MONTHYEARML23317A2012023-11-22022 November 2023 (External_Sender) Supplement - Byron Security Rule Exemption Request ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23305A2992023-11-0101 November 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 2, Relief Request I4R-24 ML23304A0202023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Byron 1 & 2 - Exemption from Security Rule (L-2023-LLE-0027) ML23272A0602023-09-29029 September 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 1, Relief Request I4R-25 ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22284A1022022-10-0606 October 2022 NRR E-mail Capture - NRC Acceptance Review for Byron, Unit 2, License Amendment Request (LAR) to Reinsert an Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) (L-2022-LLA-0131) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML23089A0152022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Byron - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21272A1492021-09-29029 September 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron - Proposed Alternative for Examinations of Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21203A3112021-07-21021 July 2021 NRR E-mail Capture - Final Byron Permanently Defueled Technical Specifications (PDTS) - Second Round RAI ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21189A1612021-07-0808 July 2021 NRR E-mail Capture - Second Round Request for Additional Information - Byron Permanently Defueled Technical Specification Amendment ML21154A0172021-06-0202 June 2021 NRR E-mail Capture - Acceptance Review of Byron - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21123A2442021-05-0303 May 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood/Byron/Ginna - Application to Address the Issues Identified in Westinghouse Documents NSAL-09-5 and NSAL-15-1 (L-2021-LLA-0066) ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21081A0792021-03-19019 March 2021 Acceptance Review for Byron Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation ML21081A0972021-03-19019 March 2021 Acceptance Review for Byron Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis-External Events (EPID L-2021-JLD-0004) (E-mail) ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21036A1102021-02-0404 February 2021 NRR E-mail Capture - Draft RAIs for Byron Station, Unit Nos. 1 and 2, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21033A5372021-02-0101 February 2021 Email transmission- 01-29-2021, FEMA Letter to Governor of Commonwealth of PA Regarding Implementation of TMI EP Exemptions ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML21004A1452020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Relief Requests Braidwood I4R-11 and Byron I4R-18 2023-09-29
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23297A2352023-10-26026 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection ML23209A7242023-07-31031 July 2023 Request for Information on the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000454/2024010 and 05000455/2024010 ML23198A0372023-07-17017 July 2023 Information Request to Support Upcoming Problem Identification and Resolution (PIR) Inspection at Byron Nuclear Plant ML23172A1172023-06-22022 June 2023 Notification of NRC Fire Protection Team Inspection Request for Information ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23069A0342023-03-0606 March 2023 Unit 1 Lr Commitment 10 RAI Set 1 - (Non-Proprietary) ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML22237A0272022-08-25025 August 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22116A1272022-04-26026 April 2022 Unit 2 RFI for an NRC Triennial Heat Exchanger/Sink Performance Inspection and RFI IR 05000454/2022002 05000455/2022002 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML21273A3312021-10-0404 October 2021 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Byron Station ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21203A3112021-07-21021 July 2021 NRR E-mail Capture - Final Byron Permanently Defueled Technical Specifications (PDTS) - Second Round RAI ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21189A1612021-07-0808 July 2021 NRR E-mail Capture - Second Round Request for Additional Information - Byron Permanently Defueled Technical Specification Amendment ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21036A1102021-02-0404 February 2021 NRR E-mail Capture - Draft RAIs for Byron Station, Unit Nos. 1 and 2, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML21004A1452020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Relief Requests Braidwood I4R-11 and Byron I4R-18 ML20329A4852020-11-24024 November 2020 Notification of NRC Fire Protection Team Inspection Request for Information ML20294A5492020-10-21021 October 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML20289A1142020-10-0909 October 2020 NRR E-mail Capture - Preliminary RAIs for LAR Regarding Non-conservative TS EDG Frequency Tolerance ML20077M2212020-03-20020 March 2020 Ti 2515/194 Inspection Documentation Request ML20008D3992020-01-0808 January 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000454/2020001 ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19252C1542019-08-22022 August 2019 NRR E-mail Capture - Issuance of the Remainder of Preliminary RAIs for Braidwood/Byron TSTF-505 Application ML19232A2242019-08-0707 August 2019 NRR E-mail Capture - Partial Issuance of Final RAIs for Braidwood/Byron TSTF-505 Application ML19207A0672019-07-26026 July 2019 NRR E-mail Capture - Partial Issuance of Preliminary RAIs for Braidwood/Byron TSTF-505 Application ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML19032A1062019-02-0101 February 2019 NRR E-mail Capture - Preliminary RAIs for Byron On--time Extension of Completion Time 3.8.1, A.2 ML19011A3452019-01-11011 January 2019 NRR E-mail Capture - Preliminary RAIs Regarding Byron Request to Use ATF LTAs ML18149A2842018-05-24024 May 2018 NRR E-mail Capture - B/B 50.69 RAI - Potential Typo ML18129A1082018-05-0909 May 2018 NRR E-mail Capture - Preliminary RAIs for Braidwood and Byron Stations 50.69 Amendment ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML18022A0422018-01-19019 January 2018 18 Byron Station, Units 1 and 2 - Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection (DRS-I.Hafeez) ML17179A2852017-06-28028 June 2017 NRR E-mail Capture - Request for Additional Information Regarding Braidwood and Byron Amendments to Remove Obsolete License and Technical Specification Items ML17159A6292017-06-0707 June 2017 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML17137A0562017-05-17017 May 2017 Information Request to Support Upcoming Temporary Instruction 191 Inspection at Byron Station, Units 1 and 2 ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML17019A2022017-01-19019 January 2017 NRR E-mail Capture - Preliminary RAIs for Byron Station TORMIS License Application Request ML16355A0322016-12-19019 December 2016 Notification of NRC Inspection and Request for Information (Msh) ML16343A2522016-12-0808 December 2016 NRR E-mail Capture - Preliminary Request for Additional Information (RAI) Regarding Relief Request I4R-10 ML16196A1102016-07-14014 July 2016 Notification of NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000454/2016004; 05000455/2016004 2023-07-31
[Table view] |
Text
NRR-PMDAPEm Resource From: Wiebe, Joel Sent: Thursday, January 19, 2017 10:59 AM To: Joseph Bauer
Subject:
Preliminary RAIs for Byron Station TORMIS License Application Request The purpose of preliminary RAIs is to ensure the RAIs are clear and understandable. The NRC staff requests a teleconference to discuss the RAIs within two weeks of this e-mail. Let me know when you are ready to discuss the RAIs.
In reviewing the Exelon Generation Company, LLC (Exelons) submittal dated October 7, 2016, related to use of the TORMIS methodology for the Byron Station (Byron), Unit Nos. 1 and 2, the NRC staff has determined that the following information is needed in order to complete its review:
RAI 1 (DSS): The licensees LAR references Regulatory Information Summary (RIS) 2008-14, Use of the TORMIS Computer Code for Assessment of Tornado Missile Protection, which includes reference to the 1983 TORMIS safety evaluation report (SER) (ADAMS Accession No. ML080870291). One of the five review points in the TORMIS SER describes that tornado characteristics should be employed for both broad regions and small areas around the site and most conservative values used. Based on tornado occurrence information in Byron Updated Final Safety Analysis Report (UFSAR) Section 2.3.1.2.2, the probability of a tornado occurring within the one-degree square in which the Byron Station site is located is 21.0 E-04 per year. The UFSAR indicates, annual tornado probability for the Byron site area should be expressed as being in the range of
.0010 to .0020, with a tornado return period of about 500 to 1000 years.
