MONTHYEARML23317A2012023-11-22022 November 2023 (External_Sender) Supplement - Byron Security Rule Exemption Request ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23305A2992023-11-0101 November 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 2, Relief Request I4R-24 ML23304A0202023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Byron 1 & 2 - Exemption from Security Rule (L-2023-LLE-0027) ML23272A0602023-09-29029 September 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 1, Relief Request I4R-25 ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22284A1022022-10-0606 October 2022 NRR E-mail Capture - NRC Acceptance Review for Byron, Unit 2, License Amendment Request (LAR) to Reinsert an Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) (L-2022-LLA-0131) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML23089A0152022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Byron - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21272A1492021-09-29029 September 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron - Proposed Alternative for Examinations of Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21203A3112021-07-21021 July 2021 NRR E-mail Capture - Final Byron Permanently Defueled Technical Specifications (PDTS) - Second Round RAI ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21189A1612021-07-0808 July 2021 NRR E-mail Capture - Second Round Request for Additional Information - Byron Permanently Defueled Technical Specification Amendment ML21154A0172021-06-0202 June 2021 NRR E-mail Capture - Acceptance Review of Byron - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21123A2442021-05-0303 May 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood/Byron/Ginna - Application to Address the Issues Identified in Westinghouse Documents NSAL-09-5 and NSAL-15-1 (L-2021-LLA-0066) ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21081A0792021-03-19019 March 2021 Acceptance Review for Byron Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation ML21081A0972021-03-19019 March 2021 Acceptance Review for Byron Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis-External Events (EPID L-2021-JLD-0004) (E-mail) ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21036A1102021-02-0404 February 2021 NRR E-mail Capture - Draft RAIs for Byron Station, Unit Nos. 1 and 2, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21033A5372021-02-0101 February 2021 Email transmission- 01-29-2021, FEMA Letter to Governor of Commonwealth of PA Regarding Implementation of TMI EP Exemptions ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML21004A1452020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Relief Requests Braidwood I4R-11 and Byron I4R-18 2023-09-29
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23297A2352023-10-26026 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection ML23209A7242023-07-31031 July 2023 Request for Information on the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000454/2024010 and 05000455/2024010 ML23198A0372023-07-17017 July 2023 Information Request to Support Upcoming Problem Identification and Resolution (PIR) Inspection at Byron Nuclear Plant ML23172A1172023-06-22022 June 2023 Notification of NRC Fire Protection Team Inspection Request for Information ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23069A0342023-03-0606 March 2023 Unit 1 Lr Commitment 10 RAI Set 1 - (Non-Proprietary) ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML22237A0272022-08-25025 August 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22116A1272022-04-26026 April 2022 Unit 2 RFI for an NRC Triennial Heat Exchanger/Sink Performance Inspection and RFI IR 05000454/2022002 05000455/2022002 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML21273A3312021-10-0404 October 2021 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Byron Station ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21203A3112021-07-21021 July 2021 NRR E-mail Capture - Final Byron Permanently Defueled Technical Specifications (PDTS) - Second Round RAI ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21189A1612021-07-0808 July 2021 NRR E-mail Capture - Second Round Request for Additional Information - Byron Permanently Defueled Technical Specification Amendment ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21036A1102021-02-0404 February 2021 NRR E-mail Capture - Draft RAIs for Byron Station, Unit Nos. 1 and 2, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML21004A1452020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Relief Requests Braidwood I4R-11 and Byron I4R-18 ML20329A4852020-11-24024 November 2020 Notification of NRC Fire Protection Team Inspection Request for Information ML20294A5492020-10-21021 October 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML20289A1142020-10-0909 October 2020 NRR E-mail Capture - Preliminary RAIs for LAR Regarding Non-conservative TS EDG Frequency Tolerance ML20077M2212020-03-20020 March 2020 Ti 2515/194 Inspection Documentation Request ML20008D3992020-01-0808 January 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000454/2020001 ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19252C1542019-08-22022 August 2019 NRR E-mail Capture - Issuance of the Remainder of Preliminary RAIs for Braidwood/Byron TSTF-505 Application ML19232A2242019-08-0707 August 2019 NRR E-mail Capture - Partial Issuance of Final RAIs for Braidwood/Byron TSTF-505 Application ML19207A0672019-07-26026 July 2019 NRR E-mail Capture - Partial Issuance of Preliminary RAIs for Braidwood/Byron TSTF-505 Application ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML19032A1062019-02-0101 February 2019 NRR E-mail Capture - Preliminary RAIs for Byron On--time Extension of Completion Time 3.8.1, A.2 ML19011A3452019-01-11011 January 2019 NRR E-mail Capture - Preliminary RAIs Regarding Byron Request to Use ATF LTAs ML18149A2842018-05-24024 May 2018 NRR E-mail Capture - B/B 50.69 RAI - Potential Typo ML18129A1082018-05-0909 