Letter Sequence Other |
---|
|
|
MONTHYEARML13078A2912013-03-0505 March 2013 Areva Calculation #32-9200291-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer Nozzles (Non-Proprietary) Project stage: Request DCL-13-024, Supplement to ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 22013-03-0707 March 2013 Supplement to ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 2 Project stage: Supplement ML13081A0742013-04-11011 April 2013 Summary Conference Call Between Pacific and Electric Co., and NRC Regarding Verbal Authorization of Relief Request Rep-1 U2, Revision 2 Project stage: Other ML13170A1962013-07-11011 July 2013 Request for Withholding Information from Public Disclosure - 3/5/2013 Affidavit Executed by G. Elliott, Areva Np Inc., Regarding Areva Calculations Provided for Relief Request REP-1 U2, Revision 2 Project stage: Withholding Request Acceptance ML13232A3082013-08-28028 August 2013 Relief Request REP-1 U2, Revision 2, Alternative to Code Requirements for Pressurizer Structural Weld Overlays, for the Third 10-Year Inservice Inspection Interval Project stage: Other 2013-04-11
[Table View] |
|
---|
Category:Memoranda
MONTHYEARML24297A6392024-10-30030 October 2024 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML24275A2162024-10-25025 October 2024 Summary of Meeting Between the U.S. Nuclear Regulatory Commission and the Yak Tityu Tityu Yak Ti?Hini Northern Chumash Tribe Related to the Proposed License Renewal (Lr) for Diablo Canyon Power Plant Units 1 and 2 ML24157A0252024-07-0101 July 2024 Memo to Michelle Rome Summary of 4/4/2024 Meeting with CA SHPO ML24143A1202024-06-0303 June 2024 Memo to Michelle Rome Summary of 4/5/2024 Meeting with Ytt ML24108A1482024-05-0707 May 2024 February 2024 Environmental Scoping Meetings Related to the Diablo Canyon LRA - Memo ML24067A1572024-03-0707 March 2024 Memorandum from the Secretary Referring Hearing Request to the Atomic Safety and Licensing Board Panel ML23265A1902023-09-26026 September 2023 Meeting Summary: September 13, 2023 Diablo Canyon, Units 1 and 2 License Renewal Application Pre-Application Meeting ML23143A2262023-06-0101 June 2023 May 3, 2023, Summary of Public Meeting to Discuss the End of Cycle Assessment and Pre-Submittal License Renewal Process Overview for Diablo Canyon Power Plant, Units 1 and 2 ML23046A0292023-02-23023 February 2023 Timely Renewal Exemption 5 Day Memorandum ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22131A1592022-05-11011 May 2022 Reply to the NRCs Response to the Office of the Inspector Generals (OIG) Event Inquiry Into the NRCs Oversight of the Auxiliary Feedwater System at Diablo Canyon Nuclear Power Plant, OIG Case No. 20-025 ML22109A1792022-05-0303 May 2022 Response OIG Special Inquiry Into NRCs Oversight AFW at Diablo Canyon (OIG Case No. 20-025) ML22108A1672022-05-0303 May 2022 Staff Assessment of OIG Event Inquiry Into the NRCs Oversight AFW at Diablo Canyon (OIG Case No. 20-025) ML21146A1852021-06-28028 June 2021 DC RFI 2021401 ML21146A185 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21060B1822021-03-0101 March 2021 Memorandum: 1-26-21 Diablo Canyon Renewal Pre-Application Meeting Summary ML19318F5272019-11-15015 November 2019 Summary of the August 27, 2019, Public Meeting Near the Diablo Canyon Nuclear Power Plant Regarding the Establishment and Operation of Community Advisory Boards ML19182A3562019-07-23023 July 2019 Quarterly Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 - April 1 to June 30, 2019 ML18298A0762018-10-26026 October 2018 Notice of Forthcoming Closed Meeting with Pacific Gas and Electric Company to Discuss Security-Related Information for Diablo Canyon Power Plant, Units 1 and 2 ML18173A0082018-06-20020 June 2018 Cancelling Numerous Inspection Report Numbers ML18131A0482018-05-11011 May 2018 Memorandum to File Environmental Assessment and Finding of No Significant Impact for Pacific Gas and Electric Company'S Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) for the Diablo Canyon Independent Spent Fuel S ML16119A5002016-04-29029 April 2016 Notice of Forthcoming Closed Meeting with Pacific Gas & Electric Company to Discuss Proposed Change to Defensive Strategy and 10 CFR 50.54(p) Documentation for Reduction in Minimum Staffing Requirements at Diablo Canyon ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16029A2322016-03-16016 March 2016 LTR-15-0337-1 - Diablo Canyon Power Plant, Units 1 and 2 - Closure of 10 CFR 2.206 Petition from Bullard High School Students (CAC Nos. MF6515 and MF6516) ML15125A1862015-05-27027 May 2015 April 28, 2015, Summary of Category 1 Public Meeting with Pacific Gas and Electric Company to Discuss Diablo Canyon'S Seismic Hazard Reevaluation Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2. ML14344A6302014-12-15015 December 2014 Close-out letter-California Facilities Preemption Safety Evaluation ML14167A4922014-07-0303 July 2014 Summary of June 5, 2014, Conference Call to Discuss the Status of the License Renewal Application Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML14022A1202014-06-23023 June 2014 Memorandum to File, Review of Revision 21 of Final Safety Analysis Report Update ML14162A4582014-06-12012 June 2014 Pacific Gas and Electric Company Diablo Canyon Power Plant Units 1 and 2, Regulatory Audit in Support of the License Amendment Request to Implement Risk-Informed, Performance-Based, Fire Protection Program as Allowed by Title 10 of the Code ML13339A4282014-04-28028 April 2014 Transmittal Memorandum for Regulatory Audit Report for the August 6, 2013 Through August 8, 2013 Cyber Security Pilot Study at Dcnpp Avila Beach, CA ML13312A6462013-11-25025 November 2013 Meeting Notice with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13290A2272013-10-18018 October 2013 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13263A1922013-09-24024 September 2013 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13260A0052013-09-18018 September 2013 10/2/13 Notice of Pre-Application Meeting with Pacific Gas and Electric Company to Discuss Upcoming Structural Weld Overlay Relief Request to Use an Alternative to Disposition Detected Laminar Indications at Diablo Canyon, Unit 2 ML13246A4262013-09-0505 September 2013 Notice of Meeting to Discuss Amendment Request to Adopt Technical Specifications Task Force TSTF-505, Provide Risk-Informed Extended Completion Times, RITSTF Initiative 4B at Diablo Canyon, Units 1 and 2 ML13246A4072013-09-0505 September 2013 9/25/13 Notice of Forthcoming Pre-Application Meeting to Discuss Emergency Core Cooling System Evaluations for License Amendment Request at Diablo Canyon, Units 1 and 2 ML13246A4162013-09-0505 September 2013 9/24/13 - Notice of Pre-Application Meeting to Discuss License Amendment Request for Technical Specification 3.8.1 Diesel Generator Surveillance Requirements at Diablo Canyon, Units 1 and 2 ML13246A2622013-09-0404 September 2013 9/18/13 Notice of Forthcoming Closed Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13179A0622013-07-0909 July 2013 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13163A0242013-06-12012 June 2013 6/26/13 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13126A0872013-05-0707 May 2013 Notice of Forthcoming 5/29/13 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13101A2782013-04-24024 April 2013 Transmittal Memo for Regulatory Audit Report for the February 11-14, 2013 Cyber Security Pilot Study at the CS Innovation Facility in Scottsdale, Arizona ML13081A0742013-04-11011 April 2013 Summary Conference Call Between Pacific and Electric Co., and NRC Regarding Verbal Authorization of Relief Request Rep-1 U2, Revision 2 ML13074A1182013-03-15015 March 2013 3/27/13 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13052A5512013-02-21021 February 2013 Preapplication Meeting with Pacific Gas and Electric, License Amendment Request to Adopt NFPA-805 Performance-Based Standard for Fire Protection for LWR Generating Plants, at Diablo Canyon, Units 1 and 2 ML13028A2022013-02-0404 February 2013 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13030A2462013-01-30030 January 2013 2/12/13 Forthcoming Preapplication Meeting with Pacific Gas and Electric Company to Discuss License Amendment Requests for Degraded Voltage Protection and Control Room Dose Analysis of Record at Diablo Canyon, Units 1 and 2 ML13017A1572013-01-15015 January 2013 Diablo Canyon - January Hearing File Update ML12354A5392012-12-20020 December 2012 1/24/2013 - Notice of Meeting with Pacific Gas and Electric to Discuss Diablo Canyon, Units 1 and 2 License Amendment Request to Revise FSAR Update Related to Delayed Access Offsite Power Circuit to Conform with GDC 17 2024-07-01
[Table view] |
Text
April 11, 2013
MEMORANDUM TO: File
FROM: James T. Polickoski, Project Manager /RA/ Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF MARCH 8, 2013, CONFERENCE CALL BETWEEN PACIFIC GAS AND ELECTRIC COMPANY AND THE NUCLEAR REGULATORY COMMISSION REGARDING VERBAL AUTHORIZATION OF RELIEF REQUEST REP-1 U2, REVISION 2 (TAC NO. MF0880)
By letter dated March 5, 2013 (Agencywide Documents and Access Management Systems (ADAMS) Accession Number (No.) ML130780374) and supplemented March 7, 2013 (ADAMS Accession No. ML13067A343), Pacific Gas and Electric Company (PG&E, the licensee) requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, IWA-4000, at Diablo Canyon Power Plant, Unit 2 (DCPP U2). The licensee requested U.S. Nuclear Regulatory Commission (NRC) approval to use the alternative in Relief Request REP-1, U2, Revision 2, to disposition laminar indications detected in overlaid Alloy 82/182 dissim ilar metal welds (DMWs) and similar metal welds associated with Pressurizer nozzles at DCPP U2. Specifically, the licensee stated that restoration to compliance with the above requirements would result in potential hardship or unusual difficulty without a compensating increase in the level of quality and safety; the indications had been evaluated and found to meet design requirements; and this alternative was requested pursuant to Title 10 of the Code of Federal Regulations, Part 50 (10 CFR 50) paragraph 55a(a)(3)(ii).
A conference call was held on March 8, 2013, between NRC and licensee staff to discuss this submittal and the results of the NRC staff's review of this relief request. The NRC staff provided a summary of the licensee's submittal below:
In the DCPP U2 2013 refueling outage numbered 2R17 during scheduled and required Inservice Inspection (ISI) Examinations, the licensee detected laminar indications associated with the overlaid DMWs at Pressurizer Safety Nozzles A, B, and C and Spray Nozzle using qualified phased array ultrasonic testing (UT). The licensee did not detect these indications after weld overlay installation in 2008 using qualified conventional UT nor during the follow-on ISI examinations in October 2009. For the 2013 inspection results, the licensee reported that the indications in the weld overlay installed on Safety Nozzles A and B and Spray Nozzle exceeded the acceptance standards for the acceptance examinations in the original relief request REP-1, U2, Revision 1, which the NRC approved on February 6, 2008 (ADAMS Accession No. ML080110001).
The licensee stated in its submittal that performing the required ASME Code repair of the subject overlaid dissimilar metal butt welds would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The licensee identified hardship in the areas of radiological dose, industrial safety, and in the potential reduction in the overall effectiveness of the original weld overlay mitigation technique in that additional grinding to remove these indications and re-welding could cause a higher likelihood of introducing more
flaws. In lieu of removing the laminar indications, the licensee performed a flaw evaluation and stress analysis demonstrating that the overlaid DMWs are acceptable for continued operation. The licensee performed the flaw evaluation of the laminar indications in Pressurizer Safety Nozzle A, Safety Nozzle B, Safety Nozzle C, and the Spray Nozzle based on the requirements of the ASME Code,Section XI, IWB-3600, assuming planar flaws. The licensee also performed a stress analysis demonstrating that the interface length between the weld overlay and the nozzle/pipe base metal is sufficient in light of laminar indications using the rules of the ASME Code,Section III, NB-3227.2. As documented in its submittal, the licensee committed to perform three successive examinations over the next three ISI periods of Safety Nozzles A, B, and C and the Spray Nozzle to monitor the growth, if any, of the laminar indications in accordance with the ASME Code,Section XI, IWB-2420(b). The three successive examinations would verify the validity of the above crack growth and stress analyses and monitor the laminar indications.
After reviewing the above details within the licensee submittal, the NRC staff summarized the results of its technical review as follows:
The NRC found that the introduction of additional cold work and changing of the weld residual stress profile of the weld overlay mitigation would constitute an unusual difficulty, if the indications were demonstrated to have insignificant challenge to the structural integrity of the subject welds. The NRC staff found that the laminar indications detected at Pressurizer Safety Nozzle A, Safety Nozzle B, Safety Nozzle C, and the Spray Nozzle do satisfy the acceptance standards of Table IWB-3514-3 and IWB-3640 of Section XI of the ASME Code. The NRC staff noted that the laminar flaws are not open to pipe surface and, therefore, will not grow due to environmental effects. The NRC staff found that the weld overlay on each affected nozzle has been verified to have sufficient length to transfer loads back to the base metal without exceeding allowable primary shear stresses of the ASME Code,Section III, NB-3227.2.
In completing its regulatory review of t his request, the NRC staff noted that NRC Licensing Procedure LIC-102, Revision 2, "Relief Request Reviews," dated August 24, 2009 (ADAMS Accession No. ML091380595), permits that, on rare occasions, the NRC staff may grant verbal authorization as an alternative under 10 CFR 50.55a(a)(3) due to unforeseen circumstances. The NRC staff determined that the need exists fo r verbal authorization for this request based on the circumstances and the safety evaluation not yet being formally documented. Based on the above, the NRC staff provided verbal authorization as follows:
The NRC staff determined that the licensee's proposed alternative provides reasonable assurance of quality and safety in regards to the structural integrity and leak tightness of the subject welds for one cycle of operation. The NRC staff concluded that complying with the specified ASME Code requirement and previously granted alternative relief request, REP-1 U2, Revision 1, would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Accordingly, the NRC staff concluded that for one fuel operating cycle, the licensee had adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(a)(3)(ii) and is compliant with the requirements of the ASME Code,Section XI, for which relief was not requested. Therefore, on March 8, 2013, the NRC authorized use of the Relief Request REP-1 U2, Revision 2, at the DCPP Unit 2, for the fuel cycle following the 2013 refueling outage, 2R17. All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in this relief request remained applicable, including third-party review by the Authorized Nuclear Inservice Inspector. This verbal authorization did not preclude the NRC staff from asking additional clarification questions regarding the subject relief request while preparing the subsequent written safety evaluation.
In anticipation of follow-on licensee submittals requesting relief authorization for additional DCPP U2 operational cycles, the NRC staff discuss ed needed technical content in these future submittals. First, the NRC staff stated that the licensee will need to demonstrate the effectiveness of the ultrasonic examination techniques used to examine structural weld overlays. Secondly, the NRC staff indicated the licensee would need to perform a finite element analysis, modeling the voids in the weld overlay where the laminar flaws exist, to support the conclusion that the laminar flaws will not challenge the structural integrity of the subject overlaid DMWs for the remaining service life of the subject overlaid welds.
The NRC staff stated it will issue a written safety evaluation within 150 days of this call providing final written authorization for this relief request. A list of the participants of the call is enclosed.
Docket No. 50-323
Enclosure:
List of Participants
ML13081A074 OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME JPolickoski JBurkhardt MMarkley JPolickoski DATE 4/4/13 3/22/13 4/11/13 4/11/13 LIST OF PARTICIPANTS MARCH 8, 2013, CONFERENCE CALL REGARDING VERBAL AUTHORIZATION OF RELIEF REQUEST REP-1 U2, REVISION 2 DIABLO CANYON POWER PLANT, UNIT 2 DOCKET NO. 50-323 PACIFIC GAS AND ELECTRIC COMPANY Jeff Summy, Senior Director, Engineering and Technical Services Tom Baldwin, Manager, Regulatory Services Jim Hill, Inservice Inspection Engineer David Gonzalez, Supervisor, Inservice Inspection Lee Goyette, Engineering Pat Nugent, Manager, Technical Support Engineering Mike Leger, Inservice Inspection Engineer Philippe Soenen, Supervisor, Regulatory Services Ben Grambau, AREVA
Gayle Elliott, AREVA Ken Stuckey, AREVA
Brad Thigpen, AREVA Todd Richards, AREVA U.S. NUCLEAR REGULATORY COMMISSION Tim Lupold, Chief, Piping and NDE Branch Michael Markley, Chief, Plant Licensing Branch IV Jay Collins, Senior Materials Engineer, Piping and NDE Branch John Tsao, Senior Materials Engineer, Piping and NDE Branch Stephen Cumblidge, Materials Engineer, Piping and NDE Branch James Polickoski, Project Manager Diablo Canyon, Plant Licensing Branch IV Jim Drake, Chief, Region IV Plant Support Branch 2 Isaac Anchondo, Reactor Inspector, Region IV Plant Support Branch 2 Peter Jayroe, Reactor Inspector, Region IV Plant Support Branch 2 Laura Micewski, Resident Inspector Diablo Canyon, Reactor Projects Branch B Enclosure