ML18051A518
From kanterella
Revision as of 11:44, 14 December 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML18051A518 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 08/03/1983 |
From: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | |
Shared Package | |
ML18051A516 | List: |
References | |
NUDOCS 8308100360 | |
Download: ML18051A518 (2) | |
Similar Documents at Palisades | |
---|---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML18066A6641999-09-30030 September 1999
[Table view]Proposed Tech Specs Re Surveillance Implementation ML18066A6501999-09-17017 September 1999 Final Clean Copies of ITS & Bases Pages Incorporating Proposed Changes,Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to ITS LCOs 3.5.2,3.6.3,3.6.6, 3.7.5 & 3.7.7 & 3.7.8 ML18066A5911999-07-30030 July 1999 Proposed Tech Specs Sections 3.3,3.5 & 3.6,converting to Its,Per NUREG-1432 ML18066A5691999-07-19019 July 1999 Proposed Tech Specs Section 3.7, Plant Systems, Converting to ITS ML18066A5011999-06-11011 June 1999 Proposed Tech Specs Pages Re 980126 Submittal & Replacement Pages for Sections 3.3,3.4 & 3.9 ML18068A5851999-05-0303 May 1999 Proposed Tech Specs Section 3.5,converting to ITS ML18066A4551999-04-0707 April 1999 Proposed ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1 ML18066A4431999-03-30030 March 1999 Proposed Tech Specs Section 3.7,converting to ITS ML18066A4251999-03-22022 March 1999 Revised TS Pages for ITS Section 3.4 ML20207B2501999-03-0101 March 1999 Proposed Tech Specs Sections 2.0,3.1 & 3.2,converting to ITS ML18066A3281998-11-0909 November 1998 Proposed Tech Specs,Deleting CVCS Operability Requirements Currenty in LCOs 3.2 3.17.6 & Associated Testing Requirements Currently in SRs 4.2 & 4.17 ML20195E4451998-11-0909 November 1998 Proposed Tech Specs,Converting to Its,Consistent with NUREG-1432,Rev 1,in Response to 980824 RAI ML20154N2901998-10-12012 October 1998 Proposed Tech Specs Sections 1.0,3.0,4.0 & 5.0,converting to Improved Tech Specs ML20151Z8111998-09-14014 September 1998 Proposed Tech Specs Converting to Improved Tss, Consistent with NUREG-1432,Rev 1 ML18066A3021998-09-14014 September 1998 Proposed Tech Specs Markups of Previously Submitted Pages & Revised ITS Submittal Pages ML18066A2011998-06-17017 June 1998 Proposed Tech Specs,Reflecting Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18065B1801998-03-13013 March 1998 Proposed Tech Specs Allowing Installation of Plant Mod W/O Requiring Plant Shutdown ML18067A8161998-01-26026 January 1998 Proposed Tech Specs Converting to Improved Ts,Consistent W/ NUREG-1432,Rev 1.Includes Vols 1-20 ML18066A4901998-01-20020 January 1998 Proposed Tech Specs Re Partial Response to 990126 Request RAI for ITS Section 3.6, Containment. ML18067A7071997-10-0101 October 1997 Proposed Tech Specs,Stating That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note of Insp at End of Cycle 12 ML18067A6731997-09-0303 September 1997 Proposed Tech Specs,Updating TS to Reflect Capabilities of Installed CR Ventilation Equipment & to Emulate Std TS, CE Plants - NUREG 1432 Requirements for That Sys ML18067A6771997-09-0303 September 1997 Proposed Tech Specs,Deleting Snubber Operability Requiements in LCO 3.20 & Snubber Testing Requirements Currently in SR 4.16 ML18067A6001997-06-27027 June 1997 Proposed Tech Specs Revising Electrical Power Systems ML18067A4701997-03-28028 March 1997 Proposed Tech Specs Pp Supporting Completion of Administrative Control Changes Proposed in 951211 Safety Evaluation for Amend 174 ML20137H5901997-03-27027 March 1997 Proposed Tech Specs Change Request Re Change in Co Name ML18067A4531997-03-26026 March 1997 Proposed