Fifth Interval Inservice Inspection Plan
ML14202A009
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/15/2014
From: Batson S L
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14202A008 List:
References
ONS-2014-098
Download: ML14202A009 (2)


Text

DUKE Scott L. Batson Vice President ENERGY, Oconee Nuclear Station Duke Energy ON01VP I 7800 Rochester Hwy Seneca, SC 29672 o: 864.873.3274 f 864.873. 4208 ONS-2014-098 Scott.Batson@duke-energy.com July 15, 2014 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Duke Energy Carolinas, LLC (Duke Energy)Oconee Nuclear Station, Units 1, 2, and 3 Docket Numbers 50-269, -270, -287 Fifth Interval Inservice Inspection Plan Pursuant to 10 CFR 50.55a(g)(4), Duke Energy submits the Oconee Nuclear Station, Unit 1, 2, and 3, Inservice Inspection (ISI) Plan for the Fifth Inservice Inspection Interval applicable to Class 1, 2, and 3 components and component supports.

The Oconee Nuclear Station, Unit 1, 2, and 3 Fifth Interval ISI Plan has been developed in accordance with the requirements of the ASME Boiler and Pressure Vessel Code, Section Xl, 2007 Edition with the 2008 Addenda.Please see enclosed attachments for Oconee Fifth Interval Inservice Inspection Plans: A) The Inservice Inspection Plan and B) The Inservice Inspection Pressure Test Plan.The Oconee Nuclear Station, Unit 1, 2, and 3 ISI Plan for the fifth interval excludes requirements for examination of Class MC and CC components and steam generator tubing, which are maintained under separate programs.If you have any questions or require additional information, please contact Chris Wasik, Regulatory Affairs Manager, at (864) 873-5789.Sincerely, Scott L. Batson Vice President Oconee Nuclear Station Attachments:

A) Oconee Nuclear Station Fifth Interval Inservice Inspection Plan B) Oconee Nuclear Station Fifth Inspection Interval Inservice Inspection Pressure Test Plan www.duke-energy.com U. S. Nuclear Regulatory Commission July 15, 2014 Page 2 cc: Mr, Victor McCree, Regional Administrator U.S. Nuclear Regulatory Commission

-Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Mr, James R. Hall, Project Manager (ONS)(by electronic mail only)U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop O-8G9A Rockville, MD 20852 Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station