Category:Letter
MONTHYEARIR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System2024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24087A1962024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close IR 05000416/20220042024-03-19019 March 2024 – Amended Integrated Inspection Report 05000416/2022004 and Exercise of Enforcement Discretion ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 2024-09-09
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML21146A0182021-06-0808 June 2021 Issuance of Amendments to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML21040A2922021-03-0404 March 2021 Issuance of Amendments Adoption of TSTF 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21019A2192021-02-24024 February 2021 Issuance of Amendment No. 227 Extension of Appendix J Integrated Leakage Test Interval ML21011A0682021-02-0202 February 2021 Issuance of Amendments Adoption of TSTF 439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20101G0542020-04-15015 April 2020 Issuance of Amendment No. 224 One Cycle Extension of Appendix J Integrated Leakage Test and Drywell Bypass Test Interval (Exigent Circumstances) ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19123A0142019-06-18018 June 2019 Issuance of Amendment No. 220, Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML19094A7992019-06-11011 June 2019 Issuance of Amendment No. 219 to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-425, Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5B ML19084A2182019-05-23023 May 2019 Issuance of Amendment No. 218 to Revise Technical Specification to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control ML19025A0232019-03-12012 March 2019 Issuance of Amendment No. 216 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML18215A1962019-03-12012 March 2019 Issuance of Amendment No. 217 to Modify the Updated Safety Analysis Report to Replace Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals ML18306A5132018-11-30030 November 2018 Issuance of Conforming Amendment Nos. 262, 312 and 215 Transfers of Renewed Facility Operating Licenses ML17240A2322017-10-0404 October 2017 Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 213 for Administrative Name Change to Licensee South Mississippi Electric Power Association (CAC No. MF9588) ML17116A0322017-06-0707 June 2017 Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 212 to Adopt Technical Specifications Task Force-427, Allowance For Non-Technical Specification Barrier Degradation on Supported System Operability (CAC No. MF8692.) ML16243A0242016-12-0808 December 2016 Record of Decision - License Renewal Application for Grand Gulf Nuclear Station, Unit 1 ML16292A4622016-12-0101 December 2016 Renewed Facility Operating License for Grand Gulf Nuclear Station, Unit 1 ML16140A1332016-08-0404 August 2016 Issuance of Amendment Revision of Technical Specifications to Remove Inservice Testing Program and Clarify Surveillance Requirement Usage Rule Application ML16132A1942016-05-26026 May 2016 Correction to Amendment No. 207, Request for Changing Five Technical Specifications Allowable Levels ML16119A1482016-05-25025 May 2016 Issuance of Amendment No. 210 Re. Cyber Security Plan Milestone 8 Full Implementation Schedule ML16011A2472016-02-17017 February 2016 Issuance of Amendment No. 209 Revision of Technical Specifications for Containment Leak Rate Testing ML15336A2562015-12-17017 December 2015 Issuance of Amendment No. 208 Adoption of Technical Specification Task Force Traveler TSTF-522 ML15229A2192015-08-31031 August 2015 Redacted, Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus License Amendment Request ML15195A3552015-08-31031 August 2015 Issuance of Amendment Request for Changing Five Technical Specifications Allowable Values ML15180A1702015-08-31031 August 2015 Issuance of Amendment Revision to Technical Specification 5.65.B to Add Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density ML15229A2132015-08-18018 August 2015 Redacted, Issuance of Amendment Regarding Technical Specification 2.1.1.2 of Technical Specification Section 2.1.1.2, Reactor SLs (Safety Limits) ML15229A2182015-08-18018 August 2015 Redacted, Issuance of Amendment Adoption of Single Fluence Methodology ML15104A6232015-05-12012 May 2015 Issuance of Amendment Adoption of Technical Specifications Task Force Standard Technical Specifications Change Traveler TSTF-523 ML14311A4792014-12-12012 December 2014 Issuance of Amendment No. 200, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date ML14162A3782014-09-25025 September 2014 Redacted, Issuance of Amendment No. 199, Delete Operating License Condition 2.C(32), Partial Feedwater Heating, to Allow Plant to Operate with Final Feedwater Temperature Reduction at End of Fuel Cycle ML14106A1332014-06-30030 June 2014 Issuance of Amendment No. 198, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs, as Part of Consolidated Line Item Improvement Process ML13343A1092013-12-26026 December 2013 Issuance of Amendment No. 197, Revise Technical Specifications and Surveillance Requirements to Support Operation with 24-Month Fuel Cycle in Accordance with Generic Letter 91-04 ML13261A3492013-09-25025 September 2013 Issuance of Amendment No. 196, Modify Updated Final Safety Analysis Report to Revise the Methodology for Standby Service Water Passive Failure ML13261A2642013-09-25025 September 2013 Redacted Version, Issuance of Amendment No. 195, Revise Criticality Safety Analysis and Technical Specification 4.3.1, Criticality, and Delete Spent Fuel Pool Loading Criteria License Condition ML13157A0292013-08-0505 August 2013 Issuance of Amendment No. 194, Revise TS Table 3.3.6.1-1 to Support Correction of Non-Conservative Allowable Value for Primary Containment and Drywell Isolation Instrumentation ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML12240A2392012-12-0505 December 2012 Issuance of Amendment No. 192, Revise Physical Protection License Condition Related to Milestone 6 of the Cyber Security Plan Implementation ML1208601492012-05-11011 May 2012 Issuance of Amendment No. 190, Revise Technical Specification 3.1.7, Standby Liquid Control (SLC) System, to Support Use of Sodium Pentaborate Solution Enriched with Boron-10 Isotope ML1207202832012-04-20020 April 2012 Issuance of Amendment No. 189, Revise Minimum Critical Power Ratio Safety Limit in Technical Specification 2.1.1.2 for Two-Loop and Single Recirculation Loop ML1117306812011-09-12012 September 2011 Issuance of Amendment No. 187, Revise Technical Specifications to Adopt TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML1119401652011-07-27027 July 2011 Issuance of Amendment No. 186, Revise License Condition and Approval of Cyber Security Plan and Associated Implementation Schedule ML1107304022011-04-27027 April 2011 Issuance of Amendment No. 185, Revise Surveillance Requirement Notes in Technical Specifications Associated with Condensate Storage Tank Level-Low as Reflected in TSTF-493 ML0909804292009-04-13013 April 2009 Correction to Amendment No. 182, Surveillance Requirements for Diesel Generator Slow - Start Testing (MD9641) 2024-08-13
[Table view] Category:Safety Evaluation
MONTHYEARML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22007A3172022-01-18018 January 2022 1, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML21294A0672021-10-28028 October 2021 Inservice Testing Program Relief Request VRR-GGNS-2021-1, Alternative Request for Pressure Isolation Valve Testing Frequency ML21258A4082021-09-21021 September 2021 Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of Boiling Water Reactor Vessel and Internals Project Guidelines ML21146A0182021-06-0808 June 2021 Issuance of Amendments to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML21040A2922021-03-0404 March 2021 Issuance of Amendments Adoption of TSTF 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21019A2192021-02-24024 February 2021 Issuance of Amendment No. 227 Extension of Appendix J Integrated Leakage Test Interval ML21011A0682021-02-0202 February 2021 Issuance of Amendments Adoption of TSTF 439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI ML20101G0542020-04-15015 April 2020 Issuance of Amendment No. 224 One Cycle Extension of Appendix J Integrated Leakage Test and Drywell Bypass Test Interval (Exigent Circumstances) ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19266A5862019-10-11011 October 2019 Relief Request GG-ISI-023, Examination Coverage of Class 1 Piping and Vessel Welds ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19123A0142019-06-18018 June 2019 Issuance of Amendment No. 220, Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML19094A7992019-06-11011 June 2019 Issuance of Amendment No. 219 to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-425, Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5B ML19084A2182019-05-23023 May 2019 Issuance of Amendment No. 218 to Revise Technical Specification to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control ML19018A2692019-03-12012 March 2019 Safety Evaluation Input for Grand Gulf Nuclear Station Unit 1, License Amendment Request to Implement Technical Specification Task Force-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control ML19025A0232019-03-12012 March 2019 Issuance of Amendment No. 216 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML18215A1962019-03-12012 March 2019 Issuance of Amendment No. 217 to Modify the Updated Safety Analysis Report to Replace Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML17285A7942017-10-30030 October 2017 Grand Gulf Nuclear Station, Unit 1 - Relief Request GG-ISI-021 Proposing An Alternative For Fourth Ten Year Inservice Inspection Program (CAC NO. MF9752; EPID L-2017-LLR-0031) ML17240A2322017-10-0404 October 2017 Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 213 for Administrative Name Change to Licensee South Mississippi Electric Power Association (CAC No. MF9588) ML17235A5332017-08-31031 August 2017 Relief Request GG-ISI-022 to Allow Use of Later Editions and Addenda of American Society of Mechanical Engineers Code for Inservice Inspection ML17116A0322017-06-0707 June 2017 Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 212 to Adopt Technical Specifications Task Force-427, Allowance For Non-Technical Specification Barrier Degradation on Supported System Operability (CAC No. MF8692.) ML16278A0172016-10-19019 October 2016 Entergy Fleet Relief Request RR-EN-ISI-15-1, Alternative to Maintain Inservice Inspection Related to Activities to the 2001 Edition/2003 Addendum of ASME Section XI Code ML16253A3222016-09-27027 September 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16251A6202016-09-13013 September 2016 Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) ML16140A1332016-08-0404 August 2016 Issuance of Amendment Revision of Technical Specifications to Remove Inservice Testing Program and Clarify Surveillance Requirement Usage Rule Application ML16160A0922016-06-16016 June 2016 Relief Request GG-IST-2015-1 Related to the Inservice Testing Program ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16093A0282016-05-31031 May 2016 Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 ML16119A1482016-05-25025 May 2016 Issuance of Amendment No. 210 Re. Cyber Security Plan Milestone 8 Full Implementation Schedule ML16011A2472016-02-17017 February 2016 Issuance of Amendment No. 209 Revision of Technical Specifications for Containment Leak Rate Testing ML15336A2562015-12-17017 December 2015 Issuance of Amendment No. 208 Adoption of Technical Specification Task Force Traveler TSTF-522 ML15229A2192015-08-31031 August 2015 Redacted, Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus License Amendment Request ML15180A1702015-08-31031 August 2015 Issuance of Amendment Revision to Technical Specification 5.65.B to Add Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density ML15195A3552015-08-31031 August 2015 Issuance of Amendment Request for Changing Five Technical Specifications Allowable Values ML15229A2132015-08-18018 August 2015 Redacted, Issuance of Amendment Regarding Technical Specification 2.1.1.2 of Technical Specification Section 2.1.1.2, Reactor SLs (Safety Limits) ML15229A2182015-08-18018 August 2015 Redacted, Issuance of Amendment Adoption of Single Fluence Methodology ML15104A6232015-05-12012 May 2015 Issuance of Amendment Adoption of Technical Specifications Task Force Standard Technical Specifications Change Traveler TSTF-523 ML14311A4792014-12-12012 December 2014 Issuance of Amendment No. 200, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date 2024-08-13
[Table view] Category:Technical Specifications
