ML16248A003

From kanterella
Revision as of 22:31, 2 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation
ML16248A003
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/16/2016
From: Gibson L K
Japan Lessons-Learned Division
To: Gardner P A
Northern States Power Company, Minnesota
Shared Package
ML16248A004 List:
References
CAC MF7712
Download: ML16248A003 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON , D.C. 20555-0001 Mr. Peter A. Gardner Site Vice President September 16 , 2016 Northern States Power Company -Minnesota Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT -INTERIM STAFF RESPONSE TO REEVALUATED FLOOD HAZARDS SUBMITTED IN RESPONSE TO 10 CFR 50.54(f) INFORMATION REQUEST-CAUSING MECHANISM REEVALUATION (CAC NO. MF7712)

Dear Mr. Gardner:

The purpose of this letter is to provide a summary of the U.S. Nuclear Regulatory Commission (NRC) staff's assessment of the reevaluated flood-causing mechanisms described in the May 12, 2016 (Agencywide Document Access and Management System (ADAMS) Accession No. ML 16145A233), flood hazard reevaluation report (FHRR) submitted by Northern States Power Company, a Minnesota corporation (the licensee), doing business as Xcel Energy, for Monticello Nuclear Generating Plant (Monticello), as well as supplemental information resulting from the NRC's audit of the FHRR. By letter dated March 12 , 2012, the NRC issued a request for information pursuant to Title 1 O of the Code of Federal Regulations, Section 50.54(f) (hereafter referred to as the 50.54(f) letter) (ADAMS Accession No. ML 12053A340). The request was issued as part of implementing lessons learned from the accident at the Fukushima Dai-ichi nuclear power plant. Enclosure 2 to the 50.54(f) letter requested licensees to reevaluate flood-causing mechanisms using present-day methodologies and guidance.

Concurrent with the reevaluation of flooding hazards, licensees were required to develop and implement mitigating strategies in accordance with NRC Order EA-12-049, "Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML 12054A735).

On March 30, 2015, the Commission provided the staff requirements memoranda (SAM) (ADAMS Accession No. ML 15089A236}

to COMSECY-14-0037, "Integration of Mitigating Strategies for Beyond-Design-Basis External Events and the Reevaluation of Flooding Hazards,

dated November 21, 2014 (ADAMS Accession No. ML 14309A256), affirming that licensees need to address the reevaluated flooding hazards within their mitigating strategies for beyond-design-basis external events. The NRC staff has reviewed the information submitted by the licensee and has summarized the results of the NRC's review in the tables provided as an enclosure to this letter. Table 1 provides the current design-basis flood hazard mechanisms.

Table 2 provides reevaluated P. Gardner flood hazard mechanisms; however , reevaluated hazard mechanisms bounded by the current design-basis (Table 1) are not included. The NRC staff has concluded that the licensee's reevaluated flood hazards information , as summarized i n the enclosure , is suitable for the assessment of mitigating strategies developed in response to Order EA-12-049 (i.e., def i nes the mitigating strategies flood hazard informat i on described in guidance documents currently being finalized by the industry and NRC staff) for Monticello. Further , the NRC staff has conc l uded that the li censee's r eevaluated flood hazard information is a suitable input for other assessments associated with Near-Term Task Force Recommendation 2.1 , " Flooding." The NRC staff plans to i ssue a sta f f assessment documenting the basis for these conclusions at a later time. Revision 2 of Nuclear Energy Institute (NEI) 12-06 includes a methodology to perform a mitigating strategies assessment (MSA) with respect to the reevaluated flood hazards. On February 29 , 2016 , the NRC staff published Japan Lessons-Learned Division (JLD)

Interim Staff Guidance (ISG) JLD-ISG-2012-01 , Revision 1 , " Compliance with Order EA-12-049 , Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-DesignBasis External Events" (ADAMS Accession No. ML 15357A142) in the Federal Register (81 FR 10283). This ISG endorses Revision 2 of NEI 12-06 (ADAMS Accession No. ML 16005A625), dated December 2015. Based on the guidance provided in Revision 2 of NEI 12-06, flood event duration parameters and applicable flood associated effects should be considered as part of the MSA. The NRC staff will evaluate the flood event duration parameters (including warning time and period of inundation) and flood-related associated effects developed by the licensee during the NRC's review of the MSA. As stated above , Table 2 of the enclosure to this letter describes the reevaluated flood hazards that exceed the current design-basis. In order to complete its response to the information requested by Enclosure 2 to the 50.54(f) letter , the licensee i s expected to submit an integrated assessment or a focused evaluation, as appropriate, to address these reevaluated flood hazards , as described in the NRC letter , " Coordination of Request for Information Regarding Flooding Hazard Reevaluation and Mitigating Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML 15174A257).

