ML14290A326

From kanterella
Revision as of 04:53, 28 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
301 Final Sim in Plant JPMs
ML14290A326
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/27/2014
From:
Division of Reactor Safety II
To:
Duke Energy Corp
Shared Package
ML14290A363 List:
References
50-413/14-301, 50-414/14-301
Download: ML14290A326 (122)


Text

Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam PAGE 1 OF 14 System JPM A Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam PAGE 2 OF 14 EVALUATION SHEET Task: Respond to an inadvertent dilution while shutdown per AP/1/A/5500/013 (Boron Dilution), Case II (Boron Dilution While Shutdown) Alternate Path: Yes Facility JPM #: New Safety Function: 1 Title: Chemical and Volume Control System K/A 004 A2.06 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS: and based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Inadvertent boration/dilution Rating(s): 4.2 / 4.3 CFR: 41.5 / 43/5 / 45/3 / 45/5 Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant Perform X Simulate

References:

AP/1/A/5500/013 (Boron Dilution) rev. 24 Task Standard: Starts the 1A NI (Safety Injection) pump. Validation Time: 15 minutes Time Critical: Yes No X =========================================================================== Applicant: Time Start: __________ NAME___________________________ Docket #_______________ Time Finish: __________ Performance Rating: SAT ____ UNSAT ____ Performance Time _____ Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam PAGE 3 OF 14 SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC #168. 3. Enter the password. 4. the INITIAL CONDITION RESET pop-up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event LOA-NI004 (RACKOUT NI PMP 1B) RACKOUT LOA-NV067 (RACKOUT NV PMP 1B) RACKOUT LOA-NV066 (RACKOUT NV PMP 1A) RACKOUT 2 Ensure EVENT 2 = x10i167c (NV-353 pushbutton)

PAGE 4 0F 14 Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam PAGE 4 OF 14 READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is in MODE 5 Unit 1 RMWST is aligned for VCT makeup. INITIATING CUES: A boron dilution event is in progress, you have been instructed to perform AP/1/A/5500013 (Boron Dilution), Case II (Boron Dilution While Shutdown). EXAMINER NOTE: After reading cue, provide the applicant with a copy of AP/1/A/5500/013 Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 14 START TIME: _______ STEP 1: 1. Verify boron dilution event - IN PROGRESS. STANDARD: Applicant determines a boron dilution event is in progress per the initiating cue. COMMENTS: ___ SAT ___ UNSAT STEP 2 Verify Reactor Trip: All rod bottom lights - LIT All reactor trip and bypass breakers - OPEN. STANDARD: Applicant verifies the reactor is tripped by verifying all rod bottom lights are lit on the DRPI monitors and that the green OPEN lights are lit for RX TRIP BKR 1A and RX TRIP BKR 1B on 1MC-1. COMMENTS: ___ SAT ___UNSAT Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 14 STEP 3 3. Verify core alterations - IN PROGRESS. STANDARD: Applicant verifies that core alterations are NOT because the unit is in MODE 5 and proceeds to the RNO. COMMENTS: ___ SAT ___ UNSAT STEP 4 3. RNO GO TO Step 5. STANDARD: Applicant proceeds to step 5 COMMENTS: ___ SAT ___ UNSAT STEP 5 5. Evacuate personnel from reactor building using the following: Containment evacuation alarm Plant page. STANDARD: Applicant depresses the red ON pushbutton for the UNIT 1 CONT EVAC ALARM on 1MC-1 and makes a plant page. This step is critical to perform either action to protect the health and safety of the people working inside containment. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 14 STEP 6 6. Stop any dilutions in progress as follows: a. Place "NC MAKEUP CONTROL" switch to "STOP". STANDARD: Applicant 1MC-10. COMMENTS: ___ SAT ___ UNSAT STEP 7 6. b. Verify Unit 1 RMWST aligned for VCT makeup. STANDARD: Applicant verifies the Unit 1 RMWST is aligned per the initial conditions. COMMENTS: ___ SAT ___ UNSAT STEP 8 6. c. Place both reactor makeup water pumps to "OFF". STANDARD: Applicant places RX M/U WTR PUMP 1A and RX M/U WTR PUMP 1B on 1MC-10. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 14 STEP 9 6. d. Isolate the NV demineralizers as follows: 1) Place 1NV-153A (Letdn Hx Otlt 3-Way Valve) in the "VCT" position. STANDARD: Applicant places 1NV- on 1MC-10. This step is critical to prevent un-saturating the Mixed Bed Demineralizers. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT STEP 10 6. d. 2) Ensure the following valves - CLOSED: 1NV-353 & 364 (Mixed Bed Demin 1A Isol) 1NV-368 & 379 (Mixed Bed Demin 1B Isol). STANDARD: Applicant depresses the green CLOSE pushbutton for NV-353 & 364 MIXED BED DEMIN 1A ISOL and verifies the green CLSD light is lit for NV-368 & 379 MIXED BED DEMIN 1A ISOL on 1MC-10. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 14 NOTE Unit shutdown alignments may have established alternate boration flowpaths. STEP 11 7. Ensure proper BDMS operation as follows: a. Verify at least one of the following alarm(s) - LIT: 1AD-2, E/2 "TRAIN A SHUTDOWN MARGIN ALARM" OR 1AD-2, F/2 "TRAIN B SHUTDOWN MARGIN ALARM". STANDARD: Applicant verifies at least one of the alarms is lit. COMMENTS: ___ SAT ___ UNSAT STEP 12 7. b. Ensure the following valves - OPEN: 1NV-252A (NV Pumps Suct From FWST) 1NV-253B (NV Pumps Suct From FWST). STANDARD: Applicant verifies the red OPEN lights are lit for 1NV-252A and 1NV-253B on 1MC-10. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 14 STEP 13 7. c. Ensure the following valves - CLOSED: 1NV-188A (VCT Otlt Isol) 1NV-189B (VCT Otlt Isol). STANDARD: Applicant verifies that the green CLSD lights are lit for 1NV-188A and 1NV-189B on 1MC-10. COMMENTS: ___ SAT ___ UNSAT STEP 14 7. d. Verify NV pump - ON. STANDARD: Applicant determines that no NV pumps are on and proceeds to the RNO. COMMENTS: ___ SAT ___ UNSAT STEP 15 7. d. RNO d. Perform the following: 1) IF NV pump 1A AND 1B boration flowpath NOT available, THEN GO TO Enclosure 1 (NI or ND Pump Boron Injection Alignment). STANDARD: Applicant proceeds to Enclosure 1. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 14 Enclosure 1 STEP 16 1. Align NC system boration flowpath as follows: a. IF establishing NC system boration, THEN GO TO Step 2. STANDARD: Applicant proceeds to step 2. COMMENTS: ___ SAT ___ UNSAT STEP 17 2. Initiate NC system boration flow as required using at least one of the following boration flowpaths. IF NI Pump 1A aligned to provide boron injection flowpath, THEN perform the following to establish NI Pump 1A injection flow: a. Ensure 1NI-118A (NI Pump 1A C-Leg Inj Isol) - OPEN. STANDARD: Applicant verifies that the red OPEN light is lit for 1NI-118A on 1MC-11 COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 14 STEP 18 b. START NI Pump 1A. STANDARD: Applicant depresses the red ON pushbutton for NI PMP 1A. This step is critical to initiate NC system boration flow. NOTE TO EXAMINER: No other flow paths will be aligned. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT STEP 19 3. WHEN NC system boration no longer required, THEN perform Step 5. STANDARD: Applicant acknowledges step. COMMENTS: ___ SAT ___ UNSAT STEP 20 4. GO TO Case II (Boron Dilution While Shutdown), Step 9. STANDARD: Applicant proceeds to Case II, Step 9. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 14 NOTE A time delay of up to 3-5 minutes can be expected before indication of negative reactivity insertion is obtained on excore instrumentation. STEP 21 9. Verify neutron flux level - STABLE OR DECREASING. STANDARD: Applicant reads the step. Examiner Cue: COMMENTS: END OF TASK ___ SAT ___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM A READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is in MODE 5 Unit 1 RMWST is aligned for VCT makeup. INITIATING CUES: A boron dilution event is in progress, you have been instructed to perform AP/1/A/5500013 (Boron Dilution), Case II (Boron Dilution While Shutdown).