May 2018 NRR E-mail Capture - Preliminary RAIs for Braidwood and Byron Stations 50.69 Amendment ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML18022A0422018-01-19019 January 2018 18 Byron Station, Units 1 and 2 - Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection (DRS-I.Hafeez) ML17179A2852017-06-28028 June 2017 NRR E-mail Capture - Request for Additional Information Regarding Braidwood and Byron Amendments to Remove Obsolete License and Technical Specification Items ML17159A6292017-06-0707 June 2017 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML17137A0562017-05-17017 May 2017 Information Request to Support Upcoming Temporary Instruction 191 Inspection at Byron Station, Units 1 and 2 ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML17019A2022017-01-19019 January 2017 NRR E-mail Capture - Preliminary RAIs for Byron Station TORMIS License Application Request ML16355A0322016-12-19019 December 2016 Notification of NRC Inspection and Request for Information (Msh) ML16343A2522016-12-0808 December 2016 NRR E-mail Capture - Preliminary Request for Additional Information (RAI) Regarding Relief Request I4R-10 ML16196A1102016-07-14014 July 2016 Notification of NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000454/2016004; 05000455/2016004 2023-07-31
[Table view] |
Text
From: DiFrancesco, Nicholas Sent: Saturday, April 09, 2011 7:19 PM To: 'Richard.McIntosh@exeloncorp.com' Cc: Carlson, Robert; Lupold, Timothy; Wohl, Marilyn; Lisa.Schofield@exeloncorp.com; jeff.hansen@exeloncorp.com
Subject:
Byron Station, Unit No. 1 - Request for Additional Information Re: Relief Request I3R-19 (TAC Nos. ME5877, ME5948, AND ME5961)
Mr. McIntosh, By letter dated March 24, 2011, as supplemented by letters dated March 25 and 31, 2011 (Agencywide Documents Access and Management Systems (ADAMS) Accession No. ML110830837, ML110870236, ML110910156, respectively ), Exelon Generation Company, LCC (EGC, the licensee) submitted a relief request (RR) for Byron Station, Unit No. 1. The RR proposed an alternative to certain American Society of Mechanical Engineer's Boiler and Pressure Vessel Code requirements to use an imbedding seal weld methodology on the reactor vessel head penetration (VHP) housing and J-groove welds. EGC by letter dated April 8, 2011, requested use of additional alternatives from the ASME code requirements to repair mechanical discontinuities in the seal welds associated with repair of reactor VHP nozzles 31 and 64.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete its review. The specific information requested is contained in the Request for Additional Information (RAI) below. Your staff has agreed to provide a response to the RAI by 9:00 AM EST on April 10, 2011.
The NRC staff considers that timely responses to RAls help ensure sufficient time is available for NRC staff review and contribute toward the NRC's goal of efficient and effective use of its staff resources. If circumstances result in the need to revise the requested response date, please contact me.
Sincerely, Nicholas DiFrancesco
Project Manager - Braidwood, Byron, and Clinton U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Operating Reactor Licensing nicholas.difrancesco@nrc.gov l Tel: (301) 415-1115
REQUEST FOR ADDITIONAL INFORMATION REQUEST FOR RELIEF FROM ASME CODE REQUIREMENTS FOR REPAIR OF REACTOR VESSEL HEAD PENETRATION NUMBERS 64 AND 76 (ME5877)
REPAIR OF REACTOR VESSEL HEAD PENETRATION NUMBERS 31 AND 43 (ME5948)
ALTERNATIVE FOR REPAIR OF REACTOR VESSEL HEAD PENETRATIONS (ME5961)
EXELON GENERATION COMPANY, LLC, BYRON STATION, UNIT NO. 1
DOCKET NO. 50-454 By letter dated March 24, 2011, as supplemented by letters dated March 25, 2011, March 31, 2011 and April 8, 2011, Exelon Generation Company, LCC (the licensee), proposed an alternative to certain American Society of Mechanical Engineer's Boiler and Pressure Vessel Code requirements for Byron Station, Unit 1. The requirements pertain to the repair of the reactor pressure vessel upper head penetration nozzle numbers 31, 43, 64 and 76 and future defects that may be identified at Byron Station, Unit No. 1. The duration of request is for the third 10-year inservice inspection (ISI) interval.
The NRC staff has reviewed and evaluated the information provided by the licensee and has determined that the following information is needed in order to complete its review of the relief request. RAI-1: By letter dated March 25, 2011, the licensee noted for penetration nozzle number 64 the following; For the ISI NDE of the repair for Penetrations 64 and 76 starting with refueling outage B1 R18, Note 3 does not apply since the repair location is in the "VHP Nozzle OD below J-groove weld." Therefore, ISI NDE of the repair for Penetrations 64 and 76 will be performed in accordance with Code Case N-729-1, as amended by 10 CFR 50.55a(g)(6)(ii)(D).
By letter dated April 8, 2011, the licensee requests relief from NB-4450 for the repair of six rejectable liquid dye penetration surface indications in the seal weld of head penetration nozzle number 64.
The Table of Item 3 of Section 5.0, "Conditions and Limitations" of Reference 2 of the March 24, 2011 submittal requires only a volumetric or surface examination for the ISI inspection of a penetration with a flaw in the nozzle below the J-groove weld.
In addition to the volumetric examination of the nozzle, will a surface examination be performed on wetted surface of the entire seal weld for penetration number 64 at the same frequency requirement of the volumetric examination of penetration number 64 in accordance with 10 CFR 50.55a(g)(6)(ii)(D)?
RAI-2: For all unacceptable linear indications in the seal weld, provide each new second seal weld's minimum area of coverage? Will this area of coverage be based on a distance beyond each indication's dye penetrant length and width result? Provide a description of application and the number of the weld beads applied to address Indications #2 and #3 of Penetration number 31.