This letter describes the changes in the NRC's approach to the flood hazard reevaluations that were approved by the Comm i ssion in its SRM to COMSECY-15-0019 , " Closure Plan for the Reevaluation of F looding Hazards for Operating Nuclear Power Plants" (ADAMS Accession No. ML 15209A682).

P. Gardner If you have any questions, please contact me at (301) 415-1056 or e-mail at Lauren.Gibson@nrc.gov. Docket No. 50-263

Enclosure:

Summary of Results of Flooding Hazard Re-Evaluation Report cc w/encl: Distribution via Listserv Sincerely , Lauren K. Gibson , Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation ENCLOSURE:

SUMMARY

TABLES OF REEVALUATED FLOOD HAZARD LEVELS Monticello Nuclea r Generating Plant , Un it 1 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Local Intense Precipitation Streams and Rivers M i ssiss i ppi River Probable Maximum Precipitation Failure of Dams and Onsite Water Control/Storage Structures Storm Surge Seiche Tsunam i Ice-Induced Flooding Channel Migrations/Diversions Stillwater Elevation Not included in DB 939.2 ft NGVD29 Not included in DB Not included in DB Waves/ Run up Not inclu ded i n DB Not applicable I ; Not inclu ded i n DB Not included i n DB Design Basis I Hazard Elevation Not inclu ded in DB 939.2 ft NGVD29 Not inclu ded in DB Not inclu ded in DB Not included No t i ncluded Not included in DB in DB i n DB Not included

  • Not in cluded Not incl uded in DB in DB in DB No Impact on the Site Identified No Impact on the Site Identified No Impact on the Site Identified Not in c luded ! N ot included N ot inclu d ed in DB ' in DB in DB Note 1: Reported values are rounded to the nearest one-tenth of a foot. Reference FHRR Section 1.5, 2.1.3 & Table 5 FHRR Section 1.5.1 FHRR Section 1.5 FHRR Sectio n 1.5 FHRR Sect ion 1.5 FHRR Section 1.5 FHRR Section 1.5.2 FHRR Section 1.5 M o nti ce llo N u cle ar Ge n e r a tin g Plant , Un it 1 Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism Stillwater Waves! Reevaluated Reference Elevation Run up Hazard Elevation Local Intense Precipitation 935.8 ft Minimal 935.8 ft FHRR Section 2.1.2 & Tables 5 and 6 NGVD29 NGVD29 Note 1: The licensee is expected to develop flood event duration parameters and applicable flood associated effects to conduct the MSA. The staff will evaluate the flood event duration parameters (including warning time and period of i nund ation) and flood associated effects during its review o f the MSA. Note 2: Reevaluated hazard mechanisms bounded by the current design basis (see Tab l e 1) are not included i n this table Note 3: Reported values are rounded to the nearest one-tenth of a foot.

P. Gardner If you have any questions , please contact me at (301) 415-1056 or e-mail at Lauren.G i bson@n r c.gov. Docket No. 50-263

Enclosure:

Sincerely , /RAJ Lauren K. Gibson, Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Summary of Results of Flooding Hazard Re-Evaluation Report cc w/encl: Distribution via Listserv DISTRIBUTION

PUBLIC L Gibson , NRR R i dsNr r Dorllpl3-1 Resource R i dsRgn3MailCenter Resource RidsOpaMa i l Resource AR i vera-Varona , NRO PChaput , NRO MShams , NRR JLD R/F LQuinn-Willingham , NRO RidsNrrDorl Resource RidsNrrLASLent R i dsAcrsAcnw_MailCtr Resource KErwin , NRO RRivera-Lugo , NRO RidsNRRJLD Resou r ce RidsNroDsea Resource RidsNrrPMMonticello Resource RidsOgcMailCenter Resource CCook , NRO ACampbell , NRO BHarvey , NRO ADAMS Accession Nos.: PKG ML16248A004
LTR
ML16248A003; ENCL: ML16245A720
  • via email OFFICE NRR/JLD/JHMB/PM NRR/JLD/LA NRO/DSEA/RHM2/TR
  • NRO/DSEA/RHM2/BC* NAME LKGibson Slent PChaput AR i veraVarona DATE 09/13/2016 09/ 9 /2016 09/1/2016 09/1/2016 OFFICE NRR/JLD/JHMB/BC (A) NRR/JLD/JHMB/PM NAME GBowman LKGibson DATE 09/ 15/2016 09/1612016 OFFICIAL RECORD COPY