MONTHYEARML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22073A1752022-03-0808 March 2022 Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21019A2192021-02-24024 February 2021 Issuance of Amendment No. 227 Extension of Appendix J Integrated Leakage Test Interval ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21039A3292021-01-27027 January 2021 Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML21039A2642021-01-27027 January 2021 Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML17240A2322017-10-0404 October 2017 Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 213 for Administrative Name Change to Licensee South Mississippi Electric Power Association (CAC No. MF9588) ML16011A2472016-02-17017 February 2016 Issuance of Amendment No. 209 Revision of Technical Specifications for Containment Leak Rate Testing GNRO-2015/00091, Supplemental Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications for Containment Leak Rate Testing/2015-12-10010 December 2015 Supplemental Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications for Containment Leak Rate Testing/ GNRO-2015/00077, Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF) TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours.2015-11-24024 November 2015 Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF) TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours. GNRO-2015/00037, Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing2015-09-15015 September 2015 Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing ML15180A1702015-08-31031 August 2015 Issuance of Amendment Revision to Technical Specification 5.65.B to Add Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density ML15195A3552015-08-31031 August 2015 Issuance of Amendment Request for Changing Five Technical Specifications Allowable Values ML15229A2192015-08-31031 August 2015 Redacted, Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus License Amendment Request ML15229A2132015-08-18018 August 2015 Redacted, Issuance of Amendment Regarding Technical Specification 2.1.1.2 of Technical Specification Section 2.1.1.2, Reactor SLs (Safety Limits) ML15229A2182015-08-18018 August 2015 Redacted, Issuance of Amendment Adoption of Single Fluence Methodology GNRO-2015/00059, Submits Corrected Technical Specification Pages Regarding Maximum Extended Load Line Limit Plus License Amendment Request, Dated 9/25/20132015-08-14014 August 2015 Submits Corrected Technical Specification Pages Regarding Maximum Extended Load Line Limit Plus License Amendment Request, Dated 9/25/2013 GNRO-2015/00026, Application to Revise Technical Specifications for Permanent Extension of Type C Leak Rate Testing Frequency and Reduction of Type B and C Grace Intervals2015-05-27027 May 2015 Application to Revise Technical Specifications for Permanent Extension of Type C Leak Rate Testing Frequency and Reduction of Type B and C Grace Intervals ML15104A6232015-05-12012 May 2015 Issuance of Amendment Adoption of Technical Specifications Task Force Standard Technical Specifications Change Traveler TSTF-523 GNRO-2014/00078, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month2014-12-15015 December 2014 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML14311A4792014-12-12012 December 2014 Issuance of Amendment No. 200, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date GNRO-2014/00068, License Amendment Request to Revise Technical Specification 2.1.1.22014-11-21021 November 2014 License Amendment Request to Revise Technical Specification 2.1.1.2 ML14162A3782014-09-25025 September 2014 Redacted, Issuance of Amendment No. 199, Delete Operating License Condition 2.C(32), Partial Feedwater Heating, to Allow Plant to Operate with Final Feedwater Temperature Reduction at End of Fuel Cycle ML14106A1332014-06-30030 June 2014 Issuance of Amendment No. 198, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs, as Part of Consolidated Line Item Improvement Process ML13343A1092013-12-26026 December 2013 Issuance of Amendment No. 197, Revise Technical Specifications and Surveillance Requirements to Support Operation with 24-Month Fuel Cycle in Accordance with Generic Letter 91-04 CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications GNRO-2012/00132, License Amendment Request for Revision of Technical Specification Allowable Value for Primary Containment and Drywell Isolation Instrumentation Function 3.c RCIC Steam Supply Line Pressure - Low.2012-11-0909 November 2012 License Amendment Request for Revision of Technical Specification Allowable Value for Primary Containment and Drywell Isolation Instrumentation Function 3.c RCIC Steam Supply Line Pressure - Low. GNRO-2012/00124, Response to NRC Request for Additional Information - GGNS Criticality Safety Analysis License Amendment Request2012-10-22022 October 2012 Response to NRC Request for Additional Information - GGNS Criticality Safety Analysis License Amendment Request ML1207202832012-04-20020 April 2012 Issuance of Amendment No. 189, Revise Minimum Critical Power Ratio Safety Limit in Technical Specification 2.1.1.2 for Two-Loop and Single Recirculation Loop GNRO-2012/00014, Supplemental Information Pertaining to License Amendment Request for Standby Liquid Control System2012-03-21021 March 2012 Supplemental Information Pertaining to License Amendment Request for Standby Liquid Control System GNRO-2012/00001, License Amendment Request - Standby Liquid Control System2012-01-23023 January 2012 License Amendment Request - Standby Liquid Control System GNRO-2011/00064, License Amendment Request to Revise Technical Specification 2.1.1.22011-10-28028 October 2011 License Amendment Request to Revise Technical Specification 2.1.1.2 GNRO-2011/00004, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0606 April 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. ML1026604032010-09-0808 September 2010 License Amendment Request Extended Power Uprate ML0931404632009-11-0303 November 2009 License Amendment Request Regarding Power Range Neutron Monitoring System Upgrade GNRO-2009/00042, Supplement to ENOC-09-00009, License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions, Letter Dated April 27, 20092009-07-10010 July 2009 Supplement to ENOC-09-00009, License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions, Letter Dated April 27, 2009 ML0909804292009-04-13013 April 2009 Correction to Amendment No. 182, Surveillance Requirements for Diesel Generator Slow - Start Testing (MD9641) ML0817600232008-10-14014 October 2008 Issuance of Amendment No. 178, Adoption of Technical Specifications Task Force (TSTF) Traveler No. 448, Revision 3, Control Room Envelope Habitability. GNRO-2008/00049, Supplemental No. 2 to Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability TSTF-4482008-09-0202 September 2008 Supplemental No. 2 to Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability TSTF-448 ML0724900082007-10-24024 October 2007 Technical Specifications, Issuance of Amendment No. 177 Changes to Technical Specifications Surveillance Requirement 3.3.1.1.7, the Local Power Range Monitor Calibration Frequency ML0734401152007-09-30030 September 2007 NEDC-33383, Revision 0, GEXL97 Correlation Applicable to ATRIUM-10 Fuel, (Non-Proprietary), Attachment 2 ML0721905072007-08-24024 August 2007 Tech Spec Pages for Amendment 176 Change to Technical Specifications to Allow Certain Types of Relief Valves to Be Used as Isolation Devices ML0712900082007-05-30030 May 2007 Technical Specifications, Issuance of Amendment 175 Re Technical Specifications Change Regarding Mode Change Limitations (TSTF-359) Using Consolidated Line Item Improvement Process, & Correct Example 1.4-1 (TSTF-485) ML0705306542007-03-16016 March 2007 Tech Spec Pages for Amendment No. 174 a Technical Specification Change to Allow Use of Control Rod Assemblies with Different Control Material GNRO-2007/00011, License Amendment Request, Change to Technical Specifications to Allow Certain Types of Relief Valves to Be Used as Isolation Devices2007-03-0101 March 2007 License Amendment Request, Change to Technical Specifications to Allow Certain Types of Relief Valves to Be Used as Isolation Devices 2023-12-14
[Table view] |
Text
{{#Wiki_filter:OFFICIAL USE ONLY PROPRIETARY INFORMATION Vice President, Operations Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 18, 2015
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1 -ISSUANCE OF AMENDMENT REGARDING TECHNICAL SPECIFICATION 2.1.1.2 OF TECHNICAL SPECIFICATION SECTION 2.1.1, "REACTOR CORE SLS" (TAC NO. MF5304)
Dear Sir or Madam:
The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 203 to Facility Operating License No. NPF-29 for the Grand Gulf Nuclear Station, Unit 1. This amendment consists of changes to the Technical Specifications (TSs) in response to your application dated November 21, 2014, as supplemented by letter dated April 14, 2015. The amendment revises TS 2.1.1.2 of TS Section 2.1.1, "Reactor Core SLs [Safety Limits]." Specifically, the cycle-specific safety limit minimum critical power ratio values for Cycle 20 were revised in support of the Maximum Extended Load Line Limit Plus license amendment request. Enclosure 2 to this letter contains Proprietary Information.
Upon separation from Enclosure
- 2. this letter is DECONTROLLED.
OFFICIAL USE ONLY PROPRIETARY INFORMATION OFFICIAL USE ONLY PROPRIETARY INFORMATION The NRC had determined that the related safety evaluation (SE) contains proprietary information pursuant to Title 1 O of the Code of Federal Regulations, Section 2.390, "Public inspections, exemptions, requests for withholding." Accordingly, the NRC staff has also prepared a non-proprietary version of the SE, which is provided in Enclosure
- 3. The proprietary version of the SE is provided in Enclosure
- 2. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Docket No. 50-416
Enclosures:
- 1. Amendment No. 203 to NPF-29 2. Safety Evaluation (proprietary)
- 3. Safety Evaluation (non-proprietary) cc w/encls 1 and 3: Distribution via Listserv Sincerely, Okw Alan B. Wang, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation OFFICIAL USE ONLY PROPRIETARY INFORMATION ENCLOSURE 1 AMENDMENT NO. 203 TO FACILITY OPERATING LICENSE NO. NPF-29 ENTERGY OPERATIONS, INC. GRAND GULF NUCLEAR STATION, UNIT 1 DOCKET NO. 50-416 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 ENTERGY OPERATIONS, INC. SYSTEM ENERGY RESOURCES.
INC. SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION ENTERGY MISSISSIPPI, INC. DOCKET NO. 50-416 GRAND GULF NUCLEAR STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 203 License No. NPF-29 1. The Nuclear Regulatory Commission (the Commission) has found that: A. The application for amendment by Entergy Operations, Inc. (the licensee), dated November 21, 2014, as supplemented by letter dated April 14, 2015, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 1 O CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied. 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-29 is hereby amended to read as follows: (2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 203 are hereby incorporated in the license. Entergy Operations, Inc. shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. 3. This license amendment is effective as of its date of issuance and shall be implemented within 180 days from the date of issuance.
Attachment:
Changes to the Facility Operating License No. NPF-29 and the Technical Specifications FOR THE NUCLEAR REGULA TORY COMMISSION Meena K. Khanna, Chief Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Date of Issuance:
August 1 8, 201 s ATTACHMENT TO LICENSE AMENDMENT NO. 203 FACILITY OPERATING LICENSE NO. NPF-29 DOCKET NO. 50-416 Replace the following pages of the Facility Operating License No. NPF-29 and the Appendix A, Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change. Facility Operating License Remove Insert Technical Specifications Remove 2.0-1 Insert 2.0-1 (b) SERI is required to notify the NRC in writing prior to any change in (i) the terms or conditions of any new or existing sale or lease agreements executed as part of the above authorized financial transactions, (ii) the GGNS Unit 1 operating agreement, (iii) the existing property insurance coverage for GGNS Unit 1 that would materially alter the representations and conditions set forth in the Staff's Safety Evaluation Report dated December 19, 1988 attached to Amendment No. 54. In addition, SERI is required to notify the NRC of any action by a lessor or other successor in interest to SERI that may have an effect on the operation of the facility.
C. The license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level Entergy Operations, Inc. is authorized to operate the facility at reactor core power levels not in excess of 4408 megawatts thermal (100 percent power) in accordance with the conditions specified herein. (2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 203 are hereby incorporated into this license. Entergy Operations, Inc. shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. During Cycle 19, GGNS will conduct monitoring of the Oscillation Power Range Monitor (OPRM). During this time, the OPRM Upscale function (Function 2.f of Technical Specification Table 3.3.1.1-1}
will be disabled and operated in an "indicate only" mode and technical specification requirements will not apply to this function.
During such time, Backup Stability Protection measures will be implemented via GGNS procedures to provide an alternate method to detect and suppress reactor core thermal hydraulic instability oscillations.
