MONTHYEARML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23118A2512023-04-28028 April 2023 Submittal of 2022 Annual Radiological Environmental Operating Report ML23118A2652023-04-28028 April 2023 Submittal of 2022 Annual Radiological Effluent Release Report ML22179A3102022-06-22022 June 2022 Connecticut, Inc - 2021 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirement of 10 CFR 50.46 ML22118A3462022-04-28028 April 2022 Annual Radioactive Effluent Release Report ML22126A1022022-04-25025 April 2022 Annual Radiological Environmental Operating Report ML21120A3252021-04-30030 April 2021 Submittal of Annual Radioactive Effluent Release Report ML21119A2262021-04-28028 April 2021 Independent Spent Fuel Storage Installation Annual Radiological Environmental Operating Report ML21116A0192021-04-23023 April 2021 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML20181A5392020-06-29029 June 2020 Submittal of 2019 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML19179A1472019-06-21021 June 2019 2018 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML19093A4922019-04-0303 April 2019 Submit Semiannual Operating Report for July 1 Through December 31, 1975, Volume 2 ML19098A1642019-04-0101 April 2019 Submittal of Annual Changes, Tests, and Experiments Report - Regulatory Commitment Evaluation Report ML18184A3462018-06-28028 June 2018 2017 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML18130A5922018-04-30030 April 2018 Independent Spent Fuel Storage Installation 2017 Annual Radiological Environmental Operating Report ML18130A5902018-04-30030 April 2018 Independent Spent Fuel Storage Installation Annual Radiological Environmental Operating Report ML18093A3872018-03-28028 March 2018 Submittal of Annual Changes, Tests, an Experiments Report Regulatory Commitment Evaluation Report ML17184A1462017-06-27027 June 2017 Transmittal of 2016 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML17139B4442017-04-27027 April 2017 ISFSI - Annual Radiological Environmental Operating Report ML17094A4092017-03-30030 March 2017 Submittal of 2016 Annual Changes, Tests and Experiments Report ML16179A2052016-06-21021 June 2016 2015 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML16141A3722016-05-0202 May 2016 Annual Radioactive Effluent Release Report ML14188C0562014-06-27027 June 2014 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML14122A2522014-04-26026 April 2014 Independent Spent Fuel Storage Installation, Submittal of Annual Radiological Environmental Operating Report ML13183A0682013-06-26026 June 2013 2012 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML13141A5832013-04-26026 April 2013 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report ML13128A0702013-04-26026 April 2013 2012 Annual Radioactive Effluent Release Report ML13100A1182013-04-0101 April 2013 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML1219103392012-06-28028 June 2012 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML12130A2132012-04-25025 April 2012 Independent Spent Fuel Storage Installation - Annual Whole Body Exposure Report Annual Reactor Coolant Specific Activity Report ML1118004992011-06-27027 June 2011 2010 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46, Kewaunee, Millstone, North Anna, Surry ML11130A0232011-04-29029 April 2011 Submittal of Annual Radioactive Effluent Release Report ML11129A0732011-04-29029 April 2011 Independent Spent Fuel Storage Installation Annual Radiological Environmental Operating Report ML1105405372011-02-16016 February 2011 Independent Spent Fuel Storage Installation Annual Changes, Tests, and Experiments Report for January-December 2010 ML1023006522010-08-10010 August 2010 Retransmittal of Annual Changes, Tests & Experiments Report and Regulatory Commitment Evaluation Report for 2009 ML1018104352010-06-29029 June 2010 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML11237A0012010-04-30030 April 2010 Annual Radioactive Effluent Release Report for 2009 ML1013202292010-04-30030 April 2010 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report ML1006805212010-02-25025 February 2010 Independent Spent Fuel Storage Installation (Isfsi), Submittal of Annual Radioactive Effluent Release Report for January 1, 2009 Through December 31, 2009 ML0918202722009-06-30030 June 2009 Submittal of 2008 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML0912501862009-04-24024 April 2009 Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report for 2008 ML0912405752009-04-24024 April 2009 2008 Annual Radioactive Effluent Release Report ML0909702862009-03-30030 March 2009 Submittal of Report of Facility Changes, Tests and Experiments, and Regulatory Commitment Changes for 2008 ML0829004942008-10-0202 October 2008 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML0817904372008-06-26026 June 2008 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML0712401342007-04-30030 April 2007 Annual Radioactive Effluent Release Report for the Period January Through December 2006 ML0712307172007-04-30030 April 2007 Independent Spent Fuel Storage Installation - 2006 Annual Radiological Environmental Operating Report ML0518603972005-06-30030 June 2005 Annual Report of Emergency Core Cooling System Model Changes ML0413104842004-04-30030 April 2004 2003 Independent Spent Fuel Storage Installation Annual Radiological Environmental Operating Report 2024-06-25
[Table view] Category:Letter
MONTHYEARML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure 2024-09-03
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGIN[A 23261 April 25, 2012 REIRS Project Manager Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission MS# T-9F31 Washington, DC 20555 Serial No.S&L/JSA Docket Nos.12-268 RO 50-280 50-281 72-2 72-55 DPR-32 DPR-37 SNM-2501 License Nos.Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATION ANNUAL WHOLE BODY EXPOSURE REPORT ANNUAL REACTOR COOLANT SPECIFIC ACTIVITY REPORT Pursuant to 10 CFR 20.2206, Virginia Electric and Power Company submits the Annual Whole Body Exposure Report for the Surry Power Station for the calendar year 2011.The data required by 10 CFR 20.2206(b) was developed in accordance with the instructions of Regulatory Guide 8.7, Instructions for Recording and Reporting Occupational Radiation Dose Data, Appendix C and has subsequently been forwarded on April 11, 2012, via NRC's Radiation Exposure Information and Reporting System (REIRS) web site at http://www.reirs.com.
Information on the data file that was forwarded to REIRS is provided below. In addition, Attachment 1 provides the related Summary of the Distribution of Doses for 2011.File Name: Date Created: Operating System: Contact: Other Instructions:
NRC5.DAT April 11, 2012 Windows XP Duane Boone (757) 365-2035 None Signature and Date:______
Also, this letter confirms that no annual report of specific activity analysis is required for the calendar year 2011 pursuant to the reporting requirements of Surry Technical Specification 6.6.A.2.b.
The specific activity of the reactor coolant for Surry Power Station Units 1 and 2 did not exceed 1.0 pCi/cc dose equivalent 1-131 or 1 00/P- pCi/cc as stipulated in Surry Technical Specification 3.1.D.4 during the calendar year 2011.
Serial No.12-268 Annual Whole Body Exposure/RCS Specific Activity Reports Docket Nos.: 50-280, 50-281 72-2,72-55 If you have any questions, please contact Mr. Duane Boone at 757-365-2035.
Very truly yours, B. L. Stanley Director Safety & Licensing Surry Power Station Attachment Commitments contained in this letter: None.cc: U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001 Attn: Derek Hagemeyer CER/MS 45 ORAU/ORISE PO Box 117 Oak Ridge, TN 37831-0117 Ms. K. R. Cotton NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop 8 G9A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Senior Resident Inspector Surry Power Station Serial No.12-268 Annual Whole Body Exposure/RCS Specific Activity Reports Docket Nos.: 50-280, 50-281 72-2,72-55 ANNUAL WHOLE BODY EXPOSURE REPORT ANNUAL REACTOR COOLANT SPECIFIC ACTIVITY REPORT Attachment 1 Annual Whole Body Exposure Report Distribution of Doses Summary (NRC5.dst)
SURRY POWER STATION UNITS 1 AND 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATION VIRGINIA ELECTRIC AND POWER COMPANY NRC5.dst 04/10/2012 File: A:\NRC5.DAT License No.: DPR-32 Licensee Name: SURRY POWER STATION Contact Person: DUANE BOONE Associated Licenses:
DPR-37,SNM-2501 Number TEDE No measurable exp. 3678 0.000 Meas. -0.100 777 29.089 0.100 -0.250 231 37.217 0.250 -0.500 90 30.905 0.500 -0.750 15 8.680 0.750 -1.000 5 4.080 1.000 -2.000 3 3.747 2.000 -3.000 0 0.000 3.000 -4.000 0 0.000 4.000 -5.000 0 0.000 5.000 -6.000 0 0.000 6.000 -7.000 0 0.000 7.000 -8.000 0 0.000 B.000 -9.000 0 0.000 3.000 -10.00 0 0.000 10.00 -11.00 0 0.000 11.00 -12.00 0 0.000> 12.00 0 0.000 qumber with Measurable:
1121 rotal Monitored:
4799 rotal collective TEDE (rem): 113.718 Fotal CDE: 0.000 rotal CEDE: 0.000 qumber of Intake Records: 0 validation Status: Errors: 0 farnings: