Similar Documents at Cook |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217J4721999-10-15015 October 1999 Forwards NRC Physical Security Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24.Two Violations Noted & Being Treated as Ncvs,Consistent with App C of Enforcement Policy. Areas Examined Exempt from Disclosure,Per 10CFR73.21 IA-99-379, First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety1999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20217D9241999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML20196K5961999-06-30030 June 1999 Ltr Contract:Task Order 40, DC Cook Extended Sys Regulatory Review Oversight Insp, Under Contract NRC-03-98-021 ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML20207A9201999-05-21021 May 1999 Ack Receipt of 990319 Response to Notice of Violation & Proposed Imposition of Civil Penalty .On 981124, Licensee Remitted Check for Payment of Civil Penalties. Licensee Requests for Extension for Response,Granted ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML20205P0591999-04-14014 April 1999 Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed ML17325B5141999-03-30030 March 1999 Forwards Rept on Status of Decommissioning Funding.Attached Rept Includes Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML17325B5191999-03-29029 March 1999 Forwards LER 99-001-00,re Degraded Component Cw Flow to Containment Main Steam Line Penetrations.Commitment, Listed ML20204F6401999-03-19019 March 1999 Responds to NRC 981013 NOV & Proposed Imposition of Civil Penalty.Violations Cited in Subject NOV Were Initially Identified in Referenced Five Insp Repts.Corrective Actions: Ice Condensers Have Been Completely Thawed of Any Blockage ML17325B4751999-03-18018 March 1999 Forwards LER 99-004-00,re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitment Made by Util,Listed ML17325B4721999-03-18018 March 1999 Forwards LER 99-005-00,re Reactor Trip Breaker Manual Actuations During Rod Drop Testing Not Previously Reported. Listed Commitments Identified in Submittal ML17325B4641999-03-17017 March 1999 Withdraws Response to Issue 1 of NRC Cal,Dtd 970919. Comprehensive Design Review Effort in Progress to Validate Resolution of Issue for Future Operation 1999-09-30
[Table view] |
Text
CATEGORY 1 REGULAT Y INFORMATION DISTRIBUTIOh SYSTEM (RIDS)ACCESSION NBR:9905190246 DOC.DATE: 99/05/12 NOTARIZED:
NO DOCKET¹FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH.NAME AUTHOR AFFILIATION
.BAKKEN,A.C.
Indiana Michigan Power Co.RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
SUBJECT:
Forwards DC Cook Nuclear Plant fitness for duty program performance datd for six-month period of 980701-1231, IAW 10CFR26.71(d).Info was delayed due administrative error in Regulatory Affairs Dept.T DISTRIBUTION CODE: A021D COPIES RECEIVED:LTR ENCL SIZE: TITLE: "Semiannual Fitness for Duty Program Performance Rept/Data" 10CFR26.7 E NOTES: RECIPIENT ID CODE/NAME LPD3-1 PD INTERN'CE ER 01 NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME STANG, J NRR/DIPM/IOLB RGN3 NRC PDR~COPIES LTTR ENCL 1 1 1 1 1,1 1 1 D'E NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR, REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL 8 indiana Michigan~~'ower Company 500 Circle Drive Buchanan, Ml 491071373 I ENQMMA SIICHIGAN PWM May 12, 1999 AEP:NRC:11030 10 CFR 26.71(d)Docket Nos: 50-315 50-316 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop 0-Pl-17 Washington, DC 20555-0001 Donald C.Cook Nuclear Plant Units 1 and 2 10 CFR Part 26, FITNESS FOR DUTY PROGRAM Gentlemen, In accordance with 10 CFR 26.71(d), Fitness For Duty Program, this submittal represents the Cook Nuclear Plant fitness for duty (FFD)program performance data for the six-month period from July 1, 1998, to December 31, 1998.Attached are performance data sheets that include statistics on the various categories of testing, substances for which testing is conducted and a summary of management actions.Transmittal of this submittal was delayed due to an administrative error in the Regulatory Affairs Department.
This condition has been entered into our corrective action program to ensure timely resolution.
Appropriate individual accountability will take place in accordance with AEP policies.Sincerely, A.C.Bakken, III Site Vice President Attachments c'.Dyer, w/attachments MDEQ-DW&RPD NRC Resident Inspector, w/attachments R.Whale w/attachments 9905i90246 99'0512 PDR'ADQCK 05000$15 R" PDR ATTACHMENT TO AEP:NRC:11030 DONALD C.COOK NUCLEAR PLANT UNITS 1 AND 2 10 CFR PART 26 FITNESS FOR DUTY PROGRAM Attachment 1 to AEP:NRC:11030 TESTING CATEGORIES AND SUBSTANCES Page 1 The following is offered as an explanation for information outlined in the performance data report regarding the various categories of testing and the substances for which testing is conducted:
Long term contractor personnel-plant protection contractors Short term contractor personnel-all contractor personnel other than plant protection Marijuana confirmed positives noted on page two of the performance data report are reported as:~one long-term, and one short-term contractor personnel positive at the DHHS/NRC cut-off level (100 NG),~seven positives"for short term contractor personnel at Cook Nuclear Plant's more conservative cut-off level (50 NG), and~four short-term contractor personnel were positive for marijuana at Cook Nuclear Plant's suspect level (20 NG).Of the total positive tests reported, eighteen were the result of pre-access applicant testing (seventeen with positive results and one deemed positive based on the individual's refusal to provide a specimen for testing).These results were di.stributed as follows:~three were the result of"for cause" tests,~three were the result of random tests, and~six were based on"follow-up tests" (five positive results and one deemed positive based on the individual's refusal'o provide a specimen for testing).A total of thirty-one tests were reported as positive on the"Breakdown of Confirmed Positive Tests for Specific Substances".
