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insight2018-04-24024 April 2018 Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insights ML17341A0652017-11-30030 November 2017 Technical Evaluation Report Diablo Canyon Nuclear Power Plant Tsunami Hazard Reevaluation Review ML17334A1052017-11-29029 November 2017 Reactor Coolant System Pressure and Temperature Limits Report ML17229B6172017-08-17017 August 2017 Flaw Evaluation of Residual Heat Removal Suction Weld Joint DCL-17-064, Plant Focused Evaluation Report for External Flooding2017-07-19019 July 2017 Plant Focused Evaluation Report for External Flooding DCL-17-049, Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint2017-05-18018 May 2017 Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 52016-11-0909 November 2016 Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 ML16314C6912016-11-0909 November 2016 Enclosure, Statement of the Problem Concerning PWR Primary Coolant System Pipe Rupture ML16314B0822016-11-0909 November 2016 Criteria for Protection Against Dynamic Effects Associated with a Postulated Rupture of Piping ML16287A7552016-10-0606 October 2016 Technical Assessment Implementation of Alternative Source Terms Summary of Dose Analyses and Results Revision 4 ML16169A2652016-05-18018 May 2016 Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 ML16146A0952016-04-21021 April 2016 54006-CALC-01, Diablo Canyon Power Plant: Evaluation of Risk Significance of Permanent ILRT Extension. DCL-16-081, 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm).2016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16238A1042016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi ML16061A4642016-01-15015 January 2016 Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi ML16061A4682016-01-15015 January 2016 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV DCL-16-020, Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV ML16061A4592016-01-14014 January 2016 Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report2016-01-14014 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16004A3542015-12-11011 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Terms Summary of Dose Analysis & Results, Revision 1 DCL-15-134, ISFSI - Submits 2014 Annual Commitment Change Summary Report2015-11-0505 November 2015 ISFSI - Submits 2014 Annual Commitment Change Summary Report ML15176A5282015-05-15015 May 2015 License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 82015-05-15015 May 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 ML16061A4752014-12-12012 December 2014 Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report ML16061A4712014-12-12012 December 2014 Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report2014-12-12012 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report2014-12-12012 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report DCL-16-020, Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report2014-12-12012 December 2014 Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report ML16061A4602014-12-0909 December 2014 Revision 9 to 993754-1-915-NP, Safety Analysis DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis2014-12-0909 December 2014 Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis ML16061A4692014-12-0101 December 2014 Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report ML16061A4662014-12-0101 December 2014 Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report ML16061A4732014-12-0101 December 2014 Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-854-0-NP, Protection Set Iii, Hardware Validation Test Report2014-09-12012 September 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-854-0-NP, Protection Set Iii, Hardware Validation Test Report ML16061A4702014-09-12012 September 2014 Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report ML16061A4742014-09-12012 September 2014 Revision 0 to 993754-14-854-0-NP, Protection Set Iv, Hardware Validation Test Report ML16061A4762014-09-12012 September 2014 Revision 0 to 993754-13-854-0-NP, Protection Set Iii, Hardware Validation Test Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report2014-09-12012 September 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-0-NP, Protection Set Iv, Hardware Validation Test Report2014-09-12012 September 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-0-NP, Protection Set Iv, Hardware Validation Test Report 2023-11-03 |
Text
Pacific Gas and Electric Company November 5, 2015 PG&E Letter DCL-15-134 PG&E Letter DIL-15-023 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Materials License No. SNM-2511, Docket No. 72-26 James M. Welsch Site Vice President Diablo Canyon Independent Spent Fuel Storage Installation 2014 Annual Commitment Change Summary Report Dear Commissioners and Staff: Diablo Canyon Power Plant Mail Code 104/6 P. 0. Box 56 Avila Beach, CA 93424 805.545.3242 Internal:
691.3242 Fax: 805.545.4884 In accordance with Nuclear Energy Institute (NEI) 99-04, "Guidelines for Managing NRC Commitment Changes," Revision 0, endorsed by the U.S. Nuclear Regulatory Commission (NRC) in SECY-00-0045, "Acceptance Of NEI 99-04, 'Guidelines for Managing NRC Commitments,"'
Pacific Gas and Electric Company (PG&E) is submitting this letter regarding Regulatory Commitment Changes for Diablo Canyon Power Plant, Units 1 and 2 and the Independent Spent Fuel Storage Installation.
During the period of January 1, 2014; through December 31, 2014, there were no regulatory commitment changes considered by NEI 99-04 to require notification.
Commitment changes that are contained in 10 CFR 50.59 evaluation summary reports, or in other submittals previously transmitted to the NRC, are not provided as part of this report. PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. If you have any questions or require additional information, please contact Mr. Hossain Hamzehee at (805) 545-4720.
Sincerely,
-Welsch BNSM/4540/641 07 481 cc: Marc L. Dapas, NRC Region IV Administrator Thomas R. Hipschman, NRC Senior Resident Inspector Siva P. Lingam, NRR Project Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek Pacific Gas and Electric Company November 5, 2015 PG&E Letter DCL-15-134 PG&E Letter DIL-15-023 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Materials License No. SNM-2511, Docket No. 72-26 James M. Welsch Site Vice President Diablo Canyon Independent Spent Fuel Storage Installation 2014 Annual Commitment Change Summary Report Dear Commissioners and Staff: Diablo Canyon Power Plant Mail Code 104/6 P. 0. Box 56 Avila Beach, CA 93424 805.545.3242 Internal:
691.3242 Fax: 805.545.4884 In accordance with Nuclear Energy Institute (NEI) 99-04, "Guidelines for Managing NRC Commitment Changes," Revision 0, endorsed by the U.S. Nuclear Regulatory Commission (NRC) in SECY-00-0045, "Acceptance Of NEI 99-04, 'Guidelines for Managing NRC Commitments,"'
Pacific Gas and Electric Company (PG&E) is submitting this letter regarding Regulatory Commitment Changes for Diablo Canyon Power Plant, Units 1 and 2 and the Independent Spent Fuel Storage Installation.
During the period of January 1, 2014; through December 31, 2014, there were no regulatory commitment changes considered by NEI 99-04 to require notification.
Commitment changes that are contained in 10 CFR 50.59 evaluation summary reports, or in other submittals previously transmitted to the NRC, are not provided as part of this report. PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. If you have any questions or require additional information, please contact Mr. Hossain Hamzehee at (805) 545-4720.
Sincerely,
-Welsch BNSM/4540/641 07 481 cc: Marc L. Dapas, NRC Region IV Administrator Thomas R. Hipschman, NRC Senior Resident Inspector Siva P. Lingam, NRR Project Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway