Proposed Amendment to Extend Local Power Range Monitor Calibration Interval (TAC Nos. MD3717 and MD3718)
ML073410607
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/14/2007
From: Hughey J D
NRC/NRR/ADRO/DORL/LPLI-2
To: Pardee C G
Exelon Generation Co
Hughey J D, NRR/DORL, 301-415-3204
References
TAC MD3717, TAC MD3718
Download: ML073410607 (4)


Text

December 14, 2007

Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - PROPOSED AMENDMENT TO EXTEND LOCAL POWER RANGE MONITOR CALIBRATION INTERVAL (TAC NOS. MD3717 AND MD3718)

Dear Mr. Pardee:

By letter dated November 17, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML063380360), as supplemented by letter dated September 21, 2007 (ADAMS Accession No. ML072640607), Exelon Generation Company, LLC (Exelon) requested to amend the Technical Specifications, Appendix A, of Renewed Facility Operating License numbers DPR-44 and DPR-56 for Peach Bottom Atomic Power Station, Units 2 and 3. The requested amendments would increase the interval between local power range monitor calibrations from 1000 megawatt-days/ton (MWD/T) to 2000 MWD/T. Per discussions between Nuclear Regulatory Commission (NRC) staff and Ms. Pamela Cowan and other Exelon staff on December 6, 2007, Exelon has proposed to provide a supplement to the NRC related to the November 17, 2006, amendment request. Exelon staff stated that this supplemental information will be provided to the NRC by December 21, 2007.

Please note that if you do not respond to this letter within the prescribed response times or provide an acceptable alternate date in writing, we may reject your application for amendment under the provisions of Title 10 of the Code of Federal Regulations, Section 2.108. If you have any questions, I can be reached at (301) 415-3204.

Sincerely

/ra/ John D. Hughey, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278

cc: See next page

ML072640607), Exelon Generation Company, LLC (Exelon) requested to amend the Technical Specifications, Appendix A, of Renewed Facility Operating License numbers DPR-44 and DPR-56 for Peach Bottom Atomic Power Station, Units 2 and 3. The requested amendments would increase the interval between local power range monitor calibrations from 1000 megawatt-days/ton (MWD/T) to 2000 MWD/T. Per discussions between Nuclear Regulatory Commission (NRC) staff and Ms. Pamela Cowan and other Exelon staff on December 6, 2007, Exelon has proposed to provide a supplement to the NRC related to the November 17, 2006, amendment request. Exelon staff stated that this supplemental information will be provided to the NRC by December 21, 2007.

Please note that if you do not respond to this letter within the prescribed response times or provide an acceptable alternate date in writing, we may reject your application for amendment under the provisions of Title 10 of the Code of Federal Regulations, Section 2.108. If you have any questions, I can be reached at (301) 415-3204.

Sincerely

/ra/ John D. Hughey, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket Nos. 50-277 and 50-278

cc: See next page

DISTRIBUTION

PUBLIC LPLI-2 R/F RidsNrrPMJHughey RidsNrrLAABaxter RidsRgn1MailCenter RidsNrrDorlLpl1-2 RigsOgcRp RidsAcrsAcnwMailCenter RidsNrrDorlDpr

ADAMS Accession Number: ML073410607 OFFICE LPL1-2/PM LPL1-2/LA LPL1-2/BC NAME JHughey ABaxter HChernoff DATE 12/10/2007 12/10/2007 12/14/2007 Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 cc:

Site Vice President Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314

Plant Manager Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314

Regulatory Assurance Manager Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road

Delta, PA 17314

Resident Inspector U.S. Nuclear Regulatory Commission Peach Bottom Atomic Power Station P.O. Box 399

Delta, PA 17314

Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road

King of Prussia, PA 19406

Mr. Roland Fletcher Department of Environment Radiological Health Program 2400 Broening Highway

Baltimore, MD 21224

Correspondence Control Desk Exelon Generation Company, LLC P. O. Box 160 Kennett Square, PA 19348

Director, Bureau of Radiation Protection Pennsylvania Department of Environmental Protection

Rachel Carson State Office Building P.O. Box 8469

Harrisburg, PA 17105-8469

Board of Supervisors

Peach Bottom Township 545 Broad Street Ext.

Delta, PA 17314-9203

Mr. Richard McLean

Power Plant and Environmental Review Division Department of Natural Resources B-3, Tawes State Office Building Annapolis, MD 21401

Dr. Judith Johnsrud National Energy Committee Sierra Club

433 Orlando Avenue

State College, PA 16803

Manager-Financial Control & Co-Owner Affairs Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, NJ 08038-0236

Manager Licensing-Peach Bottom Atomic Power Station Exelon Generation Company, LLC 200 Exelon Way, KSA -3E

Kennett Square, PA 19348

Vice President - Licensing and Regulatory Affairs Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555 Vice President-Operations Mid-Atlantic Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N

Kennett Square, PA 19348 Associate General Counsel Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555 Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 cc: Director-Licensing and Regulatory Affairs Exelon Generation Company, LLC 200 Exelon Way, KSA 3-E