LER 79-011/03L-0 on 790223:auxiliary Feedwater Discharge Valve Would Not Close from Control Room.Caused by Loose Connection in Hot Shutdown Panel.Connection Tightened & Correct Valve Operation Verified
ML17317B031
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 03/20/1979
From: Beilman T
INDIANA MICHIGAN POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17317B029 List:
References
LER-79-011-03L, LER-79-11-3L, NUDOCS 7903290033
Download: ML17317B031 (2)


Text

U.S.NUCLEAR REGULATORY COMMISSION NRC.FORM 366 I7-77)LICENSEE f VENT REPORT CONTROL BLOCK: Q1{PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

I 6~oi M I D C C I Qo0 0 0 0 0 0 0 0 0 0 0Qo 4 1 1 1 1 ps~ps , 7 8 9 LICENSEE.CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58 CON'T~o1~LQB O 5 O O O 3 1 5 Q7 0 2 2 3 7 9 Qs O 3 2 O 7 09 7 8 60 61 DOCKET NUMBER 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Q10 WHILE PERFORMING A SURVEILLANCE TEST ON AUXILIARY FEEDWATER DISCHARGE VALVE FMO-212 IT WAS DISCOVERED THAT THE VALVE WOULD NOT CLOSE FROM THE CONTROL ROOM.ALTHOUGH THE VALVE FAILED IN THE CONSERVATIVE POSITION THE REQUIREMENTS OF~os T.S.4.7.1.2.a.4 IIERE NOT FULFILLED UNTIL REPAIRS IIERE COMPLETED.

THE TIME~o6 LIMIT IMPOSED BY T.S 3 7 1 2 WAS OBSERVED WITH REPAIRS COMPLETED WITHIN ELEVEN HOURS OF DISCOVERY.

A SIMILAR OCCURRENCE WAS REPORTED UNDER 315/78-018.

~OS 7 8 9 80~09 CONNECTION WAS TIGHTENED AND CORRECT VALVE OPERATION WAS VERIFIED.THE LOOSE CONNECTIONS WERE ATTRIBUTED TO CONSTRUCTION INSTALLATION, AND FOLLOWING THIS EVENT, ALL TERMINAL BOARD CONNECTIONS IN THE UNIT ONE AND TWO HOT SHUTDOWN PANELS lOERE VERIFIED TO BE TIGHT.SYSTEM CAUSE CAUSE g, Q~>>ao V A L V 0 P Ql4~l(Qis~k Qs 7 8 9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION 21 22 23 24 26 27 28 29 30 31 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT, NPRDP PRIME COMP.COMPONENT"~~pls~~Qo~poo~Q>>~PJ Q>>PJQ4 PJ Qs Qs 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o THE CAUSE WAS DETERMINED TO BE A LOOSE CONNECTION IN THE HOT SHUTDOWN PANEL THE 7 8 9 FACILITY Qs~IO 0 P>>7 8 9 10 12 13 44 ACTIVITY CONTENT RELFASED OF RFf EASE AMOUlggF ACTIVITY Q36 CZ LJQ>>Lips 7 8 9 10 PERSONNEL EXPOSURES OŽ'"Q'"'"'""" 7 8 9 11 12 13 PERSONNEL INJURIES EZ Loools"-Q NA METHOD OF 45 46 NA 45 LOCATION OF RELEASE Q 80 80 80 80 7 8 9 11 12 LOSS OF OR DAMAGE TO FACILITY 43 7 8 9 10 PUBLICITY ISQIED DESCRIPTION

~KZ<Q44 8 9 10 NAME OF PREPARER P eilman 80 68 69 616-.465.,5gO]

80 NRC USE ONI.Y ss O 80 o 0 vs~'4