The LAR specifies a total of 3,289 tornadoes were reported in the 64 year period (i.e., 1950-2013) and calculates mean unadjusted occurrence rate of 3.11E-04 tornadoes / square mile / year. A correction for annual reporting trend is part of the TORMIS methodology and the adjusted occurrence rate to reflect the sub-region reporting trends is 3.58E04 tornadoes / square mile / year. The LAR does not provide justification for the information above representing conservative values, nor does the UFSAR markup provided in the LAR indicate that prior information was updated to include new tornado frequency data that will represent new licensing basis information.
Provide a discussion on how these values were derived to represent the most conservative tornado frequency characteristics for both broad and small areas around the plant, including whether the values used are bounding and most conservative or justify accordingly. Also, provide a markup of the UFSAR to indicate changes in tornado frequency represented by the new methodology.
RAI 2 (DSS): UFSAR 2.3.1.2.2 and UFSAR 3.3.1.1 indicate the vertical velocity distribution and gust factors employed for the wind velocities are in accordance with ANSI A58.1-1972. A footnote to UFSAR Table 3.5-4 specifies vertical impact velocities are taken equal to 80% of the horizontal impact velocities. UFSAR 3.5.2 states, The fans and motors are not protected from vertical or near vertical missiles.
It is unclear whether vertical missiles were addressed in TORMIS analysis.
Provide discussion on how vertical missiles are addressed for unprotected components and update UFSAR to clearly define protection from vertical missiles.
RAI 3 (DSS): LAR Section 3.4.1 indicates, The results from the finite element analysis were then used to develop critical velocities for the other Byron Station TORMIS missiles. For these selected targets, damage is evaluated by comparing the missile velocity to the damage threshold velocity for the particular missile type and target group. If the missile velocity meets or exceeds the damage threshold velocity, it is scored as damage. UFSAR Table 3.5-4 contains specific values for the licensing basis impact velocities of tornado generated missiles.
Confirm that the missile velocities, used in the finite element analysis and TORMIS, bound the impact velocities in Table 3.5-4 of UFSAR.
1
RAI 4 (DSS): One of the five review points in the TORMIS SER indicates F-scale tornado classification should be used in order to obtain conservative results. In accordance with UFSAR Section 2.3.1.2.2, the current licensing basis windspeed for the Byron Station are rotational velocity =
290 mph and maximum translational velocity = 70 mph. This is consistent with the 1974 version of RG 1.76 referenced in UFSAR Section 3.3.3.
The LAR submittal states a tornado hazard curve for Byron Station was developed and the EF-scale wind speeds were used in this analysis in accordance with NUREG/CR-4461, Revision 2. The LAR further states the use of EF scale is consistent with the recently endorsed positions of NRC Regulatory Guide 1.76 that are based on NUREG/CR-4461, Revision 2. LAR Table 3.4.5-1 specifies wind speeds for EF5 tornado of 200-230 mph, which could potentially not bound the UFSAR values.
Provide details of windspeeds used in TORMIS and how they meet UFSAR licensing basis wind speeds or justify acceptability. If the intent is to update the licensing basis to incorporate the use of EF Scale and latest revision of RG 1.76, then explain how all differences in the RG revisions are addressed (i.e., missile spectrum, wind speed, faster auto, etc) and update the UFSAR accordingly.
RAI 5 (DSS): As indicated in LAR Section 3.4.6 (2a), the essential service water (SX) makeup pumps are located in the River Screen House, which is not protected against tornado missiles. For the case of a tornado impacting the river screen house, the non-safety related onsite deep well pumps are used to provide makeup water. The safety related power supply for the deep well pumps is described in UFSAR Section 9.2.5.2.3 and describe specific defense in depth credit for flooding only. The capability for the deep well pumps to provide tornado event SX makeup to the UHS is discussed in UFSAR Section 9.2.5.3.1, and operational assumptions for initiation of the deep water pumps is described with other assumptions for the essential service water cooling tower (SXCT) in Section 9.2.5.3.5 (g). Further, UFSAR Section 3.5.5 appears to describe that conduit in the Auxiliary Building south wall and associated cable vaults that support operation of the deep well pumps are not protected, and are considered as part of the TORMIS analysis (on Table 3.5.17).