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam PAGE 1 OF 15 JPM B Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam PAGE 2 OF 15 EVALUATION SHEET Task: Transfer the Emergency Core Coolant System to the Cold Leg Recirculation Alternate Path: Yes Facility JPM #: NI-088 Safety Function: 2 Title: Emergency Core Cooling System (ECCS) K/A 006 A4.07 Ability to manually operate and/or monitor in the control room: ECCS pumps and valves. Rating(s): 4.4 / 4.4 CFR: 41.7 / 45.5 to 45.8 Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant Perform X Simulate

References:

EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) Task Standard: EP/1/A/5000/ES-1.3 Transfer to Cold Leg Recirculation) step 6 is performed and the 1A and 1B NV (Chemical Volume and Control System) and NI (Safety Injection System) pumps are secured. Validation Time: 15 minutes Time Critical: Yes No X =========================================================================== Applicant: Time Start: __________ NAME___________________________ Docket #_______________ Time Finish: __________ Performance Rating: SAT ____ UNSAT ____ Performance Time _____ Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam PAGE 3 OF 15 SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC #169 3. Enter the password. 4. the INITIAL CONDITION RESET pop-up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event VLV-NI037F (NI184B CNMT SUMP LINE 1B ISOL (STEM) FAIL TO POSITION) 0 MAL-NC013A (NC COLD LEG A LEAK) 27.5 VLV-ND005F (ND28A ND HX A OUTLET TO CHARG AB FAIL TO POSITION. 0 PAGE 4 0F 15 Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam PAGE 4 OF 15 READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: A LOCA has occurred on Unit 1. INITIATING CUES: 1AD--annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6. EXAMINER NOTE: After reading the cue, provide the applicant with a copy of EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) complete through step 8 with step 6 flagged.

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 15 START TIME: _______ STEP 1: 6. WHEN FWST level decreases to 5% (1AD-9, E/8 "FWST LO-LO LEVEL"), THEN align NV and NI Systems for recirc as follows: a. Ensure Enclosure 1 (Foldout Page) is monitored. STANDARD: Applicant reads the step. Examiner Cue: The OATC will monitor Enclosure 1 COMMENTS: ___ SAT ___ UNSAT NOTE CSF should not be implemented until directed by this procedure. STEP 2 b. Verify at least one of the following annunciators - LIT: 1AD-20, B/2 "CONT. SUMP LEVEL >2.5 ft" OR 1AD-21, B/2 "CONT. SUMP LEVEL >2.5 ft". STANDARD: Applicant determines that one or both annunciators are lit. COMMENTS: ___ SAT ___UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 15 STEP 3 c. Verify both ND pumps - ON. STANDARD: Applicant determines that only 1 ND pump is running and transitions to the RNO COMMENTS: ___ SAT ___ UNSAT STEP 4 6.c. RNO c. Perform the following: 1) IF 1NI-185A (ND Pump 1A Cont Sump Suct) is open, THEN start ND pump 1A. STANDARD: Applicant determines that ND PUMP 1A is on by verifying the red ON light is lit on 1MC-11. COMMENTS: ___ SAT ___ UNSAT STEP 5 2) IF 1NI-184B (ND Pump 1B Cont Sump Suct) is open, THEN start ND pump 1B. STANDARD: Applicant determines that 1NI-184B is not open by verifying the green CLSD light is lit on 1MC-11 and determines that the step is not applicable. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 15 STEP 6 3) IF any ND pump running with suction aligned to sump, THEN GO TO Step 6.d. STANDARD: Applicant determines that ND Pump 1A is running with suction aligned to the sump and proceeds to step 6.d. COMMENTS: ___ SAT ___ UNSAT STEP 7 6. d. Ensure the following valves - CLOSED: 1ND-32A (ND Train 1A Hot Leg Inj Isol) 1ND-65B (ND Train 1B Hot Leg Inj Isol). STANDARD: Applicant depresses the green CLOSE pushbuttons for 1ND-32A and 1ND-65B on 1MC-11. This step is critical to prevent pump run out should only one ND pump be running. Examiner NOTE: Only one of the valves need to be closed to satisfy the critical step since the valves are in series. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 15 STEP 8 6. e. Isolate NI Pump Miniflow as follows: 1) Verify NC pressure - LESS THAN 1620 PSIG. STANDARD: Applicant determines that NC (Reactor Coolant System) pressure is less than 1620 psig. COMMENTS: ___ SAT ___ UNSAT STEP 9 2) Ensure the following valves - CLOSED: 1NI-115A (NI Pump 1A Miniflow Isol) 1NI-144A (NI Pump 1B Miniflow Isol). STANDARD: Applicant determines that the green CLSD lights are lit for 1NI-115A and 1NI-144A on 1MC-11. COMMENTS: ___ SAT ___ UNSAT STEP 10 3) Ensure "PWR DISCON FOR 1NI-147B" switch in "ENABLE". STANDARD: Applicant - on 1MC-11. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 15 STEP 11 4) Ensure 1NI-147B (NI Miniflow Hdr To FWST Isol) - CLOSED. STANDARD: Applicant determines that the green CLSD light is lit for 1NI-147B on 1MC-11. COMMENTS: ___ SAT ___ UNSAT STEP 12 6. f. Verify at least one of the following NV pumps miniflow valves - CLOSED: 1NV-203A (NV Pumps A&B Recirc Isol) OR 1NV-202B (NV Pmps A&B Recirc Isol). STANDARD: Applicant determines that the green CLSD lights is lit for 1NV-203A or 1NV-202B on 1MC-10. COMMENTS: ___ SAT ___ UNSAT STEP 13 g. Ensure 1NI-334B (NI Pump Suct X-Over From ND) - OPEN. STANDARD: Applicant determines the red OPEN light is lit for 1NI-334B on 1MC-11. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 15 STEP 14 h. OPEN the following valves: 1NI-332A (NI Pump Suct X-Over From ND) 1NI-333B (NI Pump Suct From ND). STANDARD: Applicant depresses the red OPEN pushbuttons for 1NI-332A and 1NI-333B on 1MC-11. COMMENTS: ___ SAT ___ UNSAT STEP 15 i. Align ND discharge to suction of NI and NV pumps as follows: 1) OPEN 1ND-28A (ND Supply To NV & 1A NI Pmps). STANDARD: Applicant depresses the red OPEN pushbutton for 1ND-28A on 1MC-11 and determines that the valve will not open and continues. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 15 STEP 16 2) OPEN 1NI-136B (ND Supply To NI Pump 1B). STANDARD: Applicant depresses the red OPEN pushbutton for 1NI-136B on 1MC-11, determines that the valve will not open and proceeds to the next step. Examiner NOTE: 1NI-136B will not open due to an interlock with 1NI-184B COMMENTS: ___ SAT ___ UNSAT STEP 17 j. Verify at least one ND train aligned to provide suction to NV and NI as follows: A Train: 1A ND pump running 1ND-28A (ND Supply To NV & 1A NI Pmps) - OPEN. STANDARD: Applicant determines no train can be aligned to provide suction to NV and NI and proceeds to the RNO. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 15 STEP 18 6.j. RNO j. Perform the following: 1) IF either valve is in intermediate position, THEN allow 20 seconds for valve to open. STANDARD: Applicant determines that this step does not apply. COMMENTS: ___ SAT ___ UNSAT STEP 19 2) IF either valve is open AND its associated ND pump on, THEN GO TO Step 6.k. STANDARD: Applicant determines that this step does not apply. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 15 STEP 20 3) IF both A train and B train unavailable, THEN trip all NV and NI pumps. STANDARD: Applicant determines both A train and B train are unavailable and depresses the green OFF pushbuttons for NV PMP 1A, NV PUMP 1B, NI PMP 1A and NI PUMP 1A. This step is critical to protect the NV and NI pumps from damage from loss of suction and allow them to be available later when the FWST has been refilled. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT STEP 21 k. Isolate FWST from NV and NI pumps as follows: 1) Place "PWR DISCON FOR 1NI-100B" switch in "ENABLE". STANDARD: Applicant -ENABLE position. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 14 0F 15 STEP 22 2) CLOSE 1NI-100B (NI Pmps Suct From FWST). STANDARD: Applicant depresses the green CLOSE pushbutton for 1NI-100B on 1MC-11. COMMENTS: ___ SAT ___ UNSAT STEP 23 3) CLOSE the following valves: 1NV-252A (NV Pumps Suct From FWST) 1NV-253B (NV Pumps Suct From FWST). STANDARD: Applicant depresses the green CLOSE pushbuttons for 1NV-252A and 1NV-253B on 1MC-10. COMMENTS: END OF TASK ___ SAT ___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) May 2014 NRC Initial License Exam JPM B READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: A LOCA has occurred on Unit 1. INITIATING CUES: 1AD-- annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6.

Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam PAGE 1 OF 9 System JPM C Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam PAGE 2 OF 9 EVALUATION SHEET Task: Perform PT/1/A/4200/023B (NC PORV and Air Supply Stroke Test), Enclosure 13.4 (NC PORV Cycle) Alternate Path: No Facility JPM #: New Safety Function: 3 Title: Pressurizer Pressure Control K/A 010 A4.03 Ability to manually operate and/or monitor in the control room: PORV and block valves Rating(s): 4.0 / 3.8 CFR: 41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant Perform X Simulate

References:

PT/1/A/4200/023B (NC PORV and Air Supply Stroke Test), Enclosure 13.4 (NC PORV Cycle) rev. 017 Task Standard: Enclosure 13.4 successfully completed for 1NC-32B (PZR PORV) and the associated valves are returned to the as found position. Validation Time: 7 minutes Time Critical: Yes No X =========================================================================== Applicant: Time Start: __________ NAME___________________________ Docket #_______________ Time Finish: __________ Performance Rating: SAT ____ UNSAT ____ Performance Time _____ Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam PAGE 3 OF 9 SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC #170 3. Enter the password. 4. INITIAL CONDITION RESET pop-up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event PAGE 4 0F 9 Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam PAGE 4 OF 9 READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is in MODE 3. INITIATING CUES: The Control Room Supervisor instructs you to perform PT/1/A/4200/023B, Enclosure 13.4 for 1NC-32B. EXAMINER NOTE: After reading cue, provide the applicant with a copy of PT/1/A/4200/023B, Enclosure 13.4.

Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 9 START TIME: _______ STEP 1: 1.1 IF testing 1NC-32B (Pzr PORV), perform the following: 1.1.1 Record the as found position of 1NC-31B (Pzr PORV Isol) below: ______________ STANDARD: Applicant records OPEN as the as found position. COMMENTS: ___ SAT ___ UNSAT STEP 2 1.1.2 Ensure 1NC-31B (Pzr PORV Isol) is closed. STANDARD: Applicant places the switch for 1NC-31B to the CLOSE or OVERRIDE position. This step is critical to prevent a pressure transient when 1NC-32B is opened. COMMENTS: CRITICAL STEP ___ SAT ___UNSAT Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 9 STEP 3 1.1.3 Record the as found position of 1NC-32B (Pzr PORV) below: ______________ STANDARD: Applicant records CLOSED as the as found position for 1NC-32B COMMENTS: ___ SAT ___ UNSAT STEP 4 1.1.4 Circle below the as found switch position of 1NC-32B (Pzr PORV). Close Open Auto STANDARD: Applicant circles Auto as the as found switch position of 1NC-32B. COMMENTS: ___ SAT ___ UNSAT STEP 5 1.1.5 Ensure 1NC-32B (Pzr PORV) is closed. STANDARD: Applicant determines that 1NC-32B is closed. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 9 STEP 6 1.1.6 Cycle 1NC-32B (Pzr PORV) from closed to open to closed from the control room. STANDARD: Applicant places the switch for 1NC-32B to the OPEN position and then to the AUTO or CLOSE position. This step is critical to cycle 1NC-32B. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT STEP 7 1.1.7 Return 1NC-32B (Pzr PORV) to the as found position, as recorded in Step 1.1.3 of this enclosure. STANDARD: Applicant determines that 1NC-32B is in the as found position as recorded in step 1.1.3. COMMENTS: ___ SAT ___ UNSAT STEP 8 1.1.8 Return switch for 1NC-32B (Pzr PORV) to the as found position, as recorded in Step 1.1.4 of this enclosure. STANDARD: Applicant places the switch for 1NC-32B to the AUTO position. This step is critical to return the switch for 1NC-32B to the as found position. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 9 STEP 9 1.1.9 Return 1NC-31B (Pzr PORV Isol) to the as found position, as recorded in Step 1.1.1 of this enclosure. STANDARD: Applicant places the switch for 1NC-31B to the OPEN position. This step is critical to return 1NC-31B to the as found position and make 1NC-32B available for pressure relief. COMMENTS: END OF TASK CRITICAL STEP ___ SAT ___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM C READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is in MODE 3. INITIATING CUES: The Control Room Supervisor instructs you to perform PT/1/A/4200/023B, Enclosure 13.4 for 1NC-32B.

Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam PAGE 1 OF 8 System JPM D Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam PAGE 2 OF 8 EVALUATION SHEET Task: Start Reactor Coolant Pump 1B Alternate Path: Yes Facility JPM #: NCP081 (modified) Safety Function: 4P Title: Reactor Coolant Pump System K/A 003 A1.01 Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the RCPS control including: RCP vibration. Rating(s): 2.9 / 2.9 CFR: 41.5 / 45.5 Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant Perform X Simulate

References:

OP/1/A/6150/002A (Reactor Coolant Pump) rev. 068 Task Standard: 1B Reactor Coolant Pump is tripped when vibration is noted to be greater than NC pump trip criteria. Validation Time: 20 minutes Time Critical: Yes No X =========================================================================== Applicant: Time Start: __________ NAME___________________________ Docket #_______________ Time Finish: __________ Performance Rating: SAT ____ UNSAT ____ Performance Time _____ Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam PAGE 3 OF 8 1. Reset to any 100% power IC set. 2. Manually trip the reactor at 1MC-1. 3. Trip all (4) four NCP breakers at 1MC-10. 4. Place CF pump in service for auto S/G level control and secure CA. 5. Insert MAL-NCP005FXB (NCP VIB B MOUNT HORIZ FAILURE) Initial =0 Ramp =240 Value=10, EVENT =1, Delay = 5 6. Insert MAL-NCP005FYB (NCP VIB B MOUNT VERT FAILURE) Initial =0 Ramp =240 Value=10, EVENT =1, Delay = 5 7. Insert MAL-NCP005SXB (NCP VIB B MOUNT HORIZ FAILURE) Initial =0 Ramp =120 Value=30, EVENT =1, Delay = 5 8. Insert MAL-NCP005SYB (NCP VIB B MOUNT VERT FAILURE) Initial =0Ramp =120 Value=30, EVENT =1, Delay = 5 9. Insert EVENT 1 = x10d185M >400 (NCP B AMPS>400) 10. Freeze simulator and write to a snap. IC SELECTED: SIMULATOR OPERATOR INSTRUCTIONS: ENSURE BENTLEY NEVADA VIBRATION MONITORS ON BACK BOARD ARE RESET AND THAT ALARMS 1AD-6 A/5 AND B/5 ARE CLEARED BETWEEN STUDENTS.

Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam PAGE 4 OF 8 SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC #171 3. Enter the password. 4. -up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event MAL-NCP005FXB (NCP VIB 1B MOUNT HORZ FAILURE) 10 5 4 MIN 1 MAL-NCP005FYB (NCP VIB 1B MOUNT VERT FAILURE) 10 5 4 MIN 1 MAL-NCP005SXB (NCP VIB 1B SHAFT HORZ FAILURE) 30 5 2 MIN 1 MAL-NCP005SYB (NCP VIB 1B SHAFT VERT FAILURE) 30 5 2 MIN 1 Ensure EVENT 1 = x10d185m>400 (NCP B AMPS > 400)

PAGE 5 0F 8 Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam PAGE 5 OF 8 READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: EP/1/A/5000/ES-0.2, Natural Circulation Cooldown has been implemented following a Reactor Trip caused by a lightning strike in the switchyard. Normal power has been restored. INITIATING CUES: Start NC Pump 1B by completing OP/1/A/6150/002A, NC Pump Operation Enclosure 4.1 beginning at Step 3.14. EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6150/002A (Reactor Coolant Pump Operation), Enclosure 4.1 (Startup and Operation of the NC Pumps) signed off up to Step 3.14.

Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 8 START TIME: _______ STEP 1 3.14 Two minutes prior to starting NC pump, start one oil lift pump for NCP to be started by pressing the "ON" pushbutton for: "NC PUMP OIL LIFT PUMP B1" "NC PUMP OIL LIFT PUMP B2" STANDARD: Applicant depresses the red ON pushbutton for NC PMP OIL LIFT PMP B1 or B2 approximately two minutes prior to starting the 1B NC Pump. This step is critical to lift and lubricate the pump so that it can be started. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 8 NOTE: 1. If NC pump is NOT started, the oil lift pump shall be secured to minimize stress on oil nozzles. 2. The Degraded Bus Voltage Relays (27N) may actuate on the essential bus being supplied by the 6.9KV Switchgear associated with the NC Pump to be started in the following step. The alarm condition is expected to clear within 36 seconds.{PIP 95-0287} STEP 2 3.15 Start desired NC pump by pressing the "ON" pushbutton for: (R.M.) "NC PUMP 1B" STANDARD: Applicant depresses the red ON pushbutton for NC PMP 1B. Once Hi Hi vibration is verified, the pump should be tripped. This step is critical to start the 1B NC Pump and then trip the pump upon verification of Hi Hi Vibration to protect the pump from further damage. NOTE TO EXAMINER: Approximately 5 seconds after the NCP is started, the Hi Hi Vibration alarm will come in. The shaft vibration will reach 20 mils prior to reaching 5 on the mount. Per the annunciator response, the pump should be tripped at >20 mils in Modes 1 and 2, but not until >30 mils in Mode 3 (current condition). At 5 mils on the mount, the pump is tripped regardless of mode. 5 mils on the mount will occur before 30 mils on the shaft. EXAMINER CUE: AFTER the pump is tripped: AP/1/A/5500/004 (Loss of Reactor Coolant Pump) COMMENTS: END OF TASK CRITICAL STEP ___ SAT ___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM D READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: EP/1/A/5000/ES-0.2, Natural Circulation Cooldown has been implemented following a Reactor Trip caused by a lightning strike in the switchyard. Normal power has been restored. INITIATING CUES: Start NC Pump 1B by completing OP/1/A/6150/002A, NC Pump Operation Enclosure 4.1 beginning at Step 3.14.

Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam PAGE 1 OF 11 System JPM E Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam PAGE 2 OF 11 EVALUATION SHEET Task: Synchronize the Generator to the Grid Alternate Path: Yes Facility JPM #: NEW Safety Function: 4S Title: Main and Reheat Steam System (MRSS) K/A 045 A4.02 Ability to manually operate and/or monitor in the control room: T/G controls, including breakers Rating(s): 2.7 / 2.6 CFR: 41.7 / 45.5 to 45.8 Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant Perform X Simulate

References:

OP/1/B/6300/001 (Turbine Generator) rev. 099 Task Standard: Synchronizes the generator to the grid and pick up load. Validation Time: 15 minutes Time Critical: Yes No X =========================================================================== Applicant: Time Start: __________ NAME___________________________ Docket #_______________ Time Finish: __________ Performance Rating: SAT ____ UNSAT ____ Performance Time _____ Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam PAGE 3 OF 11 SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC #172 3. Enter the password. 4. Select -up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event OVR-EP006B (GEN BKR 1B TRIP ENABLE PB) ON 2 OVR-EP006C (GEN BKR 1B TRIP PB) ON 2 OVR-EP007B (GEN BKR 1A TRIP ENABLE PB) ON 4 OVR-EP007C (GEN BKR 1A TRIP PB) ON 4 Ensure EVENT 2 = x01i120a & !x01i148e Ensure EVENT 4 = x01i120b & !x01i147e PAGE 4 0F 11 Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam PAGE 4 OF 11 READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is in MODE 1 at 14% power. Turbine Generator startup is in progress per OP/1/B/6300/001 (Turbine Generator) Enclosure 4.1 (Turbine Generator Startup). INITIATING CUES: The CRS has instructed you synchronize the generator to the grid in auto and pick up load starting at Step 3.62. Peer Checks have been waived. EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/B/6300/001 (Turbine Generator) Enclosure 4.1 (Turbine Generator Startup).

Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 11 START TIME: _______ STEP 1: 3.62 Synchronize the Generator to the grid as follows: 3.62.1 Prior to placing the turbine generator on line, ensure Rx power is between 13% and 15% power. STANDARD: Applicant determines Rx power is approximately 14%. COMMENTS: ___ SAT ___ UNSAT STEP 2 3.62.2 Announce the following over the plant page: "Placing Unit 1 Main Turbine on line, please clear the Transformer Yard". STANDARD: Applicant makes an announcement using the beige phone on 1MC-1 COMMENTS: ___ SAT ___UNSAT Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 11 NOTE: If "MAN/AUTO REG" (1MC1) indicates "MAN", Manual sync of Generator is required. STEP 3 3.62.3 IF Auto sync of the Generator is desired, perform the following: 3.62.3.1 Verify "MAN/AUTO REG" in "AUTO" (1MC1). STANDARD: Applicant determines auto sync of the generator is desired per the initiating cue and determines that the AUTO light for MAN/AUTO REG is LIT COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 11 NOTE: 1. When "GEN SYNC SELECT" switch is turned to "AUTO 1A" or "AUTO 1B", the AVR Auto Sync Relay automatically adjusts Terminal voltage and Turbine speed and closes the selected breaker. 2. The following will occur when the Generator Breaker closes: 6-7 MWe is picked up. A Target of 60 MWe is automatically input. A Load Rate of 12 MW/MIN is automatically input. The MW feedback loop is placed in service. The turbine is placed in "HOLD". STEP 4 3.62.3.2 Turn "GEN SYNC SELECT" switch (1MC1) to "AUTO 1A" or "AUTO 1B" position. STANDARD: Applicant places the GEN SYNC SELECT switch to either the AUTO 1A or AUTO 1B position. EXAMINER NOTE: The first breaker selected will fail to close. COMMENTS: ___ SAT ___ UNSAT STEP 5 3.62.3.3 IF the selected Generator Breaker did NOT close, perform the following: A. Depress "Auto Sync Enable" on Turbine Control panel. STANDARD: Applicant Control Panel. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 11 STEP 6 B. IF selected Generator Breaker fails to close within 5 minutes, perform Steps 3.62.3.2 - 3.62.3.3 for opposite breaker. STANDARD: Applicant determines that the generator breaker failed to close and returns to step 3.62.3.2 for the opposite breaker. COMMENTS: ___ SAT ___ UNSAT STEP 7 3.62.3.2 Turn "GEN SYNC SELECT" switch (1MC1) to "AUTO 1A" or "AUTO 1B" position. STANDARD: Applicant places the GEN SYNC SELECT switch to the opposite position than was selected the first time. This step is critical to close a generator breaker and synchronize the generator grid. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT . STEP 8 3.62.3.3 IF the selected Generator Breaker did NOT close, perform the following: STANDARD: Applicant determines the step does not apply this time. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 11 STEP 9 3.62.3.4 Return "GEN SYNC SELECT" switch to the "MAN" position. STANDARD: Applicant places the GEN SYNC SELECT switch to the MAN position. COMMENTS: ___ SAT ___ UNSAT STEP 10 3.62.4 IF Manual sync of Generator is desired, perform the following: STANDARD: Applicant determines that this step does not apply. COMMENTS: ___ SAT ___ UNSAT STEP 11 3.62.5 After Generator Breaker 1A (or 1B) has closed, verify the following: 3.62.5.1 A Target of 60 MWe. 3.62.5.2 A Load Rate of 12 MW/Min. STANDARD: Applicant verifies a target of 60 MWe and a Load Rate of 12MW/Min is present on the Turbine Control Panel or the Turbine Graphic. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 11 STEP 12 3.62.6 Select "GO" to pick up load. STANDARD: Applicant This step is critical allow the turbine generator control system to throttle open the control valves to pick up load. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT STEP 13 3.62.7 WHILE continuing with the power increase, but before 50% power, place other Generator Breaker in service as follows: STANDARD: Applicant reads the step. EXAMINER CUE: COMMENTS: END OF TASK ___ SAT ___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM E READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is in MODE 1 at 14% power. Turbine Generator startup is in progress per OP/1/B/6300/001 (Turbine Generator) Enclosure 4.1 (Turbine Generator Startup). INITIATING CUES: The CRS has instructed you synchronize the generator to the grid in auto and pick up load starting at Step 3.62. Peer Checks have been waived.

Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam PAGE 1 OF 14 System JPM F Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam PAGE 2 OF 14 EVALUATION SHEET Task: Restoration of Offsite Power Alternate Path: No Facility JPM #: New Safety Function: 6 Title: A.C. Electrical Distribution K/A 062 A4.01 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard. Rating(s): 3.3 / 3.1 CFR: 41.7 / 45.5 to 45.8 Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant Perform X Simulate

References:

AP/1/A/5500/007 (Loss of Normal Power), Enclosure 4 (Restoration of Offsite Power) rev. 071 Task Standard: All 6.9 KV busses energized. Validation Time: 15 minutes Time Critical: Yes No X =========================================================================== Applicant: Time Start: __________ NAME___________________________ Docket #_______________ Time Finish: __________ Performance Rating: SAT ____ UNSAT ____ Performance Time _____ Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam PAGE 3 OF 14 SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC #173 3. Enter the password. 4. -up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event OVR-CM024A (HW PMP 1A SEL SW OFF LT) ON 1 OVR-CM024B (HW PMP 1A SEL SW ON LT) OFF 1 OVR-CM025A (HW PMP 1B SEL SW OFF LT) ON 20 SEC 1 OVR-CM025B (HW PMP 1B SEL SW ON LT) OFF 20 SEC 1 OVR-CM026A (HW PMP 1C SEL SW OFF LT) ON 1 MIN 1 OVR-CM026B (HW PMP 1C SEL SW ON LT) OFF 1 MIN 1 OVR-EP023B (PCB 15 TRIP TRIP PB) ON OVR-CM024A (HW PMP 1A SEL SW OFF LT) ON 1 SEC 4 OVR-CM024B (HW PMP 1A SEL SW ON LT) OFF 1SEC 4 OVR-CM025A (HW PMP 1B SEL SW OFF LT) ON 1SEC 6 OVR-CM025B (HW PMP 1B SEL SW ON LT) OFF 1SEC 6 OVR-CM026A (HW PMP 1C SEL SW OFF LT) ON 1SEC 8 OVR-CM026B (HW PMP 1C SEL SW ON LT) OFF 1SEC 8 Ensure EVENT 4 = x11o063r (7KV 1TA FDR FRM 1T2A CLSD Light) Ensure EVENT 6 = x11o147r (7KV 1TB FDR FRM 1T2A CLSD Light) Ensure EVENT 8 = x11o345r (7KV 1TD FDR FRM 1T1A CLSD Light)

PAGE 4 0F 14 Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam PAGE 4 OF 14 READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is recovering from a Loss of Offsite Power Event. The TCC has informed the Control Room that the electrical grid has remained energized and adequate switchyard voltage and grid reliability is available to re-energize 6.9 KV busses with motor breakers open. The status of all 6.9 KV bus lockout relays has been determined. Power restoration has been approved by station management. INITIATING CUES: The SRO instructs you restore offsite power to the 6.9 KV busses per AP/1/A/5500/007 (Loss of Normal Power), Enclosure 4 (Restoration of Offsite Power). EXAMINER NOTE: After reading cue, provide the applicant with a copy of AP/1/A/5500/007 (Loss of Normal Power), Enclosure 4 (Restoration of Offsite Power).

Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 14 START TIME: _______ STEP 1: 1. Verify both turbine generator breakers - OPEN. STANDARD: Applicant determines that the green OPEN lights are lit for GEN BKR 1B and GEN BKR 1A on 1MC-11, 1MC-1, or via the OAC. COMMENTS: ___ SAT ___ UNSAT NOTE If loss of grid has occurred, then it may take 6-8 hours to restore power to CNS switchyard. STEP 2 2. Verify with TCC - ELECTRICAL GRID HAS REMAINED ENERGIZED. STANDARD: Applicant determines that the electrical grid has remained energized per the initiating cue. BOOTH OPERATOR CUE: IF TCC is contacted, has remained COMMENTS: ___ SAT ___UNSAT Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 14 STEP 3 3. Verify switchyard - ENERGIZED. STANDARD: Applicant determines that the switchyard is energized via the OAC. COMMENTS: ___ SAT ___ UNSAT STEP 4 4. Ensure both main transformer's MODs - CLOSED. STANDARD: Applicant determines that red CLSD lights are lit for MOD 1A and MOD 1B on 1MC-11, or that the MODs are closed via the OAC COMMENTS: ___ SAT ___ UNSAT STEP 5 5. Verify with TCC that adequate switchyard voltage and grid reliability available to re-energize affected 6.9 KV busses with motor breakers open. STANDARD: Applicant determines that switchyard voltage and grid reliability is available per the initiating cue. BOOTH OPERATOR CUE: IF TCC is contacted, switchyard voltage and grid reliability is COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 14 STEP 6 6. Place switches for the following pumps in "OFF" position: All de-energized KR pumps All de-energized hotwell pumps All de-energized condensate booster pumps. STANDARD: Applicant places the switches for HTWL PUMP 1A, 1B, 1C, and CM BSTR PUMP 1A, 1B, and 1C to the OFF position. Applicant also depresses the green OFF pushbutton for KR PUMP A and KR PUMP B. This step is critical to NOT depress the green OFF pushbutton for KR PUMP B, which is powered from Unit 2, allowing KR Pump B to supply cooling water to Unit 2 loads. NOTE TO EXAMINER: KR is the Recirculated Cooling Water System. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT STEP 7 7. Dispatch operator to ensure breakers for all motor loads on all de-energized 6.9 KV busses open. REFER TO Enclosure 22 (Local Load Shed of 6.9 KV Busses). STANDARD: Applicant dispatches an operator by calling the simulator booth operator. NOTE TO BOOTH OPERATOR: WHEN notified to dispatch operator, REPEAT back the information and THEN INSERT EVENT 1. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 14 STEP 8 8. Do not continue in this procedure until the following are satisfied: Status of 6.9 KV bus lockout relays are determined Station management has approved power restoration. Enclosure 22 (Local Load Shed of 6.9 KV Busses) is complete. STANDARD: Applicant determines that lockout relay status is determined and that station management has approved power restoration per the initial conditions, however, does not continue until contacted by the Booth Operator that Enclosure 22 is complete. NOTE TO BOOTH OPERATOR: AFTER items triggered from EVENT 1 have timed out, CALL the Control Room and INFORM the applicant that Enclosure 22 is complete COMMENTS: ___ SAT ___ UNSAT STEP 9 9. Notify TCC prior to re-energizing affected 6.9 KV busses. STANDARD: Applicant calls the Booth Operator to notify the TCC. NOTE TO BOOTH OPERATOR: WHEN notified about re-energizing the 6.9 KV busses, REPEAT back the information. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 14 NOTE Zone A or B lockout will occur if at least one main transformer cooling circuit is not restored within 15 minutes of re-energizing main transformer. STEP 10 10. Energize 6.9 KV busses as follows: a. Announce "Energizing Unit 1 main power. All personnel stand clear." STANDARD: Applicant makes a plant page via the grey phone on 1MC-1. COMMENTS: ___ SAT ___ UNSAT STEP 11 b. Close at least one of the following PCBs: PCB 15 PCB 18. STANDARD: Applicant depresses the red CLOSE pushbuttons for PCB 15 CLOSE and PCB 18 CLOSE on 1 MC-11. NOTE TO EVALUATOR: PCB 15 will not close. This step is critical to align power the 1A Main Transformer from offsite. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 14 STEP 12 c. IF "TRANSF 1A" energized, THEN perform the following for each affected 6.9 KV bus: 1TD: 1) Place "7KV BUS 1TD MODE SEL" switch in "MAN A & TIE". 2) Close "7KV 1TD FDR FRM 1T1A". STANDARD: Applicant places the switch for 7KV BUS 1TD MODE SEL in the MAN A & TIE position as depresses the red CLOSE pushbutton for 7KV 1TD FDR FRM 1T1A. This step is critical to energize 1TD. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT STEP 13 1TC: 1) Place "7KV BUS 1TC MODE SEL" switch in "MAN A & TIE". 2) Close "7KV 1TC FDR FRM 1T1A". STANDARD: Applicant places the switch for 7KV BUS 1TC MODE SEL in the MAN A & TIE position as depresses the red CLOSE pushbutton for 7KV 1TC FDR FRM 1T1A. This step is critical to energize 1TC. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 14 STEP 14 1TB: 1) Place "7KV BUS 1TB MODE SEL" switch in "MAN A & TIE". 2) Close "7KV 1TB FDR FRM 1T2A". STANDARD: Applicant places the switch for 7KV BUS 1TB MODE SEL in the MAN A & TIE position as depresses the red CLOSE pushbutton for 7KV 1TB FDR FRM 1T2A. This step is critical to energize 1TB. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT STEP 15 1TA: 1) Place "7KV BUS 1TA MODE SEL" switch in "MAN A & TIE". 2) Close "7KV 1TA FDR FRM 1T2A". STANDARD: Applicant places the switch for 7KV BUS 1TA MODE SEL in the MAN A & TIE position as depresses the red CLOSE pushbutton for 7KV 1TA FDR FRM 1T2A. This step is critical to energize 1TA. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 14 STEP 16 d. IF "TRANSF 1B" energized, THEN perform the following for each affected 6.9 KV bus: STANDARD: Applicant determines that this step does not apply. COMMENTS: ___ SAT ___ UNSAT STEP 17 e. IF "TRANSF 1A" AND "TRANSF 1B" are energized, THEN place mode select switch for all 6.9KV busses in auto position. STANDARD: Applicant determines that this step does not apply. COMMENTS: ___ SAT ___ UNSAT STEP 18 f. Verify all 6.9 KV switchgear - ENERGIZED. STANDARD: Applicant determines that all 6.9 KV switchgear is energized via voltage gauges on 1MC-11 or via the OAC electrical graphic. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 14 STEP 19 11. RETURN TO step in effect. STANDARD: Applicant reads the step. COMMENTS: END OF TASK ___ SAT ___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM F READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is recovering from a Loss of Offsite Power Event. The TCC has informed the Control Room that the electrical grid has remained energized and adequate switchyard voltage and grid reliability is available to re-energize 6.9 KV busses with motor breakers open. The status of all 6.9 KV bus lockout relays has been determined. INITIATING CUES: The SRO instructs you restore offsite power to the 6.9 KV busses per AP/1/A/5500/007 (Loss of Normal Power), Enclosure 4 (Restoration of Offsite Power).

Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam PAGE 1 OF 10 System JPM G Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam PAGE 2 OF 10 EVALUATION SHEET Task: Shift Lower Containment Vent Units Alternate Path: No Facility JPM #: New Safety Function: 5 Title: Containment Cooling System K/A 022 A4.01 Ability to manually operate and/or monitor in the control room: CCS Fans Rating(s): 3.6 / 3.6 CFR: 41.7 / 45.5 to 45.8 Preferred Evaluation Location: Preferred Evaluation Method: Simulator X Control Room Perform Simulate X

References:

OP/1/A/6450/001 (Containment Ventilation (VV) Systems rev.040 Task Standard: 1B LCVU running and 1A LCVU off. Validation Time: 15 minutes Time Critical: Yes No X =========================================================================== Applicant: Time Start: __________ NAME___________________________ Docket #_______________ Time Finish: __________ Performance Rating: SAT ____ UNSAT ____ Performance Time _____ Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam PAGE 3 OF 10 SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC 175 3. Enter the password. 4. INITIAL CONDITION RESET pop-up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event PAGE 4 0F 10 Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam PAGE 4 OF 10 READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is in MODE 1. INITIATING CUES: The Control Room Supervisor has instructed you to shift Lower Containment Vent Units by stopping the 1A LCVU and starting the 1B LCVU. Steps 3.1 and 3.3 were marked N/A during the pre-job brief. Peer check has been waived. EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6450/001 Containment Ventilation (VV) Systems, Enclosure 4.13.

Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 10 START TIME: _______ STEP 1: 3.2 IF three LCVUs are operating AND it is desired, shift the operating units as follows: 3.2.1 IF the LCVUs are operating in "LOW" speed, perform the following: 3.2.1.1 Stop the LCVU to be removed from service by placing its control switch in the "OFF" position: "VV LCVU 1A" STANDARD: Applicant places the switch for VV LCVU 1A to the OFF position. This step is critical to shut down the desired Lower Containment Vent Unit COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT NOTE: The procedure may continue up to and including Step 3.2.1.8 before completing the following step. STEP 2 3.2.1.2 Verify the green indicating light illuminates for the LCVU stopped. STANDARD: Applicant determines the green indicating light is LIT for VV LCVU 1A. COMMENTS: ___ SAT ___UNSAT Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 10 STEP 3 3.2.1.3 Verify the red "MAX" indicating light extinguishes for the LCVU stopped. STANDARD: Applicant determines 1A MAX is DARK. COMMENTS: ___ SAT ___ UNSAT STEP 4 3.2.1.4 Verify the green "CLOSED" indicating light illuminates for the LCVU damper associated with the LCVU stopped. STANDARD: Applicant determines 1LCVU-D-1 LWR CONT VENT DAMPER is LIT. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 10 NOTE: If Unit 1 is in Mode 1 and LCVU 1C or 1D is the idle unit that is being placed in service, a delay of approximately 15 to 30 minutes may be needed before starting LCVU 1C or 1D to allow lower containment air temperature to increase. This will prevent exceeding the Tech Spec low limit for air temperature. {PIP 00-0763, PIP 05-3785} STEP 5 3.2.1.5 Start the idle LCVU by placing its control switch in the "LOW" position: "VV LCVU 1B" STANDARD: Applicant places the switch for VV LCVU 1B in the LOW position. This step is critical to start the desired LCVU. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT STEP 6 3.2.1.6 Verify the red indicating light illuminates for the LCVU placed in service. STANDARD: Applicant determines the red (middle) indicating light for VV LCVU 1B is LIT. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 10 STEP 7 3.2.1.7 Verify the red "OPEN" indicating light illuminates for the LCVU damper associated with the LCVU started. STANDARD: Applicant determines light for 1LCVU-D-2 LWR CONT VENT DAMPER. COMMENTS: ___ SAT ___ UNSAT STEP 8 3.2.1.8 Verify the red "MAX" indicating light illuminates for the LCVU placed in service. STANDARD: Applicant determines the red light for VV LCVU 1B MAX is LIT COMMENTS: ___ SAT ___ UNSAT STEP 9 3.2.2 IF the LCVUs are operating in "HIGH" speed, perform the following: STANDARD: Applicant determines that this step does not apply. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 10 STEP 10 3.4 Indicate below the operating Pipe Tunnel Booster Fan: "PIPE TUNNEL BSTR FAN 1A" "PIPE TUNNEL BSTR FAN 1B" STANDARD: Applicant marks the box for the operating Pipe Tunnel Booster Fan. COMMENTS: ___ SAT ___ UNSAT STEP 11 3.5 Indicate below the operating LCVUs: "VV LCVU 2A" "VV LCVU 2B" "VV LCVU 2C" "VV LCVU 2D STANDARD: Applicant marks the blocks for the 1B, 1C and 1D LCVUs. COMMENTS: END OF TASK ___ SAT ___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM G READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is in MODE 1. INITIATING CUES: The Control Room Supervisor has instructed you to shift Lower Containment Vent Units by stopping the 1A LCVU and starting the 1B LCVU. Steps 3.1 and 3.3 were marked N/A during the pre-job brief. Peer check has been waived.

Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam PAGE 1 OF 14 System JPM H Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam PAGE 2 OF 14 EVALUATION SHEET Task: Place Standby Component Cooling Train in Service Alternate Path: No Facility JPM #: KC-082 (Modified) Safety Function: 8 Title: Component Cooling Water System K/A 008 A4.01 Ability to manually operate and/or monitor in the control room: CCW indications and controls Rating(s): 3.3 / 3.1 CFR: 41.7 / 45.5 Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant Perform X Simulate

References:

OP/1/A/6400/005 (Component Cooling System) rev. 116 Task Standard: for miniflow. Validation Time: 20 minutes Time Critical: Yes No X =========================================================================== Applicant: Time Start: __________ NAME___________________________ Docket #_______________ Time Finish: __________ Performance Rating: SAT ____ UNSAT ____ Performance Time _____ Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam PAGE 3 OF 14 SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC #175 3. Enter the password. 4. -up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event PAGE 4 0F 14 Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam PAGE 4 OF 14 READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: maintenance on the pump and motor. INITIATING CUES: The Control Room SRO instructs you to shift trains of KC with 1B1 KC Pump in beginning at step 3.1.2 in enclosure 4.3 of OP/1/A/6400/005. Concurrent verification and peer checks have EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6400/005 (Component Cooling System), Enclosure 4.3 (Shifting Trains).

Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 14 START TIME: _______ STEP 1: 3.1.2 Ensure 1RN-347B (KC Hx 1B Inlet Isol) is open. STANDARD: Applicant determines that 1RN-347B is open by verifying the red OPEN light is LIT or via the OAC. COMMENTS: ___ SAT ___ UNSAT STEP 2 3.1.3 Ensure "KC HX 1B OTLT MODE" is in "KC TEMP". STANDARD: Applicant on 1MC-11. This step is critical to ensure that the outlet of the KC Heat exchanger is controlled at the proper temperature. COMMENTS: CRITICAL STEP ___ SAT ___UNSAT Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 14 STEP 3 3.1.4 IF letdown is in service per OP/1/A/6200/001 (Chemical and Volume Control System) perform the following: (R.M.) 3.1.4.1 Verify the Cation Bed Demineralizer is NOT in service per OP/1/A/6200/001 (Chemical and Volume Control System). STANDARD: Applicant determines that letdown is in service and that the Cation Bed Demineralizers are not in service. EXAMINER CUE: IF ASKED, COMMENTS: ___ SAT ___ UNSAT STEP 4 3.1.4.2 Record position of 1NV-153A (Letdn Hx Otlt 3-Way Vlv). Recorded valve position________________ STANDARD: Applicant determines that the position of 1NV-position. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 14 STEP 5 3.1.4.3 IF letdown flow is through the demineralizers, notify Primary Chemistry that the demineralizers will be bypassed while shifting KC Trains. Person notified ____________________________ STANDARD: Applicant determines that letdown flow is through the demineralizers and notifies Primary Chemistry that the demineralizers will be bypassed while shifting KC Trains. EXAMINER CUE: Chemistry, I understand the demineralizers will be COMMENTS: ___ SAT ___ UNSAT STEP 6 3.1.4.4 IF letdown flow is through the demineralizers, notify Radiation Protection that the demineralizers will be bypassed while shifting KC Trains. Person notified ____________________________ STANDARD: Applicant notifies Radiation Protection that the demineralizers will be bypassed while shifting KC Trains. EXAMINER CUE: understand that the demineralizers will be bypassed while shifting KC Trains. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 14 STEP 7 3.1.4.5 Place 1NV-153A (Letdn Hx Otlt 3-Way Vlv) in the "VCT" position. STANDARD: Applicant places the switch for 1NV-position. This step is critical to bypass the demineralizer to prevent a change in reactivity due to the changing boron affinity of the demineralizers caused by letdown temperature changes due to component cooling temperature changes when the trains are shifted. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT CAUTION: 5700 gpm discharge header flow per each operating KC pump shall NOT be exceeded. STEP 8 3.1.5 Start either KC Train 1B pump: "KC PUMP B1" STANDARD: Applicant depresses the red ON pushbutton for KC PUMP 1B on 1MC-11 This step is critical to start the desired pump. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 14 STEP 9 3.1.6 Adjust the following flow controllers on 1MC11 to zero gpm flow: 1KC-149 (KF Hx 1A Cool Wtr Otlt) STANDARD: Applicant adjusts the controller for 1KC-149 to zero gpm. COMMENTS: ___ SAT ___ UNSAT STEP 10 3.1.7 Stop all KC Train 1A pumps: "KC PUMP A2" STANDARD: Applicant depresses the green OFF pushbutton for KC PUMP A2 on 1MC-11 This step is critical to secured the desired pump. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT STEP 11 3.1.8 Place "KC HX 1A OTLT MODE" in "MINIFLOW" position. STANDARD: Applicant places the switch for KC HX 1A OTLT MODE in the -11 COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 14 STEP 12 3.1.9 IF AT ANY TIME KC Train flow approaches 5700 gpm while performing the next step, ensure 1KC-C40B (Train B Miniflow Isol) is closed. STANDARD: Applicant ensures that 1KC-40B is closed on 1MC-11. COMMENTS: ___ SAT ___ UNSAT STEP 13 3.1.10 Perform the following for the KF cooling loops that are in service: Adjust 1KC-149 (KF Hx 1A Cool Wtr Otlt) flow controller on 1MC11 to 3000 gpm or as necessary to maintain Spent Fuel Pool temperature < 125°F. STANDARD: Applicant adjusts 1KC-149 flow controller to less than or < 3000 gpm. EXAMINER NOTE: Since Spent Fuel Pool temperature is only ~ 115°F, the applicant may decide to adjust 1KC-149 at this time. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 14 NOTE: One pump running is preferred as long as flow is < 5700 gpm. STEP 14 3.1.11 IF KC flow requirement is > 5700 gpm, perform the following: STANDARD: Applicant determines that this step does not apply. COMMENTS: ___ SAT ___ UNSAT STEP 15 3.1.12 IF letdown is in service per OP/1/A/6200/001 (Chemical and Volume Control System), WHEN KC flow and temperature have stabilized perform the following: (R.M.) 3.1.12.1 IF 1NV-153A (Letdn Hx Otlt 3-Way Vlv) position was recorded as "DEMIN" in Step 3.1.4.2 AND no other reason exists for it to remain in the "VCT" position, return it to "AUTO" as follows: A. Place 1NV-153A in the "DEMIN" position. (R.M.) B. Verify 1NV-153A returns to "AUTO". STANDARD: Applicant places the control switch for 1NV-position and returns it to AUTO on 1MC-10. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 14 STEP 16 3.1.12.2 IF letdown flow is through the demineralizers, notify Primary Chemistry that the demineralizers have been restored to service. Person notified _________________________ STANDARD: Applicant notifies Primary Chemistry that the demineralizers have been restored to service. EXAMINER CUE: Chemistry, I understand the demineralizers have been restored COMMENTS: ___ SAT ___ UNSAT STEP 17 3.1.12.3 IF letdown flow is through the demineralizers, notify Radiation Protection that the demineralizers have been restored to service. Person notified _________________________ STANDARD: Applicant notifies Radiation Protection that the demineralizers have been restored to service. EXAMINER CUE: Christina Frey from Radiation Protection, I understand the demineralizers have been restored to COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 14 STEP 18 3.1.13 IF RN miniflow was established per Step 3.1.1.2, secure unneeded flow paths. STANDARD: Applicant determines that this step does not apply. COMMENTS: END OF TASK ___ SAT ___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM H READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: maintenance on the pump and motor. INITIATING CUES: The Control Room SRO instructs you to shift trains of KC with 1B1 KC Pump in beginning at step 3.1.2 in enclosure 4.3 of OP/1/A/6400/005. Concurrent verification and peer checks have rain KC Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam PAGE 1 OF 8 System JPM I In-Plant Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam PAGE 2 OF 8 EVALUATION SHEET Task: Break Condenser Vacuum Locally Alternate Path: None Facility JPM #: CA-084 Safety Function: 4S Title: Main Turbine Generator (MT/G) System K/A 045 A1.06 Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the MT/G system controls including: Expected response of secondary plant parameters following T/G trip Rating(s): 3.3 / 3.7 CFR: 41.5 / 45.5 Preferred Evaluation Location: Preferred Evaluation Method: Simulator In-Plant X Perform Simulate X