Once monitoring has been successfully completed, the OPRM Upscale function will be enabled and technical specification requirements will be applied to the function; no further operating with this function in an "indicate only" mode will be conducted.
4 Amendment No. 203
2.0 SAFETY
LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam done pressure flow < 10% rated core flow: THERMAL POWER shall be :s; 21. 8% RTP. < 685 psig or SLs 2.0 core 2.1.1.2 With the reactor steam dome pressure 685 psig and core flow 10% rated core flow: MCPR shall be 2 1.15 for two recirculation loop operation or 2 1.15 for single recirculation loop operation.
2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel. 2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be :S: 1325 psig. 2.2 SL Violations With any violation, the following actions shall be completed within 2 hours: 2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods. (continued)
GRAND GULF 2.0-1 Amen dme n t No . 4-6 +/--8-4,--+/--8--9,--+/--9-+/- 2 O 3 ENCLOSURE 3 (NONPROPRIETARY)
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR RELATED TO AMENDMENT NO. 203 TO FACILITY OPERATING LICENSE NO. NPF-29 ENTERGY OPERATIONS, INC. GRAND GULF NUCLEAR STATION, UNIT 1 DOCKET NO. 50-416 Proprietary information pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations has been redacted from this document.
Redacted information is identified by blank space enclosed within double brackets OFFICIAL USE ONLY PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 203 TO FACILITY OPERATING LICENSE NO. NPF-29 ENTERGY OPERATIONS, INC .. ET AL. GRAND GULF NUCLEAR STATION, UNIT 1 DOCKET NO. 50-416
1.0 INTRODUCTION
By application dated November 21, 2014 (Reference 1), as supplemented by letter dated April 14, 2015 (Reference 2), Entergy Operations, Inc. (Entergy, the licensee), requested changes to the Technical Specifications (TSs) for Grand Gulf Nuclear Station, Unit 1 (GGNS). The supplemental letter dated April 14, 2015, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the U.S. Nuclear Regulatory Commission (NRC) staffs original proposed no significant hazards consideration determination as published in the Federal Register on March 31, 2015 (80 FR 17087). The amendment revises TS 2.1.1.2 of TS Section 2.1.1, "Reactor Core SLs [Safety Limits]." Specifically, the cycle-specific safety limit minimum critical power ratio (SLMCPR) values for Cycle 20 were revised in support of the Maximum Extended Load Line Limit Plus (MELLLA+)
license amendment request.
2.0 REGULATORY EVALUATION
The NRC staff used the following criteria for the review of this LAR: Fuel design limits can be exceeded if the core exceeds critical power. Critical power is a term used for the power at which the fuel departs from nucleate boiling and enters a transition to film boiling. For boiling-water reactors (BWRs), the critical power is predicted using a correlation known as the GE (General Electric) critical quality boiling length correlation, or better known as the GEXL correlation.
Due to core wide and operational variations, the margin to boiling transition is most easily described in terms of a critical power ratio (CPR), which is defined as OFFICIAL USE ONLY PROPRIETARY INFORMATION OFFICIAL USE ONLY PROPRIETARY INFORMATION the rod critical power as calculated by GEXL divided by the actual rod power. The more the CPR value exceeds 1.0, the greater the margin to boiling transition.
The SLMCPR is calculated using a statistical process that takes into account operating parameters and The operating limit minimum critical power ratio (OLMCPR) is equal to the SLMCPR plus a CPR margin for transients.
At the OLMCPR, at least 99.9 percent of the rods avoid boiling transition during steady state operation and transients (NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR [Light-Water Reactor] Edition, Section 4.4, "Thermal and Hydraulic Design," Revision 2, March 2007 (Reference 3)) caused by a single operator error or equipment malfunction.
Title 1 O of the Code of Federal Regulations, Part 50 (10 CFR 50), Appendix A, General Design Criterion (GDC) 10, "Reactor design," states, in part, that "[t]he reactor core and associated coolant, control, and protection systems shall be designed ... to assure that specified acceptable fuel design limits are not exceeded during any condition of normal operation, including the effects of anticipated operational occurrences." Safety Limits are required to be included in TSs by 10 CFR 50.36, "Technical specifications." The SLMCPR is calculated on a cycle-specific basis because it is necessary to account for the core configuration-specific neutronic and thermal-hydraulic response.
3.0 TECHNICAL
EVALUATION
3.1 Cycle
20 Core GGNS is a GE Type 6 BWR design. The licensee proposed to change the SLMCPR values in TS 2.1.1.2 from 1.11 to 1.15 for two-loop operation (TLO) and from 1.14 to 1.15 for single-loop operation (SLO). Current TS 2.1.1.2 states: MCPR shall 1.11 for two recirculation loop operation 1.14 for single recirculation loop operation.
Revised TS 2.1.1.2 would state: MCPR shall be 1.15 for two recirculation loop operation 1.15 for single recirculation loop operation.
This amendment supports the GGNS Cycle 20 core design. GGNS Cycle 20 core loading consists of 344 fresh GNF2 fuel bundles, 364 once-burnt GNF2 fuel bundles, and 92 burnt GNF2 fuel bundles. OFFICIAL USE ONLY PROPRIETARY INFORMATION OFFICIAL USE ONLY PROPRIETARY INFORMATION 3.2 Major Contributors to SLMCPR Change In general, the calculated SL is dominated by two key parameters:
- 1) flatness of the core bundle-by-bundle MCPR distribution, and 2) flatness of the bundle pin-by-pin power IR-Factor distribution.
Greater flatness in either parameter yields more rods susceptible to boiling transition and thus a higher calculated SLMCPR. MCPR Importance Parameter (MIP) measures the core, bundle-by-bundle.
MCPR distribution and R-Factor Importance Parameter (RIP) measures the bundle pin-by-pin power IR-Factor distribution.
The impact of the fuel loading pattern on the calculated TLO SLMCPR has been correlated to the parameter MIPRIP, which combines the MIP and RIP values. Another factor besides the core MCPR distribution or the bundle R-factor distribution that significantly impacts the SLMCPR is the expansion of the analysis domain that comes with the initial application of MELLLA+ (Reference 4). The rated power/minimum core flow point is analyzed at a lower core flow (than without MELLLA+), using increased uncertainties (see Section 3.5.2 of this safety evaluation) that tend to increase the SLMCPR. 3.3 Methodology Global Nuclear Fuel (GNF) developed the GGNS Cycle 20 SLMCPR values using the following NRG-approved methodologies and uncertainties:
- NEDC-32601 P, "Methodology and Uncertainties for Safety Limit MCPR Evaluations," Revision 0, dated August 1999 (Reference 5).
- NEDC-32694P, "Power Distribution Uncertainties for Safety Limit MCPR Evaluation," August 1999 (Reference 6).
- NEDE-24011-P-A "General Electric Standard Application for Reactor Fuel," Revision 20, dated December 2013 (Reference 7).
- NEDC-32505P-A "R-Factor Calculation Method for GE11, GE12 and GE13 Fuel," Revision 1, July 1999 (Reference 8).
- NEDC-33173P, Revision 2, "Applicability of GE Methods to Expanded Operating Domains" Supplement 2, Parts 1-3, "Analysis of Gamma Scan Data and Removal of SLMCPR Margin," April 20, 2012 (Reference 9). Plant-specific use of these methodologies must adhere to certain restrictions as addressed in Section 3.3.1 of this safety evaluation.
OFFICIAL USE ONLY PROPRIETARY INFORMATION OFFICIAL USE ONLY PROPRIETARY INFORMATION 3.3.1 Methodology Restrictions Based on the review of Topical Reports NEDC-32601 P, NEDC-32694P, and Amendment 25 to NEDE-24011-P-A (GESTAR II) (Reference 6), the NRC staff identified the following restrictions for the use of these topical reports: 1. The TGBLA (lattice physics code) fuel rod power calculational uncertainty should be verified when applied to fuel designs not included in the benchmark comparisons of Table 3.1 of NEDC-32601 P, since changes in fuel design can have a significant effect on calculation accuracy.
- 2. The effect of the correlation of rod power calculation uncertainties should be reevaluated to insure the accuracy of R-Factor uncertainty when the methodology is applied to a new fuel lattice. 3. In view of the importance of MIP (MCPR Importance Parameter) criterion and its potential sensitivity to changes in fuel bundle designs, core loading and operating strategies, the MIP criterion should be reviewed periodically as part of the procedural review process to insure that the specific value recommended in NEDC-32601-P is applicable to future designs and operating strategies.
3.3.1.1 Restrictions (1) and (2) In addressing Restrictions (1) and (2), by letter dated September 24, 2001, from GNF to the NRC "Confirmation of 1Ox10 Fuel Design Applicability to Improved SLMCPR, Power Distribution and R-Factor Methodologies" (Reference 10), GNF states that the rod power calculational uncertainties are dominated by geometrical considerations in which GE14 is identical to GE12. GNF has stated that in the fuel bundle design Information Notice (Reference 11 ), GNF2 fuel is designed for mechanical, nuclear, and thermal-hydraulic compatibility with the other 10x10 GNF fuel designs. The design has features of the currently operating GE 10, GE 11/13 and GE 12/14, fuel including pellet-cladding interaction resistant barrier cladding, high performance spacers, part length rods, interactive thick corner/thin wall channel, and axial enrichment loading. The GNF2 design is a 1Ox10 array with 92 fuel rods, 2 large central water rods, and 14 part length fuel rods. The part length rod configuration improves efficiency and reactivity margins. Tables 2.1 and 3.1 of NEDC-32601 P (Reference
- 5) provide a summary of SLMCPR uncertainties and a summary of pin power comparisons for a typical GE fuel design. The values given in these tables are representative of the values being calculated for GE14 and GNF2 fuel. In an e-mail dated March 12, 2015 (Reference 12), the NRC staff requested the licensee (Request for additional information (RAl)-1) to explain the differences in design and geometrical considerations between GNF2 and GE 14 fuel. In the licensee's response to the NRC staff's question, by letter dated April 14, 2015 (Reference 2), the licensee stated that GNF2 is an OFFICIAL USE ONLY PROPRIETARY INFORMATION OFFICIAL USE ONLY PROPRIETARY INFORMATION evolutionary fuel product based on GE14 and that it is not considered a new fuel design as it maintains the previously established 1Ox10 array. Based on the above discussion, the NRC staff concludes that the SLMCPR and the rod power calculational uncertainties used by GNF to develop the GGNS Cycle 20 SLMCPR values are valid for GNF2 fuel and that the response to RAl-1 (Reference
- 2) addresses the NRC staffs concern and is acceptable.
3.3.1.2 Restriction (3) The limiting control rod patterns used to calculate the SLMCPR reasonably assure that at least 99.9 percent of the fuel rods in the core would not be expected to experience boiling transition during normal operation or anticipated operational occurrences during the operation of GGNS Cycle 20. The NRC staff determined that the rod patterns used produces a limiting MCPR distribution that reasonably bounds the MCPR distributions that would be expected during the operation of the GGNS core throughout Cycle 20 in conjunction with the MELLLA+ LAR (Reference 14). In summary, the NRC staff concludes that the licensee has adequately addressed the restrictions of Topical Reports NEDC-32601 P-A, NEDC-32694P-A, Amendment 25 to NEDE-24011-P-A (GESTAR II) (Reference 6), and NEDC-32505P-A (Reference 8), and that the use of these reports to evaluate the GGNS Cycle 20 SLMCPR is acceptable.
3.4 Departures
from the NRG-Approved Methodology No departures from the NRG-approved methodologies were identified in the GGNS Cycle 20 SLMCPR calculations.
