Letter Sequence Other |
---|
|
|
MONTHYEARML0507302212005-01-27027 January 2005 1/27/05- Official Transcript of Proceedings-NRC, Brunswick Steam Electric Plant EIS Public Meeting: Afternoon Session. Pages 1-39 Project stage: Request ML0505502622005-02-24024 February 2005 Request for Additional Information Regarding Severe Accident Mitigation Alternatives (SAMA) for the Brunswick Steam Electric Plant, Units 1 and 2 Project stage: RAI ML0509102032005-04-0101 April 2005 Summary of Conference Call Held on January 12, 2005 Between the NRC and Carolina Power & Light Concerning Draft Requests for RAIs Pertaining to Brunswick Project stage: Draft RAI ML0512300642005-04-0606 April 2005 Draft SAMA Response Project stage: Draft Other ML0511902312005-04-29029 April 2005 4-29-2005-Summary of Teleconference Conducted on 03/31/2005, with Carolina Power & Light Company (Cp&L), to Discuss Severe Accident Mitigation Alternatives (SAMA) Requests for Additional Information (Rais) for Brunswick Steam Electric Plant Project stage: RAI ML0513702822005-05-16016 May 2005 5-16-05 - Summary of Teleconference of Conducted on April 7, 2005, with Carolina Power & Light Company (Cp&L) to Discuss the Severe Accident Mitigation Alternatives (SAMA) Requests for Additional Information (Rais) for Brunswick Steam Elect Project stage: RAI ML0514404792005-05-24024 May 2005 5-24-05- Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the Applications by Carolina Power & Light Company, Inc (Cp&L) for Renewal of the Operating Licenses for Brunswick Steam Electric Plant, Units 1 Project stage: Approval ML0524301382005-08-30030 August 2005 Notice of Availability of the Draft Plant-Specific Supplement 25 to the Generic Environmental Impact Statement (GEIS) Project stage: Draft Other ML0533204682005-10-18018 October 2005 Preliminary Results of Environmental Review Brunswick Steam Electric Plant, Units 1 and 2, Nuclear Regulatory Commission, October 18, 2005 Project stage: Other ML0533204332005-10-18018 October 2005 Official Transcript of Proceedings, Nuclear Regulatory Commission, Brunswick Steam Electric Plant, Draft EIS: Evening Public Meeting, Southport, Nc, Tuesday, October 18, 2005. Pages 1-24 ML0533204042005-10-18018 October 2005 Official Transcript of Proceedings, Nuclear Regulatory Commission, Brunswick Steam Electric Plant, Draft EIS: Afternoon Meeting, Southport, Nc, Tuesday, October 18, 2005, Pages 1-41 ML0600902822006-01-0404 January 2006 1/4/06 - Project Manager Change for the License Renewal Environmental Review for Brunswick Steam Electric Plant, (TAC Nos MC4641 and MC4642) Project stage: Other ML0610700772006-04-14014 April 2006 4/14/06 - Final Supplement 25 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Brunswick Steam Electric Plant, Units 1 and 2 (TAC Nos. MC4641 and MC4642) Project stage: Other ML0610302242006-04-14014 April 2006 4/14/06 - Notice of Availability of the Final Supplement 25 to the Generic Environmental Impact Statement (Geis) Regarding License Renewal for Brunswick Steam Electric Plant, Units 1 and 2 (Tac Nos. MC4641 and MC4642) Project stage: Other ML0609004802006-04-30030 April 2006 NUREG-1437 Supp 25, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Brunswick Steam Electric Plant, Units 1 & 2 Final Report Project stage: Acceptance Review ML0613601312006-05-12012 May 2006 Cost-Beneficial Severe Accident Mitigation Alternatives (Samas) Identified During the License Renewal Review for the Brunswick Steam Electric Plant, Units 1 and 2 Project stage: Other 2005-05-16
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20243012023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23212B2682023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 ML22307A1762022-11-0707 November 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) IR 05000324/20220032022-11-0707 November 2022 Integrated Inspection Report 05000324/2022003 and 05000325/2022003 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000324/20220052022-08-24024 August 2022 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2022005 and 05000325/2022005) ML22230D0692022-08-22022 August 2022 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident IR 05000324/20220022022-08-0505 August 2022 Integrated Inspection Report 05000324/2022002 and 05000325/2022002 IR 05000324/20220102022-06-27027 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000324 2022010 and 05000325 2022010 ML22028A1742022-05-12012 May 2022 Issuance of Amendment Nos. 309 and 337 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-580, Revision 1 IR 05000324/20220012022-05-10010 May 2022 Integrated Inspection Report 05000324/2022001 and 05000325/2022001 ML22119A1352022-05-0909 May 2022 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000325/2022403; 05000324/2022403 ML22082A2682022-05-0202 May 2022 Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML22102A0502022-04-11011 April 2022 301 Corporate Notification Letter IR 05000324/20224012022-03-16016 March 2022 Security Baseline Inspection Report 05000324/2022401 and 05000325/2022401 ML22054A2152022-03-0808 March 2022 Correction to Amendments to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications IR 05000324/20210062022-03-0202 March 2022 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 (Reports No. 05000324/2021006 and 05000325/2021006) IR 05000324/20210042022-02-14014 February 2022 Integrated Inspection Report 05000324/2021004 and 05000325/2021004 ML22035A1262022-02-0909 February 2022 Withdrawal of Exemption Request from the Requirements of 10 CFR Part 50, Appendix E, Section IV.F.2.d (EPID L-2021-LLE-0055 (COVID-19)) ML21354A5032022-01-24024 January 2022 Requested Exemption from 10 CFR 50, Appendix E, Section IV.F.2.D Not Required (EPID L-2021-LLE-0055 (COVID-19)) ML22018A1842022-01-18018 January 2022 Notification of Brunswick Steam Electric Plant, Units 1 & 2 - Design Bases Assurance Inspection - U.S. Nuclear Regulatory Inspection Report 05000324/2022010 and 05000325/2022010 ML21348A7192021-12-21021 December 2021 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times 2023-09-25
[Table view] |
Text
April 14, 2006U.S. Environmental Protection Agency Office of Federal Activities NEPA Compliance Division, EIS Filing SectionAriel Rios Building (South Oval Lobby)
Mail Code 2252-A, Room 7241 1200 Pennsylvania Avenue, NW Washington, DC 20044
SUBJECT:
FINAL SUPPLEMENT 25 TO THE GENERIC ENVIRONMENTAL IMPACTSTATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS, REGARDING BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 (TAC NOS. MC 4641 AND MC4642)
Dear Sir or Madam:
The following documents are enclosed for official filing with the U.S. Environmental ProtectionAgency:1.Five copies of the Final Supplement 25 to NUREG-1437, ?Generic EnvironmentalImpact Statement for License Renewal of Nuclear Plants," regarding the license renewal of Brunswick Steam Electric Plant, Units 1 and 2.2. Five copies of the U.S. Nuclear Regulatory Commission's (NRC) distribution list forthe Final Supplement 25 to NUREG-1437.Simultaneously with this filing, a copy of the final Supplement 25 is being mailed to interestedFederal and State agencies, industry organizations, interest groups, and members of the public.
A copy of this document has also been placed in the NRC's Agencywide Document Access andManagement System (ADAMS). ADAMS is located on the NRC's Web site athttp://www.nrc.gov/reading-rm/web-based.html. The accession number for the finalSupplement 25 to the GEIS is ML060900480. The draft Supplement 25 to NUREG-1437 was forwarded to you on August 30, 2005. If furtherinformation is required, please contact the NRC Environmental Project Manager,Ms. Alicia Williamson, by telephone at 301-415-1878 or by e-mail at arw1@nrc.gov.Sincerely,/RA/Frank P. Gillespie, DirectorDivision of License Renewal Office of Nuclear Reactor RegulationDocket Nos. 50-325 and 50-324
Enclosures:
As statedcc w/encls: See next page The draft Supplement 25 to NUREG-1437 was forwarded to you on August 30, 2005. If furtherinformation is required, please contact the NRC Environmental Project Manager,Ms. Alicia Williamson, by telephone at 301-415-1878 or by e-mail at arw1@nrc.gov.Sincerely,/RA/Frank P. Gillespie, DirectorDivision of License Renewal Office of Nuclear Reactor RegulationDocket Nos. 50-325 and 50-324
Enclosures:
As statedcc w/encls: See next page DISTRIBUTION: See next pageAdams Accession Nos.: 1. Ltr to EPA: ML0610700772. Supplement 25, NUREG-1437 "GEIS": ML0609004803. Pkg.: ML061070098DOCUMENT NAME: E:\Filenet\ML061070077.wpdOFFICEDLR:LADLR:REBA:GSPM:DLR:REBA:GSDLR:REBB:SCDLR:DDNAMEY. EdmondsC. GuerreroA. WilliamsonR. FranovichF. GillespieDATE04/13/0604/13/0604/13/0604/14/0604/14/06OFFICIAL RECORD COPY Memo to: U.S. Environmental Protection Agency, From: Frank P. Gillespie, dated: April 14, 2006
SUBJECT:
FINAL SUPPLEMENT 25 TO THE GENERIC ENVIRONMENTAL IMPACTSTATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS, REGARDING BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 (TAC NOS. MC 4641AND MC4642)PUBLICHard CopyRLEP/Environmental R/FYEdmondsE-MailRidsOgcMailCenterACRS FGillespie/P. T. Kuo (RidsNrrDlr)
A. Kugler (RidsNrrDlrReba)
R. Franovich A. Williamson R. Emch C. Guerrero B. Mozafari S. Hernandez S. K. Mitra E. DiPaolo, SRI J. Austin, RI J. (John) Szeligowski, Earth Tech T. Madden, OCA OGC (RidsOgcMailCenter)
OPA DLR/REBA R/F Brunswick Steam Electric PlantUnits 1 and 2 cc:
Mr. David T. ConleyAssociate General Counsel II -
Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. David R. Sandifer, ChairpersonBrunswick County Board of Commissioners Post Office Box 249 Bolivia, North Carolina 28422Resident InspectorU. S. Nuclear Regulatory Commission 8470 River Road Southport, North Carolina 28461Mr. John H. O'Neill, Jr.Shaw, Pittman, Potts & Trowbridge 2300 N Street NW Washington, DC 20037-1128Ms. Beverly Hall, Section ChiefDivision of Radiation Protection N.C. Department of Environment and Natural Resources 3825 Barrett Dr.
Raleigh, North Carolina 27609-7721 Mr. Ben WaldrepPlant General Manager Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461-0429 Public Service CommissionState of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211Ms. Margaret A. ForceAssistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Mr. Robert P. GruberExecutive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326Mr. T. P. ClearyDirector - Site Operations Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461-0429Mr. Norman R. Holden, MayorCity of Southport 201 East Moore Street Southport, North Carolina 28461
Mr. Warren Lee Emergency Management Director New Hanover County Department of Emergency Management Post Office Box 1525 Wilmington, North Carolina 28402-1525Mr. Chris L. Burton, ManagerPerformance Evaluation and Regulatory Affairs PEB 7 Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551 Brunswick Steam Electric PlantUnits 1 and 2 cc:
Mr. Edward T. O'NeillManager - Support Services Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461Mr. Allen K. BrittainSuperintendent, Security Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.
P.O. Box 10429 Southport, North Carolina 28461-0429Mr. Michael HeathBrunswick Steam Electric Plant P.O. Box 10429 Southport, North Carolina 28461-0429Mr. Talmage B. ClementsManager - License Renewal Progress Energy P.O. Box 1551 Raleigh, North Carolina 27602Mr. James RossNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708Ms. IIene Brown NCUW William Randall Library601 S. College Rd.
Wilmington, NC 28403-5616Ms. Cynthia Tart3404 E. Yacht Dr.
Oak Island, NC 28468Ms. May Moore, CommissionerBrunswick County
P.O. Box 249 Bolivia, NC 28422Ms. Hilary SnowThe State Port Pilot 114 E. Moore Southport 28461Mr. Ken Raber North Carolina Eastern Municipal Power Agency P. O. Box 29513 Raleigh, NC 27626Ms. Vicki Soltis5134 Minnesota Dr.
Southport, NC 28461Ms. Pat Woods3700 Players Club Drive Southport, NC 28461Mr. Joe Woods3700 Players Club Drive Southport, NC 28461Mr. Rob Gandy, City ManagerCity of Southport 201 E Moore Street Southport, NC 28461Mr. Jerry Thrift, Vice PresidentBrunswick Community College
P.O. Box 30 Supply, NC 28462-0030Mr. J. Steven Johnson, DirectorBrunswick County Economic Development Commission Post Office Box 158 25 Courthouse Drive NE Bolivia, NC 28422Mr. J. Leslie Bell, AICP, DirectorBrunswick County Planning Department
P.O. Box 249 Bolivia, NC 28422 Brunswick Steam Electric PlantUnits 1 and 2 cc:
Mr. Pete BenjaminEcological Services Supervisor Raleigh Field Office U.S. Fish and Wildlife Service Post Office Box 33726 Raleigh, NC 27636-3726 Suzanne DorseyBald Head Island Conservancy P.O. Box 3109 Bald Head Island, NC 28401