Tech Specs,Allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18065B0331996-10-25025 October 1996 Proposed Tech Specs Change Request,Revising Administrative Controls Sections of Plant TS ML18065B0171996-10-18018 October 1996 Proposed Tech Specs,Providing Info Necessary for Completion of Review & Approval Process Re Writting Commitment Be Made That Description of Palisades Operating Requirements Manual Will Be Added to FSAR ML18065A9551996-10-0202 October 1996 Proposed Tech Specs 4.6.1 Re Safety Injection sys,4.6.2 Re Containment Spray sys,4.6.3 Re Pumps & 4.6.4 Re Valves ML18065A9111996-09-0404 September 1996 Proposed Tech Specs 3.7, Electrical Power Systems. ML20117K9581996-09-0303 September 1996 Proposed Tech Specs,Revising Administrative Control & Resolution of NRC Comments ML18065A8631996-08-14014 August 1996 Proposed TS Table 4.3.2 Re Miscellaneous Surveillance Items ML18065A5861996-03-29029 March 1996 Proposed Tech Specs,Upgrading Plant TS & Bases to Emulate STS for Combustion Engineering Plants,NUREG-1432,Rev 1 ML18065A4911996-02-0606 February 1996 Proposed Tech Specs Re Removal of cross-train Testing Requirements from LCO Action Statements ML18065A4411996-01-18018 January 1996 Proposed Tech Specs Allowing Use of 10CFR50 App J Option B Containment Testing & Use of Warning Light to Identify Certain High Radiation Areas ML18065A4361996-01-18018 January 1996 Proposed Tech Specs Re Primary Coolant Pump Flywheel Insps ML18065A4111996-01-10010 January 1996 Proposed Tech Specs,Requesting Exemption from 10CFR50 App J & TS Change Request Concerning Local Leak Test Requirements for Emergency Escape Airlock in Plant Containment Bldg ML18065A3841996-01-0505 January 1996 Proposed Tech Specs,Revising SDC Requirements & Bases for TS Section 3.1.9.3 Prior to 1996 Refueling Outage ML18065A3771995-12-27027 December 1995 Proposed Tech Specs,Rewriting Electrical Power Sys Sections of TS & Bases to Closely Emulate STS ML18065A3481995-12-11011 December 1995 Proposed Tech Specs,Revising Administrative Controls Section to Emulate CE STS by Removing Review & Audit Requirements of Section 6.5 & Record Retention Requirements of Section 6.10 of TS Relocating in CPC Quality Program Description ML18065A3341995-12-0606 December 1995 Proposed Tech Specs,Relocating Crane Operation & Movement of Heavy Loads Requirements & Bases from TS to Other Plant Documents Prior to 1996 Refueling Outage ML18065A1761995-10-17017 October 1995 Proposed Tech Specs,Changing Pressurizer Cooldown Limit from 100 to 200 F/H,Adding Word Shall to TS 3.1.2c,adding Average Hourly to Column Headings in TS 3.1.2c & Removing Action 3.3.3C from Page 3-31 to 3-30 ML18065A1241995-09-21021 September 1995 Proposed Tech Specs Re Diesel Generator Testing ML18064A8411995-07-0505 July 1995 Proposed Tech Specs,Deleting Section 6.4, Training, & Revising Sections 6.5.1.2 on Plant Review Committee Composition & 6.5.3.1 & 6.5.3.2,clarifying & Modifying Function & Composition of Plant Safety & Licensing Staff ML18064A7611995-05-0101 May 1995 Proposed Tech Specs Re Requirements for Periodic DG Peak Load Tests ML18064A7331995-04-27027 April 1995 Revised Proposed Ts,Consisting of Changes to Basis in First Paragraph of Page 3-2 & Rev to List of Approved Methodology Repts ML18064A7361995-04-27027 April 1995 Proposed Tech Specs,Supporting Action Statements for Inoperable Safety Valves in Proposed Specs 3.1.7 of TS Change Request of 950103 ML18064A6631995-03-30030 March 1995 Proposed Tech Specs for One Time Surveillance Deferment ML18064A6691995-03-24024 March 1995 Proposed TS Re pressure-temp Limits ML18064A6221995-02-20020 February 1995 Proposed TS Figure 3-4, LTOP Setpoint Limit. 1999-09-30 Category:TECHNICAL SPECIFICATIONS & TEST REPORTS MONTHYEARML18066A6641999-09-30030 September 1999