3.5 Deviations
from the NRG-Approved Calculational Uncertainties 3.5.1 R-Factor The R-factor is an input into the GEXL correlation used to describe the local pin-by-pin power distribution and the fuel assembly and channel geometry on the fuel assembly critical power. The R-factor uncertainty analysis includes an allowance for power peaking modeling uncertainty, manufacturing uncertainty and channel bow uncertainty.
GNF has increased this uncertainty for all SLMCPR calculations to account for the potential impact of control blade shadow corrosion induced bow. GNF has generically increased the GEXL R-Factor uncertainty (Reference
- 5) to account for an increase in channel bow due to the emerging unforeseen phenomenon called control blade shadow corrosion-induced channel bow, which is not accounted for in the channel bow uncertainty component of the approved R-Factor uncertainty.
The GGNS Cycle 20 analysis shows an expected channel bow uncertainty of 1, which is bounded by a GEXL R-Factor uncertainty of up to [[ *))that accounts for channel bow uncertainty (Reference 8). Thus, the NRC staff concludes that the use of a GEXL OFFICIAL USE ONLY PROPRIETARY INFORMATION OFFICIAL USE ONLY PROPRIETARY INFORMATION R-Factor uncertainty adequately accounts for the expected control blade shadow induced channel bow for GGNS Cycle 20. 3.5.2 Core Flow Rate and Random Effective Traversing lncore Probe Reading GNF has committed (Reference
- 13) to the expansion of the state points used in the determination of the SLMCPR. Consistent with the Reference 13 commitments, GNF performs analyses at the rated core power and minimum licensed core flow point in addition to analyses at the rated core power and rated core flow point. The NRG-approved SLMCPR methodology is applied at each statepoint that is analyzed.
For the TLO calculations performed in the MELLLA+ domain at rated power I minimum core flow and off-rated power I off-rated core flow, the approved uncertainty values for the core flow rate (2.5 percent) and the random effective traversing incore probe (TIP) reading (1.2 percent) are conservatively adjusted by using the SLO uncertainty values of 6.0 percent and 2.85 percent for the core flow rate and random effective TIP reading, respectively.
The treatment of the core flow and random effective TIP reading uncertainties is based on a conservative assumption that the signal to noise ratio deteriorates as core flow is reduced. In accordance to the limitation and conditions of NEOC-33006P-A, Revision 3 (Reference 15), SLO uncertainties are applied to TLO conditions for operation in the MELLLA+ region. For GGNS Cycle 20, the most limiting SLMCPR calculation occurred at the 80.6 percent rated Power I 55 percent rated flow point. At low core flows, the search spaces for the limiting rod pattern and the nominal rod pattern are essentially the same. Hence, the rod pattern used to calculate the SLMCPR at 80.6 percent rated power/ 55 percent rated flow reasonably assures that at least 99.9 percent of the fuel rods in the core would not be expected to experience boiling transition during normal operation or anticipated operational occurrences during the operation of GGNS Cycle 20. Consequently, the SLMCPR value calculated from the 80.6 percent rated power/ 55 percent rated core flow condition limiting MCPR distribution reasonably bounds this mode of operation for GGNS Cycle 20. The NRC staff concludes that the uncertainty used in the analysis bounds the original non-flow dependent uncertainties and, therefore, the NRC staff concludes that the SLMCPR values are acceptable for GGNS Cycle 20. 3.6 Core Monitoring System For GGNS Cycle 20, the GNF 30 MONICORE System will be used as the core monitoring system. The 30 MONICORE system is in widespread use throughout the GNF fueled fleet of BWRs like GGNS. Use of a current version of 30 MONICORE provides the plant capability to perform the reactivity anomaly surveillance.
Use of 30 MONICORE has been previously evaluated and accepted by the NRC in a letter dated March 11, 1999 (Reference 6). Therefore, the NRC staff concludes the use of the GNF 30 MONICORE system for GGNS Cycle 20 is acceptable.
OFFICIAL USE ONLY PROPRIETARY INFORMATION OFFICIAL USE ONLY PROPRIETARY INFORMATION 3.7 Technical Evaluation Conclusion The NRC staff concludes that the licensee's proposed GGNS Cycle 20 SLMCPR values of 1.15 for two-recirculation-loop operation and 1.15 for single-recirculation-loop operation are acceptable for GGNS Cycle 20, since the approved methodologies are used in accordance with staff guidelines, as addressed in Section 3.0 of this safety evaluation.
Further, the NRC staff concludes that the licensee used methods consistent with regulatory requirements identified in Section 2.0 of this safety evaluation.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Mississippi State official was notified of the proposed issuance of the amendment.
The State official had no comments.
5.0 ENVIRONMENTAL
CONSIDERATION The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure.
The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding published in the Federal Register on March 31, 2015 (80 FR 17087). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 1 O CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
7.0 REFERENCES
- 1. Mulligan, Kevin, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "License Amendment Request to Revise Technical Specification 2.1.1.2, Grand Gulf Nuclear Station, Unit 1, Docket No. 50-416, License NO. NPF-29," dated November 21, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14325A520).
OFFICIAL USE ONLY PROPRIETARY INFORMATION OFFICIAL USE ONLY PROPRIETARY INFORMATION 2. Coutu, Tom, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Safety Limit Minimum Critical Power Ratio Technical Specification 2.1.1.2, Revision, Request for Additional Information Response, Grand Gulf Nuclear Station, Unit 1, Docket No. 50-416, License NO. NPF-29," dated April 14, 2015 (ADAMS Accession No. ML 15104A784).
- 3. U.S. Nuclear Regulatory Commission, NUREG-0800, "Standard Review Plan [SRP] for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR [Light Water Reactor] Edition (SRP), Chapter 4, Section 4.4, "Thermal and Hydraulic Design," Revision 2, March 2007 (ADAMS Accession No. ML070550060).
- 4. GE Nuclear Energy, NEDC-33006P, "Licensing Topical Report, General Electric Boiling Water Reactor Maximum Extended Load Line Limit Analysis Plus," Revision 1, dated August 2002. (Proprietary information.
Not publicly available.)
- 5. GE Nuclear Energy, NED0-32601A, "Methodology and Uncertainties for Safety Limit MCPR Evaluations," Revision 0, dated August 1999 (ADAMS Accession No. ML 14093A216).
- 6. Akstulewicz, Frank, U.S. Nuclear Regulatory Commission, letter to Mr. Glen A. Watford, General Electric Company, "Acceptance for Referencing of Licensing Topical Reports NEDC-32601 P, Methodology and Uncertainties for Safety Limit MCPR Evaluations; NEDC-32694P, Power Distribution Uncertainties for Safety Limit MCPR Evaluation; and Amendment 25 to NEDE-24011-P-A on Cycle-Specific Safety Limit MCPR (TAC Nos. M97 490, M99069 and M97 491) dated March 11, 1999 (ADAMS Accession No. ML993140059).
- 7. Global Nuclear Fuel, Licensing Topical Report NEDE-24011-P-A, Revision 20, "General Electric Standard Application for Reactor Fuel," December 2013. (Proprietary information.
Not publicly available.)
- 8. GE Nuclear Energy, NED0-32505-A, "R-Factor Calculation Method for GE11, GE12, and GE13 Fuel," Revision 1, dated July 1999 (ADAMS Accession No. ML060520636).
- 9. Harrison, James F., GE Hitachi Nuclear Energy, letter to U.S. Nuclear Regulatory Commission, "Accepted Versions of NEDC-33173P, Revision 2 and Supplement 2, Parts 1-3, "Analysis of Gamma Scan Data and Removal of Safety Limit Critical Power Ration (SLMCPR) Margin" (TAC No. ME1891)," dated April 20, 2012 (ADAMS Accession No. ML 12115A207).
- 10. Watford, Glen A., Global Nuclear Fuel, letter to U.S. Nuclear Regulatory Commission, "Confirmation of 10x10 Fuel Design Applicability to Improved SLMCPR, Power Distribution and R-Factor Methodologies," dated September 24, 2001 (ADAMS Accession No. ML012710272).
OFFICIAL USE ONLY PROPRIETARY INFORMATION OFFICIAL USE ONLY PROPRIETARY INFORMATION 11. Global Nuclear Fuel, NED0-31152, "Global Nuclear Fuels Fuel Bundle Designs," Revision 9, dated May 2007 (ADAMS Accession No. ML071510287).
- 12. Wang, Alan, U.S. Nuclear Regulatory Commission, e-mail to Scarbrough, Richard A., and Nadeau, James, Energy Operations, Inc., "Request for Additional Information (RAI) Regarding
[Amendment]
Request to Revise Technical Specification 2.1.1.2 (TAC No. MF5304)," dated March 12, 2015 (ADAMS Accession No. ML 15072A139).
- 13. Post, J.S. GE Nuclear Energy, letter to U.S. Nuclear Regulatory Commission, "Part 21 Reportable Condition and 60-Day Interim Report Notification:
Non-Conservative SLMCPR," August 24, 2004 (ADAMS Accession No. ML042720293).
- 14. Ford, B. S., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Maximum Extended Load Line Limit Analysis Plus (MELLLA+)
License Amendment Request, Grand Gulf Nuclear Station, Unit 1, Docket No. 50-416, License No. NPF-29," dated September 25, 2013 (ADAMS Accession No. ML 13269A 140). 15. GE-Hitachi Nuclear Energy, "General Electric Boiling Water Reactor Maximum Extended Load Line Limit Analysis Plus," NEDC-33006P-A, Revision 3, dated June 2009 (ADAMS Accession No. ML091800530).
Principal Contributor:
F. Forsaty Date: August 18, 2015 OFFICIAL USE ONLY PROPRIETARY INFORMATION OFFICIAL USE ONLY PROPRIETARY INFORMATION The NRC had determined that the related safety evaluation (SE) contains proprietary information pursuant to Title 10 of the Code of Federal Regulations, Section 2.390, "Public inspections, exemptions, requests for withholding." Accordingly, the NRG staff has also prepared a non-proprietary version of the SE, which is provided in Enclosure
- 3. The proprietary version of the SE is provided in Enclosure
- 2. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Docket No. 50-416
Enclosures:
Sincerely, IRA/ Alan B. Wang, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
- 1. Amendment No. 203 to NPF-29 2. Safety Evaluation (proprietary)
- 3. Safety Evaluation (non-proprietary) cc w/encls 1 and 3: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL4-2 r/f RidsNrrDorlDpr Resource RidsRgn4MailCenter Resource RidsNrrLAPBlechman Resource RidsAcrsAcnw MailCTR Resource RidsNrrDorlLpi4-2 Resource RidsNrrDssSrsb Resource A DAMS Accession Nos. Proorietarv ML 15203A071, Nonoroorietarv ML 15229A213 RldsNrrDssStsb Resource RidsNrrPMGrandGulf Resource FForsaty, NRR "via memorandum OFFICE NRR/DORULPL4-2/PM NRR/DORL/LPL4-2/LA NRR/DSS/STSB/BC NRR/DSS/SXRB/BC*
NAME AWang PBlechman RElliott CJackson DATE 8/4/15 8/4/15 7/31/15 7/13/2015 OFFICE OGC-NLO NRR/DORULPL4-2/BC NRR/DORL/LPL4-2/PM NAME CKanatas MKhanna AWang DATE 8/12/15 8/13/15 8/18/15 OFFICIAL RECORD COPY OFFICIAL USE ONLY PROPRIETARY INFORMATION}}