Confirm the piping, electrical and infrastructure of the non-safety onsite deep well pumps are adequately tornado protected to provide makeup water to function as defense in depth for SX makeup pumps. If supporting equipment or power for the deep well pumps are not protected from the effects of a tornado, describe how loss of these pumps are considered in TORMIS, and the resultant probabilities for loss of the heat sink function.
Describe why UFSAR Section 9.2.5.2.3 only credits the deep well pumps as alternate makeup for flooding scenarios, but not tornado related scenarios. Additionally, describe how the deep well pumps are credited as alternate makeup in UFSAR Section 9.2.5.3.1 for the effects from tornados if supporting equipment is not protected (as described in Table 3.5.17). Make any appropriate changes to the LAR and UFSAR, as warranted to correct information in the current UFSAR revision.
RAI 6 (DSS): RIS 2008-14 discusses that the application should consider those cases where tornado missile damage to unprotected nonsafety-related SSCs that could adversely impact safety related SSCs. The LAR describes that the unprotected non-safety related Condensate Storage Tanks (CST) and piping from the CSTs to the auxiliary feedwater (AF) pumps located in the Turbine Building are not included in the Byron TORMIS model. The safety related essential service water system is used as the backup suction source for the AF pumps if the CSTs or piping from the CSTs are damaged during a tornado event.
In the event of tornado, confirm failure of CST and secondary effects (e.g., flooding) will not adversely impact safety related SSCs.
RAI 7 (DSS): The LAR markup of UFSAR Page 3.5-23 contains a reduction in wall thickness for tornado barrier. The LAR UFSAR markup shows, The walls and roofs of structures protecting the safety-related systems and components from design-basis tornado-generated missiles are of reinforced concrete with minimum thickness of 24 (changed to 20) and 14 inches respectively. The 2
concrete used has a minimum cylinder strength of 3500 psi at 91 days. This change appears to be outside the scope of the TORMIS submittal.
Describe why this change is appropriate for consideration in this LAR.
RAI 8 (DSS): The LAR states, The peak heat input to the UHS for a post-tornado two unit shutdown event (which assumes a dual unit loss of offsite power (LOOP)) is much less than the peak heat load imposed on the UHS during a LOCA; therefore, fewer SXCT fans are needed for a post-tornado cooldown of both units; i.e., either 2 or 3 SXCT fans are needed depending on the case.
Section 9.2.5.3.1.1 of the UFSAR indicates, The accident scenarios analyzed various single active failures and assumed that one or two essential service water cooling tower cells were initially out of service.
Provide additional details on the analysis to verify only 2 SXCT fans are required to safely shutdown both units 1 & 2 during post-tornado conditions and to verify heat loading capability is adequate for post-tornado event shutdown.
RAI 9 (DSS): Table 5 of LAR shows Deepwell Enclosures as containing Elect Rm 131Z and 132Z, but does not appear to include Elect Rm 231Z and 232Z. Additionally, Table 5 of LAR contains references to tables defined as Source Table for Damage Frequency. The staff is unable to locate Table 2-3, 2-4, and 2-6 referenced in the table.
Clarify whether this reference in Table 5 means, for example, Table 2.6 or Tables 2 through 6. If applicable, provide the missing Table references, or explain what is contained in the Tables sufficiently for the staff to evaluate the information in Table 5.
RAI 10 (DSS): Section 3.5.4.4 of the UFSAR markup in the LAR appears to make changes to Braidwood specific SSCs. The LAR is specific to changes proposed to Byron.
Justify what appears to be changes to Braidwood in Section 3.5.4.4, or correct the markup to change Byron only UFSAR elements.