This number reflects one of the reported test results being positive for more than one substance.
Attachment 1 to AEP:NRC:11030 Page 2 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR26 Indiana Michigan Power Co.Company Cook Nuclear Plant, Bridgman, Michigan Location K.E.Burkett Contact Name 12/31/98 6 Month Ending (616)466-3335 Phone Cutoffs: Screen/Confirmation (ng/ml)CI Appendix A to 10CFR26 Cocaine 300/150 0 plates 300/300 Phencyclidine 25/25 Alcohol (%BAC)0.04%Marijuana 50/15 Amphetamine 1000/500 N/A N/A N/A NIA N/A N/A Testing Results Licensee Employees Long-Term Contractor Personnel Short-Term Contractor Personnel Average Number with Unescorted Access P Categories 1159¹Tested¹Positive 121¹Tested¹Positive 894 Tested¹Positive Pre-Access 43 31 110'5 For-Cause Post Accident For-Cause Observed Behavior Random 35 Follow-Up 18 82 Other 17 Total 423 68 1452 24 Attachment 1 to AEP:NRC:11030 Page 3 BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES Licensee Employee Marijuana Cocaine 50 j100 0 0 0 Opiates phetamines Phencycjidene 0 Alcohol Refusal Marijuana To Test Suspect Specimen Long-Term Contractors 0 1 0 Short-Term Contractors 7 1 1 10 Total 7 2 1 14 Total Confirmed Positive Tests For All Specific Substances and Refusats to Test 31-Attachment 1 to AEP:NRC:11030 MANAGEMENT ACTIONS: Page 4 Meetings are conducted with laboratory, collection site, Medical Review Officer(s), Employee Assistance Program staff, and psychological assessment personnel to assure consistent and effective implementation of the FFD program.The high number of Pre-access positive results was due to the Cook Plant's"suspect specimen" process, in addition to the large number of contractor personnel in-processing.
Specimens collected and deemed"suspect specimens" are tested at a lower cut-off level.Observed behavior in the collection facility, specimen temperature out of range, and collection site specific gravity test results out of range are some of the reasons to believe a particular individual may have altered or substituted a urine specimen.A second specimen is obtained under direct observation, as applicable, and both specimens are tested at the"suspect specimen" cut-off level.Actions and sanctions taken as a result of positive test results are performed in accordance with Fitness For Duty Regulatory Requirements.
The Canine program continues to be a constant reminder to Plant personnel of Cook Plan's determination to maintain a drug free work environment.
The Canine Unit provides anti-drug presentations to local schools and other community organizations in addition to regular tours of Cook Plant property.The Canine Unit also assists Local Law Enforcement agencies, upon request.APPEALS: Three appeals were received during this reporting period.The appeals for these individuals were denied based on failure to provide sufficient mitigating circumstances or evidence showing why the denial determination was incorrect'VENTS:
There were no events identified as reportable in accordance with 10CFR 26.73 during this reporting period.TEMPORARY SUSPENSIONS:
No temporary suspensions or administrative actions were taken against individuals based on on-site presumptive positive drug results.We continue to perform annual random testing of a rate equal to or exceeding 50 percent of the total population.
NAY-12-1999 11: 38 AEP I El'ACI llUIllgllllf 500 Circle Drive Buchanan, MI 4910~3 1 616 466 2985 P.82/'87 INPIANA NICHISAN POWER May 12, l999 Docket Nos: 50-315 50-316 AEPrNRC:11030 10 CFR 26.71 (d)U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop 0-P1-17 Washington, DC 20555-0001 Donald C.Cook Nuclear Plant Units 1 and 2 10 CFR Part 26, FITNESS FOR DUTY PROGRAM Gentlemen, In accordance with 10 CFR 26.71(d), Fitness For Duty Program, this submittal represents the Cook Nuclear Plant fitness for duty (FFD)program performance data for the six-month period from July 1, 1998, to December 31, 1998.Attached are performance data sheets that include statistics on the various categories of testing, substances for which testing is conducted and a summary of management actions.Transmittal of this submittal was delayed due to an administrative error in the Regulatory Affairs Department.
This condition has been entered into our corrective action program to ensure timely resolution.