References:

AP/2/A/5500/006 (Loss of S/G Feedwater) Enclosure 3 Task Standard: Enclosure 3 has been completed with the first vacuum breaker opened within 10 minutes. Validation Time: 8 minutes Time Critical: Yes X No =========================================================================== Applicant: Time Start: ________ NAME __ ___ Docket # _________ Time Finish: ________ Performance Rating: SAT ____ UNSAT ____ Performance Time ___ Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam PAGE 3 OF 8 SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC # 3. Enter the password. 4. -up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event PAGE 4 0F 8 Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam PAGE 4 OF 8 READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 2 is in Mode 3 following a reactor trip. INITIATING CUES: The Control Room Supervisor instructs you to perform AP/2/A/5500/006 (Loss of S/G Feedwater) Enclosure 3 (Local Actions to Break Condenser Vacuum). This JPM is TIME CRITICAL; time begins when you acknowledge the task. EXAMINER NOTE: Provide applicant with a copy of the procedure.

Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 8 START TIME _______ Examiner NOTE: Critical Time Start: Record Time that applicant acknowledges the task _________. CAUTION High air flow rates will exist when vacuum breakers are first opened. Stay clear of pipe end. STEP 1: 1. Break condenser vacuum by opening the following valves: 2CM-368 (2A Main Cond Shell Vacuum Bkr) (TB2-600,2F-2G, 26) (Ladder needed) 2CM-369 (2B Main Cond Shell Vacuum Bkr) (TB2-600, 2F, 24-25) (Ladder needed) 2CM-370 (2C Main Cond Shell Vacuum Bkr) (TB2-609, 2F-22) (Ladder needed). STANDARD: Applicant will describe opening the valves: 2CM-368, 2CM-369, 2CM-370 This step is critical in order to open correct valves for breaking vacuum. Examiner Note: The critical end time is when the applicant describes opening the first valve. Due to the height of the valves, no fall protection will be required. Examiner Cue: When applicant describes engaging lever and rotating handwheel counter clockwise to open the following valve Critical end time________ COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 8 STEP 2 2. Secure steam to CSAEs as follows: a. Close the following valves: 2SA-22 (Main Steam To CSAE) (TB2-614, 2M-32) 2SA-27 (Aux Steam To CSAE) (TB-614, 2L-2M, 27). STANDARD: Applicant will describe closing 2SA-22 and 2SA-27 This step is critical, because if it is not performed, the CSAEs will continue to pull vacuum. Examiner Cue: As applicant properly describes closing the valves give cue as appropriate, Valve turns until resistance is felt. COMMENTS: CRITICAL STEP ___ SAT ___UNSAT STEP 3 b. WHEN time and manpower permit, THEN complete the shutdown of the CSAEs. REFER TO OP/2/B/6300/006 (Main Vacuum). STANDARD: Applicant will read the step Examiner Cue: The Control Room Supervisor has instructed another operator to complete the shutdown of the CSAEs. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 8 STEP 4 3. WHEN requested by Control Room Supervisor, THEN verify condenser vacuum broken as follows: a. Inspect each vacuum breaker for absence of air flow into condenser. b. Notify Control Room Supervisor of results. STANDARD: Applicant will inspect each vacuum breaker for the absence of air flow into the condenser and will report to the Control Room Supervisor. Examiner Cue: After each inspection, COMMENTS: ___ SAT ___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JKM I DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 2 is in Mode 3 following a reactor trip. INITIATING CUES: The Control Room Supervisor instructs you to perform AP/2/A/5500/006 (Loss of S/G Feedwater) Enclosure 3 (Local Actions to Break Condenser Vacuum). This JPM is TIME CRITICAL; time begins when you acknowledge the task.

Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam PAGE 1 OF 9 System JPM J In-Plant Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam PAGE 2 OF 9 EVALUATION SHEET Task: Shifting Main Transformer Auxiliaries Alternate Path: No Facility JPM #: EP-016 Safety Function: 6 Title: Electrical K/A 062 A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the ac distribution system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Types of loads that, if de-energized, would degrade or hinder plant operation. Rating(s): 3.4 / 3.9 CFR: 41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location: Preferred Evaluation Method: Simulator In-Plant X Perform Simulate X

References:

OP/1/A/6350/005 (Alternate AC Power Sources) rev. 076, Enclosure 4.24 Task Standard: The 1A Main Transformer Auxiliaries are transferred to an energized source. Validation Time: 15 minutes Time Critical: Yes No X =========================================================================== Applicant: Time Start: __________ NAME___________________________ Docket #_______________ Time Finish: __________ Performance Rating: SAT ____ UNSAT ____ Performance Time _____ Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam PAGE 3 OF 9 SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC 3. Enter the password. 4. -up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event PAGE 4 0F 9 Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam PAGE 4 OF 9 READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is at 100% power. The incoming feeder breaker to 1LXC tripped due to a load center fault. As a result, one-half of the 1A Main Transformer Auxiliaries have been de-energized. INITIATING CUES: The Unit Supervisor directs you to shift the 1A Main Transformer Auxiliaries to the 1LXD Feeder per Enclosures 4.24 (Shifting Main Transformer 1A Auxiliaries) of OP/1/A/6350/005 (Alternate AC Power Sources). EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6350/005, Enclosure 4.24.

Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 9 START TIME: _______ NOTE: 1. Shifting of power supplies shall be performed without delay. 2. All breakers and alarm lights are located inside the cabinet at the Main Transformer. 3. During normal operation, loss of a power supply (from LXC or LXD) will be indicated by the associated "NO VOLTAGE BANK A (B)" alarm light at the transformer. 4. Electrical PPE (high voltage gloves, FR clothing, face shield) is required for shifting power supplies. Examiner Note: Applicant should state that they would acquire the required PPE. STEP 1: 3.1 IF shifting Bank A power supplies, perform the following: 3.1.1 Verify voltage indicated on 1LXD per one of the following: Transformer 1TXD Supply Voltage meter with 1LXD-4B closed OR Transformer 1TXS Supply Voltage meter with 1LXD-8B closed STANDARD: Applicant verifies voltage indicated on transformer 1TXD with 1LXD-4B closed or 1TXS with 1LXD-8B closed. Examiner Cue: 600 volts is indicated. COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 9 STEP 2 3.1.2 IF this is an unexpected loss of power, verify the following at Transformer 1A: "NO VOLTAGE BANK A" alarm light illuminated. "NO VOLTAGE BANK B" alarm light dark. STANDARD: Applicant Examiner Cue: NO VOLTAGE BANK A is LIT and NO VOLTAGE BANK B is DARK. COMMENTS: ___ SAT ___UNSAT STEP 3 3.1.3 Open "NORMAL FEEDER 1LXC" breaker. STANDARD: Applicant describes opening the NORMAL FEEDER 1LXC breaker by placing it in the OFF (down) position. Examiner Cue: NORMAL FEEDER 1LXC is in the OFF position. This step is critical to allow the lockout bar to be slid in the following step. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 9 STEP 4 3.1.4 Slide lockout bar to the left. STANDARD: Applicant describes sliding the lockout bar to the left. Examiner Cue: Lockout bar is to the left. This step is critical to allow closing of the EMERG FEEDER 1LXD breaker in the following step. COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT STEP 5 3.1.5 Close "EMERG FEEDER 1LXD" breaker. STANDARD: Applicant describes closing the EMERG FEEDER 1LXD breaker by placing the breaker to the ON (up) position. Examiner Cue: EMERG FEEDER 1LXD breaker is in the ON position. This step is critical to energize the transformer auxiliaries for the 1A Main Transformer COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 9 STEP 6 3.1.6 Acknowledge any alarms present. STANDARD: Applicant describes acknowledging any alarms. Examiner Cue: Alarms have been acknowledged. COMMENTS: ___ SAT ___ UNSAT STEP 7 3.1.7 Complete and file Enclosure 4.29 (Unit 1 Main Transformers Cooler Groups Status) to record status. STANDARD: Applicant reads the step. Examiner Cue: Another operator will complete and file enclosure 4.29 NOTE: At this point, Bank A is supplied from 1LXD. Subsequent steps are to return Bank A to 1LXC. COMMENTS: END OF TASK ___ SAT ___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM J DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is at 100% power. The incoming feeder breaker to 1LXC tripped due to a load center fault. As a result, one-half of the 1A Main Transformer Auxiliaries have been de-energized. INITIATING CUES: The Unit Supervisor directs you to shift the 1A Main Transformer Auxiliaries to the 1LXD Feeder per Enclosures 4.24 (Shifting Main Transformer 1A Auxiliaries) of OP/1/A/6350/005 (Alternate AC Power Sources).

Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam PAGE 1 OF 10 System JPM K In-Plant Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam PAGE 2 OF 10 EVALUATION SHEET Task: Place the 2A Hydrogen Analyzer in Service Alternate Path: No Facility JPM #: VX-024 Safety Function: 5 Title: Hydrogen Recombiner and Purge Control System (HRPS) K/A 028 A1.01 Ability to predict and/or monitor changes in parameter (to prevent exceeding design limits) associated with operating the HRPS controls including): Hydrogen concentration Rating(s): 3.4 / 3.8 CFR: 41.5 / 45.5 Preferred Evaluation Location: Preferred Evaluation Method: Simulator In-Plant X Perform Simulate X

References:

EP/2/A/5000/E-1 (Loss of Reactor or Secondary Coolant), rev. 025 OP/2/A/6450/010 (Containment Hydrogen Control Systems Enclosure 4.9), rev. 026 Task Standard: Hydrogen Analyzer Train 2A in Service monitoring upper containment via selection of Position "1". Validation Time: 15 minutes Time Critical: Yes No X =========================================================================== Applicant: Time Start: __________ NAME___________________________ Docket #_______________ Time Finish: __________ Performance Rating: SAT ____ UNSAT ____ Performance Time _____ Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam PAGE 3 OF 10 SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC #168 3. Enter the password. 4. the INITIAL CONDITION RESET pop-up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event PAGE 4 0F 10 Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam PAGE 4 OF 10 READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: A large break LOCA has occurred on Unit 2. The procedure currently in use is EP/2/A/5000/E-1 (Loss of Reactor or Secondary Coolant). Containment Hydrogen Analyzer 2B is tagged for maintenance. INITIATING CUES: The Control Room Supervisor directs you to place Containment Hydrogen OP/2/A/6450/010 (Containment Hydrogen Control Systems) Enclosure 4.9, step 3.1. All initial conditions are complete. Peer check has been waived. EXAMINER NOTE: After reading cue, provide examinee with a copy of OP/2/6450/010, Enclosure 4.9 with the Initial Conditions signed off.

Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 10 START TIME: _______ STEP 1: 3.1 Place Hydrogen Analyzer Train A OR Train B in service. 3.1.1 IF aligning Hydrogen Analyzer Train A, proceed as follows: 3.1.1.1 Obtain Hydrogen Analyzer Control Panel Train A (2ELCP0251) key (Key #225) from WCC. STANDARD: Applicant determines from the initiating cue that A train needs to be aligned and obtains the key #225 EXAMINER NOTE: Key not required to be obtained to complete this JPM task. Once key is identified give cue. EXAMINER CUE: COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 10 NOTE: Steps 3.1.1.2 - 3.1.1.5 will be performed at Hydrogen Analyzer Control Panel Train 2A HACP-2A (2ELCP0251) (AB-579, DD-61). STEP 2 3.1.1.2 Select the desired sample location by positioning the "HYDROGEN ANALYZER SAMPLE VALVES PORTS" switch: Position "1" (for sampling Upper Containment) Position "2" (for sampling operating level) Position "3" (for sampling Steam Generator 1B cavity) Position "ALL" for sampling ALL 3 locations) STANDARD: Applicant describes placing the HYDROGEN ANALYZER SAMPLE EXAMINER CUE: This step is critical to sample Upper Containment. COMMENTS: CRITICAL STEP ___ SAT ___UNSAT STEP 3 3.1.1.3 Verify the "POS 1: H2 ANALYZER POS 2: POST ACCIDENT SAMPLE PANEL" switch is in "POS. 1". STANDARD: Applicant EXAMINER CUE: COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 10 STEP 4 3.1.1.4 Insert key in "HYDROGEN ANALYZER CONT ISOLATION VALVES" key switch and turn to "OPEN" position. STANDARD: Applicant position. This step is critical to open the containment isolation valves in order to be able to sample upper containment. EXAMINER CUE: COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT STEP 5 3.1.1.5 Verify the following indicating lights are lit: "H2 SAMPLE CONT. ISOLATION VALVES OPEN" Sample location(s) selected in Step 3.1.1.2. STANDARD: Applicant describes verifying the red OPEN light LIT for H2 Sample Containment Isolation Valves. EXAMINER CUE: Red OPEN light is lit COMMENTS: ___ SAT ___ UNSAT Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 10 NOTE: Steps 3.1.1.6 - 3.1.1.7 will be performed inside A Train Hydrogen Analyzer Control Unit (PAMS) 2MIMT5320A (AB-579, DD-61). STEP 6 3.1.1.6 Verify the "STANDBY/OFF" switch is in the "STANDBY" position. STANDARD: Applicant EXAMINER CUE: STANDBY position COMMENTS: ___ SAT ___ UNSAT STEP 7 3.1.1.7 Place the "ON/OFF" switch in the "ON" position. STANDARD: Applicant . This step is critical to turn the analyzer on. EXAMINER CUE: Switch is in the ON position light is lit COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 10 STEP 8 3.1.1.8 Monitor H2 concentration at either of the following locations: "Hydrogen Analyzer Control Unit "2MIMT5320A" (AB-579, DD-61) "CONTAINMENT TRN A H2 ANAL" meter (2MIP5320) located on 2MC7. STANDARD: Applicant describes calling the control room to inform them that the hydrogen analyzers are in service and can be read on the local unit or on 2MC-7. EXAMINER CUE: Hydrogen concentration will be monitored on 2MC-7 COMMENTS: END OF TASK ___ SAT ___ UNSAT STOP TIME ________

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM K READ TO APPLICANT DIRECTION TO APPLICANT: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: A large break LOCA has occurred on Unit 2. The procedure currently in use is EP/2/A/5000/E-1 (Loss of Reactor or Secondary Coolant). Containment Hydrogen Analyzer 2B is tagged for maintenance. INITIATING CUES: The Control Room Supervisor directs you to place Containment Hydrogen Analyzer 2A in OP/2/A/6450/010 (Containment Hydrogen Control Systems) Enclosure 4.9, step 3.1. All initial conditions are complete. Peer check has been waived.