[Table view]Proposed Tech Specs Re Surveillance Implementation ML18066A6501999-09-17017 September 1999 Final Clean Copies of ITS & Bases Pages Incorporating Proposed Changes,Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to ITS LCOs 3.5.2,3.6.3,3.6.6, 3.7.5 & 3.7.7 & 3.7.8 ML18066A5911999-07-30030 July 1999 Proposed Tech Specs Sections 3.3,3.5 & 3.6,converting to Its,Per NUREG-1432 ML18066A5691999-07-19019 July 1999 Proposed Tech Specs Section 3.7, Plant Systems, Converting to ITS ML18066A5011999-06-11011 June 1999 Proposed Tech Specs Pages Re 980126 Submittal & Replacement Pages for Sections 3.3,3.4 & 3.9 ML18068A5851999-05-0303 May 1999 Proposed Tech Specs Section 3.5,converting to ITS ML18066A4551999-04-0707 April 1999 Proposed ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1 ML18066A4431999-03-30030 March 1999 Proposed Tech Specs Section 3.7,converting to ITS ML18066A4251999-03-22022 March 1999 Revised TS Pages for ITS Section 3.4 ML20207B2501999-03-0101 March 1999 Proposed Tech Specs Sections 2.0,3.1 & 3.2,converting to ITS ML18066A3281998-11-0909 November 1998 Proposed Tech Specs,Deleting CVCS Operability Requirements Currenty in LCOs 3.2 3.17.6 & Associated Testing Requirements Currently in SRs 4.2 & 4.17 ML20195E4451998-11-0909 November 1998 Proposed Tech Specs,Converting to Its,Consistent with NUREG-1432,Rev 1,in Response to 980824 RAI ML20154N2901998-10-12012 October 1998 Proposed Tech Specs Sections 1.0,3.0,4.0 & 5.0,converting to Improved Tech Specs ML18066A3021998-09-14014 September 1998 Proposed Tech Specs Markups of Previously Submitted Pages & Revised ITS Submittal Pages ML20151Z8111998-09-14014 September 1998 Proposed Tech Specs Converting to Improved Tss, Consistent with NUREG-1432,Rev 1 ML18066A2011998-06-17017 June 1998 Proposed Tech Specs,Reflecting Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18066A1841998-06-10010 June 1998 Simulator Four-Year Test Rept & Schedule for Performance Testing for Next Four-Year Period. ML18068A3451998-04-29029 April 1998 Rev 9 to EI-9, Offsite Radiological Monitoring. ML18068A3441998-04-28028 April 1998 Rev 3 to EI-6.6, Gamma E Determination. ML18065B2271998-04-21021 April 1998 Reactor Vessel Neutron Fluence Methodology. ML20217C3101998-03-24024 March 1998 Palisades,Review of Actual Fluence Determination ML18065B1801998-03-13013 March 1998 Proposed Tech Specs Allowing Installation of Plant Mod W/O Requiring Plant Shutdown ML18065B2021998-03-10010 March 1998 Rev 7 to Relocated TS Per GL 89-09. ML18067A8161998-01-26026 January 1998 Proposed Tech Specs Converting to Improved Ts,Consistent W/ NUREG-1432,Rev 1.Includes Vols 1-20 ML18066A4901998-01-20020 January 1998 Proposed Tech Specs Re Partial Response to 990126 Request RAI for ITS Section 3.6, Containment. ML20197G3851997-12-17017 December 1997 Rev 17 to Palisades Nuclear Plant Suitability,Training & Qualification Plan ML18065B2321997-10-24024 October 1997 Rev 5 to Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML18067A7071997-10-0101 October 1997 Proposed Tech Specs,Stating That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note of Insp at End of Cycle 12 ML18067A6731997-09-0303 September 1997 Proposed Tech Specs,Updating TS to Reflect Capabilities of Installed CR Ventilation Equipment & to Emulate Std TS, CE Plants - NUREG 1432 Requirements for That Sys ML18067A6771997-09-0303 September 1997 Proposed Tech Specs,Deleting Snubber Operability Requiements in LCO 3.20 & Snubber Testing Requirements Currently in SR 4.16 ML18067A6001997-06-27027 June 1997 Proposed Tech Specs Revising Electrical Power Systems ML18067A4701997-03-28028 March 1997 Proposed Tech Specs Pp Supporting Completion of Administrative Control Changes Proposed in 951211 Safety Evaluation for Amend 174 ML20137H5901997-03-27027 March 1997 Proposed Tech Specs Change Request Re Change in Co Name ML18067A4531997-03-26026 March 1997 Proposed Tech Specs,Allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18067A5151997-02-11011 February 1997 Rev 5 to Health Physics Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML18065B2011996-12-24024 December 1996 Rev 11 to Offsite Dose Calculation Manual. ML18065B0861996-11-27027 November 1996 Corrected Pages 14 & 15 to Rev 18 to EM-09-02, Inservice Testing Program Relief Request Valve Relief Request 20. ML20134P4071996-11-19019 November 1996 Suitability,Training & Qualification Plan, Rev 16 ML20137G3871996-10-29029 October 1996 Rev 6 to Relocated TS Per NRC GL 89-09 ML18065B0331996-10-25025 October 1996 Proposed Tech Specs Change Request,Revising Administrative Controls Sections of Plant TS ML18065B0171996-10-18018 October 1996 Proposed Tech Specs,Providing Info Necessary for Completion of Review & Approval Process Re Writting Commitment Be Made That Description of Palisades Operating Requirements Manual Will Be Added to FSAR ML18065A9551996-10-0202 October 1996 Proposed Tech Specs 4.6.1 Re Safety Injection sys,4.6.2 Re Containment Spray sys,4.6.3 Re Pumps & 4.6.4 Re Valves ML18065A9111996-09-0404 September 1996 Proposed Tech Specs 3.7, Electrical Power Systems. ML20117K9581996-09-0303 September 1996 Proposed Tech Specs,Revising Administrative Control & Resolution of NRC Comments ML18065A8631996-08-14014 August 1996 Proposed TS Table 4.3.2 Re Miscellaneous Surveillance Items ML18065A7661996-06-10010 June 1996 Expired Temporary Change O-96-044 to Rev 17 to SOP-17A, Clean Radwaste Sys. ML18065A7651996-06-10010 June 1996 Cancelled Tcn O-96-045 to Rev 17 to SOP-17B, Dirty Radwaste Sys. ML18065A5861996-03-29029 March 1996 Proposed Tech Specs,Upgrading Plant TS & Bases to Emulate STS for Combustion Engineering Plants,NUREG-1432,Rev 1 ML18065A8021996-02-21021 February 1996 Rev 2 to EM-09-13, ISI Pressure Testing Program. ML20137G3631996-02-16016 February 1996 Rev 10 to Offsite Dose Calculation Manual 1999-09-30 |
Text
CONSUMERS POWER COMPANY PALISADES PLANT -DOCKET 50-255 -LICENSE DPR-20 PROPOSED TECHNICAL SPECIFICATIONS CHANGE REQUEST PROPOSED PAGES /! 1 PAGE p 000255 . PDR MI0583-0016B-NL02 TABLE 4. 3.2 -----*--------------------------Misceu-a-neous Stirveillance--ifems Equipment Method Frequency
- 1. Regenerative Heat Exchanger
- a. Primary Side Shell to Tube Sheet Welds Volumetric 5-Year Maximum Interval (100%) b. Primary Head Volumetric Year Maximum Interval (100%) 2. Primary Coolant Pump Flywheels Volumetric 100% Upper Flywheel Each Refueling TABLE 4.3.3 Reactor Vessel Surveillance Coupon Removal Schedule Capsule Refueling Number Capsule 1 Target Removal Time Number Primary -Optional Location EFPY @ Refuel No A-240 2 Outside Core Barrel 2.26 @ 23 W-290 5 11 Vessel Wall 4.33 @ 5 T-330 5 20 Above Core 4.33 @ 5 W-110 11 5 Vessel Wall 9.21 *@ 11 W-100 20 25 Vessel Wall 16.5 @ 20 T-150 20 5
- Above Core 16'.5 @ 20 W-280 25 -20 Vessel Wall 20.6 @ 25 W-260 35 39 Vessel Wall 28.7 @ 35 W-80 39 35 Vessel Wall 32.0 @ 39 1 Refer to Pafisades FSAR, Volume 2, Section 4.5.3, Figure 11 for illustration of capsule locations.
2 EFPY based on 2530 MWt power rating. 3 2.26 EFPY from BCL 585-12 Report, March 13, 1979. nu0583-0248a-43-71 4-23 PROPOSED 2 I I l . I I l ! I ; I I I I I
Retrieved from "https://kanterella.com/w/index.php?title=ML18051A518&oldid=1197788"