PCI V s 3.6.1.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME A.
(continued)
Prior to entering MODE 2 or 3 from MODE 4, if not performed within the previous 92 days, for isolation devices inside primary containment,
- drywell, or steam tunnel B.
One or more penetration flow paths with two PCIVs inoperable except due to leakage not within limit.
NOTE-----------
Relief valves are not required to be de-activated provided the relief setpoint is at least 23 psig and one of the following criteria is met:
- 1.
the relief valve is one-inch nominal, size or less, or
- 2.
the flow path is into a closed system whose piping pressure rating exceeds the containment design pressure rating.
B. 1 Isolate the affected penetration flow path by use of at least one closed and de-activated automatic valve, closed manual valve, or blind flange.
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (continued)
GRAND GULF 3.6-11 Amendment No.
4-2-9, 176
PCIVs 3.6.1.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C.
One or more C.1 Restore leakage rate 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> penetration flow paths to within limit.
with leakage rate not within limit except for purge valve leakage.
(continued)
GRAND GULF 3.6 - 11a Amendment No.
76
PCIVs 3.6.1.3 ACTION (continued)
CONDITION REQUIRED ACTION
[COMPLETION TIME A.
One or more penetration flow paths with one PCIV inoperable except due to leakage not within limit.
-NOTE Relief valves are not required to be de-activated provided the relief setpoint is at least 23 psig and one of the following criteria is met:
- 1.
the relief valve is one-inch nominal size or less, or
- 2.
the flow path is into a closed system whose piping pressure rating exceeds the containment design pressure rating.
A.1 Isolate the affected penetration flow path by use of at least one closed and de-activated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.
AND A.2 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> except for main steam line AND 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for main steam line Once per 31 days for isolation devices outside primary containment,
- drywell, and steam tunnel AND NOTE--------
Isolation devices in high radiation areas may be verified by use of administrative means.
Verify the affected penetration flow path is isolated.