ML18051A518

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Changes Re Reactor Vessel Surveillance Coupon Removal Schedule
ML18051A518
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/03/1983
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18051A516 List:
References
NUDOCS 8308100360
Download: ML18051A518 (2)


Text

CONSUMERS POWER COMPANY PALISADES PLANT - DOCKET 50-255 - LICENSE DPR-20 PROPOSED TECHNICAL SPECIFICATIONS CHANGE REQUEST PROPOSED PAGES

/!

1 PAGE

(--~jJggF0-5aaoao~~

p 000255 PDR

~

MI0583-0016B-NL02

TABLE 4. 3.2

-- -Misceu-a-neous Stirveillance--ifems Equipment Method Frequency

1.

Regenerative Heat Exchanger

a.

Primary Side Shell to Tube Sheet Welds Volumetric 5-Year Maximum Interval (100%)

b.

Primary Head Volumetric Year Maximum Interval (100%)

2.

Primary Coolant Pump Flywheels Volumetric 100% Upper Flywheel Each Refueling TABLE 4.3.3 Reactor Vessel Surveillance Coupon Removal Schedule Capsule Refueling Number Capsule 1 Target Removal Time Number Primary - Optional Location EFPY @ Refuel No A-240 2

Outside Core Barrel 2.26 @ 23 W-290 5

11 Vessel Wall 4.33 @ 5 T-330 5

20 Above Core 4.33 @ 5 W-110 11 5

Vessel Wall 9.21 *@ 11 W-100 20 25 Vessel Wall 16.5 @ 20 T-150 20 5

  • Above Core 16'.5 @ 20 W-280 25 20 Vessel Wall 20.6 @ 25 W-260 35 39 Vessel Wall 28.7 @ 35 W-80 39 35 Vessel Wall 32.0 @ 39 1Refer to Pafisades FSAR, Volume 2, Section 4.5.3, Figure 11 for illustration of capsule locations.

2EFPY based on 2530 MWt power rating.

3 2.26 EFPY from BCL 585-12 Report, March 13, 1979.

nu0583-0248a-43-71 4-23 PROPOSED 2

I I

l

. I I l !

I I I I I I