Appropriate individual accountability will take place in accordance with AEP policies.Sincerely, A.C.Bakken, III Site Vice President/gpa Attachments c: J.E.Dyer, w/attachments MDEQ-DW&RPD NRC Resident Inspector, w/attachments R.Whale w/attachments NAY-12-1999 11: 38 1 616 466 2985 P.83/87 ATTACHMENT TO AEP;NRC:11030 DONALD C.COOK NUCLEAR PLANT UNITS 1 AND 2 10 CE'R PART 26 FITNESS FOR DUTY PROGRAM MAY-12-1999 11 38 1 616 466 298S P.84/87 Attachment 1 to AEP:NRC:ll030 TESTING CATEGORXES AND SOBSTANCES Page l The following is offered as an explanation for information outlined in the performance data report regarding the various categories of testing and the substances for which testing is conducted:
Long term contractor personnel-plant protection contractors Short term contractor personnel-all contxactor personnel other than plant protection Marijuana confirmed positives noted on page two of the performance data report are reported as:~one long-term, and one short-term contractor personnel positive at the DHHS/NRC cut-off level (100 NG),~seven positives for shox't term contractor personnel at Cook Nuclear Plant'more conservative cut-of f level (50 NG), and four short-term contractor personnel were positive for marijuana at Cook Nuclear Plant's suspect level (20 NG).Of the total positive tests reported, eighreen were the result of pre-access applicant testing (seventeen with positive results and one deemed positive based on the'individual's refusal to provide a specimen for testing).These results were distributed as follows:~three were the result of"for cause" tests,~three were the result of random tests, and~six were based on"follow-up tests" (five positive results and one deemed positive based on the individual' refusal to provide a specimen for testing).A total of thirty-one tests were reported as positive on the"Breakdown of Confirmed Positive Tests for Specific Substances".
This numbex'eflects one of the xeported test results being positive fox more than one substance.
NAY-12-1999 11 t 38 1 616 466 2985 P.85i87 Attachment.
1 to REP:ttRC111030 Page 2 FlTNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUB JECT TO 10CFR26 Indiana Michigan Power Co.Company Cook Nuclear Plant, BrMgman, Mlchlgan Location K.E Burkett Contact Nemo 12/31/98 6 Month Ending (616)466-3335 Phone Cutof/s: Screen/Confirmation (ng/mi)IR Appendbc A to 10CFR26 Mariana 50/15 Cocaine 300/150 Opiates 300/300 Amph etamlno 1000/500 Phoncydidine 25/25 A~at(V.BAC>
0.04'/A N/A N/A N/A N/A N/A Tosting Results LJconsoa Employees l.ong-Term Contractor Personnel Short-Term Contractor Personnel Avorago Number with Unescorted Accoas 1159 121 Categories Pre+ccess Tested Posltlve Tested Positive 31 ts Tested 110?Positive 15 For-Cause Post Accident For<ause Observed Behavior Random FoltowCJp 35 0 0 82 Total 423 1452 24
MAY-12-1999 11r 38 AEP 1 616 466 2985 P 86i87 Attachment 1 to AEP:NRC:11030 Page 3 BREAKDOWN OF CONFIRIIEO POSITIVE TESTS FOR SPECIFIC SUBSTANCES Ucensoe Employee Manjuana 50)100 Cocaine Optates hetsmines Phencycfidene Alcohol Refusat Marijuana Specimen Long-Tenn Contractors 0 Short-Term Contractors 7 10 Total 34 Total Confirmed Posltfve Tests For All Specific Substances snd Refusals to Tost'1 f%Y-12-1999 11: 38 AEP 1 616 466 2985 P.87r87 Attachment 1 to AEP:NRC:11030 MANAGEMENT ACTIONS: Page 4 Meetings axe conducted with laboratory, collection site, Medical Review Officer(s), Employee Assistance Program staff, and psychological assessment personnel to assure consistent and effective implementation of the FFD pxogram.The high number of Pre-access positive results was due to the Cook Plant's"suspect specimen" pxocess, in addition to the large number of contractor personnel in-processing.
Specimens collected and deemed"suspect specimens" axe tested at a lower cut-off level.Observed behaviox in the collection facility, specimen temperature out of range, and collection site specific gravity test results out of range are some of the zeasons to believe a particular individual may have altered or substituted a urine specimen.A second specimen is obtained under direct observation, as applicable, and both specimenp are tested az the"suspect specimen" cut-off level.Actions and sanctions taken as a result of positive test results are performed in accordance with Fitness For Duty Regulatory Requirements.
The Canine program continues to be a constant reminder to Plant personnel of Cook Plan's derermination to maintain a drug free work environment.
The Canine Unit provides anti-drug presentations to local schools and other community organizations in addition to regulax tours of Cook Plant property.The Canine Unit also assists Local Law Enforcement agencies, upon request.APPEALS: Three appeals were received during this repox'ting period.The appeals for these individuals wexe denied based on failure to provide sufficient mitigating ci.rcumstances or evidence sho~ing why the denial determination was incorrect.
EVENTS: There were no events identified as reportable in accordance with lOCFR 26.73 duzing this reporting period.TEMPORARY SUSPENSIONS:
No temporazy suspen ions or administrative actions were taken against individuals based on on-site presumptive positive drug results.We continue to perform annual random testing of a rate equal to or exceeding 50 percent of the total population.
TOTAL P.87