 Issue dateTitleTopic
ML24172A25029 July 2024– Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, “Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors”Safe Shutdown
High winds
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Cyber Security
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Large early release frequency
Safeguards Contingency Plan
License Renewal
ML24176A12029 July 2024Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, “Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b”Safe Shutdown
High Radiation Area
Ultimate heat sink
Water Inventory Control
Internal Flooding
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Large early release frequency
Maintenance Rule Program
Offsite Circuit
ML22342B28028 December 2022Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1
ML22104A22212 May 2022Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554Shutdown Margin
Packing leak
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Process Control Program
Pressure Boundary Leakage
ML22083A12428 April 2022Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2Ultimate heat sink
Water Inventory Control
Surveillance Frequency Control Program
Safeguards Contingency Plan
Recently irradiated fuel
ML21146A0188 June 2021Issuance of Amendments to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control ProgramProbabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
ML21040A2924 March 2021Issuance of Amendments Adoption of TSTF 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee ControlSurveillance Frequency Control Program
ML21019A21924 February 2021Issuance of Amendment No. 227 Extension of Appendix J Integrated Leakage Test IntervalProbabilistic Risk Assessment
Coatings
Incorporated by reference
Aging Management
Surveillance Frequency Control Program
Local Leak Rate Testing
Foreign Material Exclusion
Large early release frequency
Integrated leak rate test
COVID-19
ML21011A0682 February 2021Issuance of Amendments Adoption of TSTF 439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of FailureSafe Shutdown
Anticipated operational occurrence
Significance Determination Process
Maintenance Rule Program
Offsite Circuit
ML21011A0481 February 2021Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling SubsystemsSurveillance Frequency Control Program
ML20101G05415 April 2020Issuance of Amendment No. 224 One Cycle Extension of Appendix J Integrated Leakage Test and Drywell Bypass Test Interval (Exigent Circumstances)Probabilistic Risk Assessment
Coatings
Aging Management
Surveillance Frequency Control Program
Local Leak Rate Testing
Foreign Material Exclusion
Large early release frequency
Integrated leak rate test
License Renewal
Pandemic
COVID-19
ML19308B10711 December 2019Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio)Reactor Vessel Water Level
Anticipated operational occurrence
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
ML19175A04211 September 2019Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application RulesTime of Discovery
Fire Protection Program
ML19123A01418 June 2019Issuance of Amendment No. 220, Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing BasisSafe Shutdown
High winds
Mission time
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
FLEX
Tornado-Generated Missile
Tornado Generated Missile
Tornado Missile Protection
Large early release frequency
TORMIS
Tornado Missile Risk Evaluator
Fuel cladding
ML19094A79911 June 2019Issuance of Amendment No. 219 to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-425, Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5BHigh winds
Reactor Vessel Water Level
High Radiation Area
Water Inventory Control
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Scram Discharge Volume
Large early release frequency
Spiral reload
Overtravel
Maintenance Rule Program
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Backfit
Unidentified leakage
Power Uprate
Overspeed trip
Operational leakage
ML19084A21823 May 2019Issuance of Amendment No. 218 to Revise Technical Specification to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory ControlReactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Water Inventory Control
Hydrostatic
Fuel cladding
Recently irradiated fuel
Scaffolding
ML19025A02312 March 2019Issuance of Amendment No. 216 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors
ML18215A19612 March 2019Issuance of Amendment No. 217 to Modify the Updated Safety Analysis Report to Replace Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System SignalsAnticipated operational occurrence
Probabilistic Risk Assessment
Abnormal operational transient
ML18306A51330 November 2018Issuance of Conforming Amendment Nos. 262, 312 and 215 Transfers of Renewed Facility Operating Licenses
ML17240A2324 October 2017Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 213 for Administrative Name Change to Licensee South Mississippi Electric Power Association (CAC No. MF9588)
ML17116A0327 June 2017Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 212 to Adopt Technical Specifications Task Force-427, Allowance For Non-Technical Specification Barrier Degradation on Supported System Operability (CAC No. MF8692.)
ML16243A0248 December 2016Record of Decision - License Renewal Application for Grand Gulf Nuclear Station, Unit 1Incorporated by reference
License Renewal
Environmental Justice
ML16292A4621 December 2016Renewed Facility Operating License for Grand Gulf Nuclear Station, Unit 1
ML16140A1334 August 2016Issuance of Amendment Revision of Technical Specifications to Remove Inservice Testing Program and Clarify Surveillance Requirement Usage Rule ApplicationTime of Discovery
High Radiation Area
ML16132A19426 May 2016Correction to Amendment No. 207, Request for Changing Five Technical Specifications Allowable Levels
ML16119A14825 May 2016Issuance of Amendment No. 210 Re. Cyber Security Plan Milestone 8 Full Implementation ScheduleCyber Security
ML16011A24717 February 2016Issuance of Amendment No. 209 Revision of Technical Specifications for Containment Leak Rate TestingLocal Leak Rate Testing
MELLLA
Integrated leak rate test
Grace period
Power Uprate
ML15336A25617 December 2015Issuance of Amendment No. 208 Adoption of Technical Specification Task Force Traveler TSTF-522Operability Determination
ML15229A21931 August 2015Redacted, Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus License Amendment RequestSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Cyber Security
High Energy Line Break
Pressure and Temperature Limits Report
Flow Accelerated Corrosion
Feedwater Heater
Annual Radiological Environmental Operating Report
Intergranular Stress Corrosion Cracking
Process Control Program
Feedwater Controller Failure
Large early release frequency
MELLLA
Stress corrosion cracking
Time Critical Operator Action
Safeguards Contingency Plan
Earthquake
Fuel cladding
Power change
Power Uprate
Failure to Scram
Manual Operator Action
Water rod
Water hammer
ML15195A35531 August 2015Issuance of Amendment Request for Changing Five Technical Specifications Allowable ValuesReactor Vessel Water Level
Anticipated operational occurrence
Probabilistic Risk Assessment
High Energy Line Break
ML15180A17031 August 2015Issuance of Amendment Revision to Technical Specification 5.65.B to Add Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation DensityMELLLA
ML15229A21318 August 2015Redacted, Issuance of Amendment Regarding Technical Specification 2.1.1.2 of Technical Specification Section 2.1.1.2, Reactor SLs (Safety Limits)Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
ML15229A21818 August 2015Redacted, Issuance of Amendment Adoption of Single Fluence MethodologyLicense Renewal
Power Uprate
ML15104A62312 May 2015Issuance of Amendment Adoption of Technical Specifications Task Force Standard Technical Specifications Change Traveler TSTF-523Operability Determination
Water hammer
ML14311A47912 December 2014Issuance of Amendment No. 200, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation DateCyber Security
ML14162A37825 September 2014Redacted, Issuance of Amendment No. 199, Delete Operating License Condition 2.C(32), Partial Feedwater Heating, to Allow Plant to Operate with Final Feedwater Temperature Reduction at End of Fuel Cycle
ML14106A13330 June 2014Issuance of Amendment No. 198, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs, as Part of Consolidated Line Item Improvement ProcessShutdown Margin
Anticipated operational occurrence
ML13343A10926 December 2013Issuance of Amendment No. 197, Revise Technical Specifications and Surveillance Requirements to Support Operation with 24-Month Fuel Cycle in Accordance with Generic Letter 91-04Safe Shutdown
High Radiation Area
Ultimate heat sink
Post Accident Monitoring
Scram Discharge Volume
Maintenance Rule Program
Recently irradiated fuel
Offsite Circuit
Grace period
Overspeed trip
ML13261A34925 September 2013Issuance of Amendment No. 196, Modify Updated Final Safety Analysis Report to Revise the Methodology for Standby Service Water Passive Failure
ML13261A26425 September 2013Redacted Version, Issuance of Amendment No. 195, Revise Criticality Safety Analysis and Technical Specification 4.3.1, Criticality, and Delete Spent Fuel Pool Loading Criteria License ConditionIncorporated by reference
Power Uprate
Water rod
ML13157A0295 August 2013Issuance of Amendment No. 194, Revise TS Table 3.3.6.1-1 to Support Correction of Non-Conservative Allowable Value for Primary Containment and Drywell Isolation InstrumentationAnticipated operational occurrence
ML13025A30614 March 2013ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical SpecificationsSafeguards Contingency Plan
ML12240A2395 December 2012Issuance of Amendment No. 192, Revise Physical Protection License Condition Related to Milestone 6 of the Cyber Security Plan ImplementationCyber Security
ML12086014911 May 2012Issuance of Amendment No. 190, Revise Technical Specification 3.1.7, Standby Liquid Control (SLC) System, to Support Use of Sodium Pentaborate Solution Enriched with Boron-10 IsotopeBoric Acid
Shutdown Margin
Anticipated operational occurrence
ML12072028320 April 2012Issuance of Amendment No. 189, Revise Minimum Critical Power Ratio Safety Limit in Technical Specification 2.1.1.2 for Two-Loop and Single Recirculation LoopReactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Abnormal operational transient
Fuel cladding
ML11173068112 September 2011Issuance of Amendment No. 187, Revise Technical Specifications to Adopt TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage InstrumentationReactor Vessel Water Level
Grab sample
Operating Basis Earthquake
Pressure Boundary Leakage
Unidentified leakage
ML11194016527 July 2011Issuance of Amendment No. 186, Revise License Condition and Approval of Cyber Security Plan and Associated Implementation ScheduleCyber Security
Safeguards Contingency Plan
Cyber attack
ML11073040227 April 2011Issuance of Amendment No. 185, Revise Surveillance Requirement Notes in Technical Specifications Associated with Condensate Storage Tank Level-Low as Reflected in TSTF-493Anticipated operational occurrence
Incorporated by reference
Operability Determination
ML09098042913 April 2009Correction to Amendment No. 182, Surveillance Requirements for Diesel Generator Slow - Start Testing (MD9641)
ML08176002314 October 2008Issuance of Amendment No. 178, Adoption of Technical Specifications Task Force (TSTF) Traveler No. 448, Revision 3, Control Room Envelope Habitability.Safe Shutdown
Safeguards Contingency Plan
Earthquake