RAI 11 (DRA): RIS 2008-14 describes identified items that licensees should address when performing an approved TORMIS methodology per the November 29, 1983, safety evaluation report (SER) (Reference 1 in the Byron LAR). The SER found that the methodology contained in EPRI NP-2005 (Reference 5 in the Byron LAR), is an acceptable approach for demonstrating compliance with the requirements of General Design Criteria (GDC) 2. In Section 2.0 of the LAR, the licensee cites that that the proposed revision to the Byron licensing basis is based on the NRC approved methodology in EPRI NP-2005, as well as other EPRI documents (NP-768 and NP-769).
In NP-2005,Section II, Probabilistic Models and Simulation Methodology, TORMIS model treatment of a multiple reactor plant is described, specifically how to combine probabilities for a multiple reactor plant in determining the resultant damage probability. Table II-4 and Equations 34 and 35 are used to address multiple reactor targets.
Section 3.4.5 of the LAR describes how the licensee complies with the SER criteria. Item #5 of that section discusses any deviations from the TORMIS calculational approach. There is no discussion or justification referenced for difference in treating multiple unit plants as a different calculational probability, as described in the LAR Attachment 1 Tables 3.4.4-1 and 3.4.4-2, and Attachment 1 Section 4.3, where damage frequency is shown as less than 1.0 E-6 per year, per unit. Additionally, a calculated composite site damage frequency that exceeds 1.0 E-6 is shown on Tables 3.4.4-1 and 3.4.4-2. A precedent is cited with a D.C. Cook safety evaluation (Reference 12 in LAR), where a per reactor/per year result for a two unit plant was described as acceptable; however, the combination of both units probabilities remained below 1.0 E-6 for the TORMIS results, as noted in the staffs safety evaluation.
Justify how your calculation for a per unit/per year aligns with NP-2005, and whether this is a deviation from the model methodology. Additionally, provide information for calculation of the composite site damage frequency, whether that aligns with NP-2005 calculations, and why that result should not be considered for meeting the probability threshold of 1.0 E-6.
RAI 12 (DRA): RIS 2008-14 describes identified items that licensees should address when performing an approved TORMIS methodology per the November 29, 1983, safety evaluation report 3
(SER) (Reference 1 in the Byron LAR). Section 3.4.5 of the LAR describes how the licensee complies with the SER criteria In Section 4.4, Conclusions, the licensee states There are many additional aspects of the TORMIS modeling and inputs that ensure bounding and conservative results.
Clarify the meaning of this statement and relevance to additional information that is appropriate for staff review. Provide a list of the additional modeling and input parameters on this TORMIS analysis if not already included in the LAR, and evaluate these parameters per criteria listed in Section 3.4.5, RAI 13 (DRA): RIS 2008-14 describes identified items that licensees should address when performing an approved TORMIS methodology per the November 29, 1983, safety evaluation report (SER) (Reference 1 in the Byron LAR).
In Section 3.4.2, Boolean Logic Approach, the licensee states that hit and damage frequencies for groups of targets evaluated in TORMIS are commonly combined using Boolean operators ( and )
to aid in summarizing the results and understanding the effects of the system redundancies. The union () operator means that if any one of the targets is damaged in a tornado, the system is assumed to fail. The intersection () operator means that all the intersected components must be damaged in a tornado strike for the system to fail. Combinations of union and intersection operators can be put together to describe multi-component system failure logic for plant systems and subsystems.
Clarify if the calculation of any mean (cumulative) tornado missile damage probability uses any intersection () operator that requires damaging multiple targets simultaneously for establishing a damaged state. If multiple targets need to be simultaneously struck, please summarize the guidelines used to identify such groups and explain how they are modeled in TORMIS.
4
Hearing Identifier: NRR_PMDA Email Number: 3278 Mail Envelope Properties (Joel.Wiebe@nrc.gov20170119105900)
Subject:
Preliminary RAIs for Byron Station TORMIS License Application Request Sent Date: 1/19/2017 10:59:01 AM Received Date: 1/19/2017 10:59:00 AM From: Wiebe, Joel Created By: Joel.Wiebe@nrc.gov Recipients: