Callaway Plant, Unit 1, License Amendment, Issuance of Amendment 179 Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (TAC No. MD2361)
ML063320153
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/31/2007
From: Donohew J N
NRC/NRR/ADRO/DORL/LPLIV
To: Naslund C D
Union Electric Co
Donohew J N, NRR/DORL/LP4, 415-1307
Shared Package
ML063320150 List:
References
TAC MD2361
Download: ML063320153 (24)


Text

January 31, 2007Mr. Charles D. NaslundSenior Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT, UNIT 1 - ISSUANCE OF AMENDMENT REGARDINGINOPERABILITY OF SNUBBERS USING THE CONSOLIDATED LINE ITEM IMPROVEMENT PROCESS (TAC NO. MD2361)

Dear Mr. Naslund:

The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosedAmendment No. 179 to Facility Operating License No. NPF-30 for the Callaway Plant, Unit 1.

The amendment consists of changes to the Technical Specifications (TSs) in response to yourapplication dated May 25, 2006 (ULNRC-05264).The amendment revises the TSs by adding Limiting Condition for Operation (LCO) 3.0.8. Thischange is consistent with Revision 4 to Technical Specification Task Force (TSTF) Standard Technical Specification Traveler, TSTF-372, "Addition of LCO 3.0.8, Inoperability of Snubbers."

A notice of availability for this TS improvement using the consolidated line item improvement process was published in the Federal Register on May 4, 2005 (70 FR 23252).A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will beincluded in the Commission's next biweekly Federal Register notice.Sincerely, /RA/Jack Donohew, Senior Project ManagerPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-483

Enclosures:

1. Amendment No. 179 to NPF-302. Safety Evaluationcc w/encls: See next page

Pkg ML063320150 (Amendment ML063320153, TS Pages ML070310627)OFFICENRR/LPL4/PMNRR/LPL4/LATSB/BCOGCNRR/LPL4/BCNAMEJDonohewLFeizollahiTKobetzTCampbellDTerao DATE1/11/071/16/0711/18/061/3/071/17/07 June 2006Callaway Plant, Unit 1 cc:Professional Nuclear Consulting, Inc.

19041 Raines Drive Derwood, MD 20855John O'Neill, Esq.Pillsbury Winthrop Shaw Pittman LLP 2300 N. Street, N.W.

Washington, D.C. 20037Mr. Keith A. Mills, Supervising EngineerRegional Regulatory Affairs/Safety Analysis AmerenUE P.O. Box 620 Fulton, MO 65251U.S. Nuclear Regulatory CommissionResident Inspector Office

8201 NRC Road Steedman, MO 65077-1302Mr. Les H. KanuckelManager, Quality Assurance AmerenUE P.O. Box 620 Fulton, MO 65251Missouri Public Service CommissionGovernor Office Building 200 Madison Street Jefferson City, MO 65102-0360Regional Administrator, Region IVU.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005Mr. H. Floyd GilzowDeputy Director for Policy Missouri Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102-0176Mr. Rick A. MuenchPresident and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KA 66839Mr. Dan I. Bolef, PresidentKay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, MO 63130Mr. Lee Fritz, Presiding CommissionerCallaway County Court House 10 East Fifth Street Fulton, MO 65151Mr. David E. Shafer Superintendent, Licensing Regulatory Affairs AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149Manager, Regulatory AffairsAmerenUE P.O. Box 620 Fulton, MO 65251Mr. Keith G. Henke, PlannerDivision of Community and Public Health Office of Emergency Coordination 930 Wildwood P.O. Box 570 Jefferson City, MO 65102Certrec Corporation4200 South Hulen, Suite 630 Fort Worth, TX 76109Director, Missouri State Emergency Management Agency P.O. Box 116 Jefferson City, MO 65102-0116 UNION ELECTRIC COMPANYCALLAWAY PLANT, UNIT 1DOCKET NO. 50-483AMENDMENT TO FACILITY OPERATING LICENSEAmendment No.179 License No. NPF-301.The Nuclear Regulatory Commission (the Commission) has found that:A.The application for amendment by Union Electric Company (UE, the licensee),dated May 25, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I;B.The facility will operate in conformity with the application, the provisions of theAct, and the rules and regulations of the Commission;C.There is reasonable assurance (i) that the activities authorized by thisamendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations;D.The issuance of this amendment will not be inimical to the common defense andsecurity or to the health and safety of the public; andE.The issuance of this amendment is in accordance with 10 CFR Part 51 of theCommission's regulations and all applicable requirements have been satisfied. 2.Accordingly, the license is amended by changes to the Technical Specifications asindicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-30 is hereby amended to read as follows:2.Technical Specifications and Environmental Protection PlanThe Technical Specifications contained in Appendix A, as revised throughAmendment No. 179 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.3.This amendment is effective as of its date of issuance, and shall be implemented within90 days of the date of issuance.FOR THE NUCLEAR REGULATORY COMMISSION/RA/David Terao, ChiefPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Facility Operating License No. NPF-30 and Technical SpecificationsDate of Issuance: January 31, 2007 ATTACHMENT TO LICENSE AMENDMENT NO. 179FACILITY OPERATING LICENSE NO. NPF-30DOCKET NO. 50-483Replace the following pages of the Facility Operating License and the Appendix A TechnicalSpecifications (TSs) with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.REMOVEINSERT License License- 3 -- 3 -TSsTSs3.0-13.0-13.0-33.0-3 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATIONRELATED TO AMENDMENT NO. 179 TO FACILITY OPERATING LICENSE NO. NPF-30UNION ELECTRIC COMPANYCALLAWAY PLANT, UNIT 1DOCKET NO. 50-48

31.0INTRODUCTION

By application dated May 25, 2006 (Agencywide Documents Access and Management System(ADAMS) Accession No. ML061570423), Union Electric Company (the licensee) proposed an amendment to the Technical Specifications (TSs) for Callaway Plant, Unit 1 (Callaway). The proposed amendment would modify TS requirements for inoperable snubbers by adding Limiting Condition for Operation (LCO) 3.0.8. This change is consistent with Revision 4 to Technical Specification Task Force (TSTF) Standard Technical Specification (STS) Traveler, TSTF-372, "Addition of LCO 3.0.8, inoperability of snubbers." A notice of availability for this TS improvement using the consolidated line item improvement process (CLIIP) was published in the Federal Register on May 4, 2005 (70 FR 23252).On April 23, 2004, the Nuclear Energy Institute (NEI) Risk-Informed Technical SpecificationsTask Force (TSTF) submitted a proposed change, TSTF-372, Revision 4, to the NRC on behalf of the industry (TSTF-372, Revisions 1 through 3, were prior draft iterations). TSTF-372, Revision 4, is a proposal to add an LCO allowing a delay time for entering a supported system TS, when the inoperability is due solely to an inoperable snubber, if the risk is assessed and managed. The postulated seismic event requiring snubbers is a low-probability occurrence, and the overall TS system safety function would still be available for the vast majority of anticipated challenges.This proposal is one of the industry's initiatives being developed under the risk-informed TSprogram. These initiatives are intended to maintain or improve safety through the incorporation of risk assessment and management techniques in TSs, while reducing unnecessary burden and making TS requirements consistent with the Commission's other risk-informed regulatory requirements, in particular, the Maintenance Rule.The proposed change adds a new LCO, LCO 3.0.8, to Section 3.0, "Limiting Condition forOperation (LCO) Applicability," of the TSs. LCO 3.0.8 would allow licensees to delay declaring an LCO not met for equipment that is supported by snubbers unable to perform their associated support functions when the risk associated with the delay is assessed and managed. This new LCO 3.0.8 states: When one or more required snubbers are unable to perform their associated supportfunction(s), any affected supported LCO(s) are not required to be declared not met solely for this reason if risk is assessed and managed, and:a.The snubbers not able to perform their associated support function(s) areassociated with only one train or subsystem of a multiple train or subsystem supported system or are associated with a single train or subsystem supported system and are able to perform their associated support function within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />; or b.The snubbers not able to perform their associated support function(s) areassociated with more than one train or subsystem of a multiple train or subsystem supported system and are able to perform their associated support function within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.At the end of the specified period the required snubbers must be able to perform theirassociated support function(s), or the affected supported system LCO(s) shall be declared not met.In adding the new LCO to Section 3.0 of the TSs, LCO 3.0.1 would be revised to state that"LCOs shall be met during the MODES or other specified conditions in the Applicability, exceptas provided in LCO 3.0.2, and LCO 3.0.7, and LCO 3.0.8." The change is in strikeout andbold.The NRC staff's model safety evaluation (SE) was issued in the Federal Register CLIIP noticeof availability for TSTF-372, Revision 4 (ADAMS Accession No. ML051160013). In its submittal, the licensee said that it reviewed the NRC staff's model SE, as well as the information provided to support TSTF-372, and has concluded that the justifications presented in the NEI TSTF-373, Revision 4, proposal and NRC staff's model SE are applicable to Callaway, and justify the proposed amendment.

2.0REGULATORY EVALUATION

In Section 50.36 of Title 10 of the Code of Federal Regulations (10 CFR 50.36), theCommission established its regulatory requirements related to the content of the TSs. Pursuant to 10 CFR 50.36, TSs are required to include items in the following five specific categories related to station operation: (1) safety limits, limiting safety system settings, and limiting control settings; (2) LCOs; (3) surveillance requirements (SRs); (4) design features; and (5) administrative controls. The rule does not specify the particular requirements to be included in a plant's TSs. As stated in 10 CFR 50.36(c)(2)(i), the "[l]imiting conditions for operation are the lowest functional capability or performance levels of equipment required for safe operation of the facility. When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specifications ..." In TS Se ction 3.0, "LCO and SR Applicability," the LCOs given define therules and practices for complying with the LCOs listed in the other sections of the TSs. Snubbers are used in areas where restricting thermal growth during normal operation wouldinduce excessive stresses in the piping nozzles or other equipment. Although snubbers are classified as component standard supports, they are not designed to provide any transmission of force during normal plant operations. However, in the presence of dynamic transient loadings, which are induced by seismic events as well as by plant accidents and transients, a snubber functions as a rigid support. The location and size of snubbers are determined by stress analyses based on different combinations of load conditions, which depend on the design classification of the particular piping.Prior to the conversion to the improved Standard TSs (STS), such as NUREG-1431 forWestinghouse Plants, including Callaway, TS requirements applied directly to snubbers. These requirements included:

!A requirement that snubbers be functional and in service when the supportedequipment is required to be operable,!A requirement that snubber removal for testing be done only during plantshutdown,!A requirement that snubber removal for testing be done on a one-at-a-time basiswhen supported equipment is required to be operable during shutdown, !A requirement to repair or replace, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, any snubbers found to beinoperable during operation in Modes 1 through 4, to avoid declaring any supported equipment inoperable,!A requirement that each snubber be demonstrated operable by periodic visualinspections, and

!A requirement to perform functional tests on a representative sample of at least10 percent of plant snubbers, at least once every 18 months during shutdown.In the late 1980s, a joint initiative of the U.S. Nuclear Regulatory Commission (NRC) andindustry was undertaken to improve the STS. This effort identified snubbers as candidates for relocation to a licensee-controlled document, based on the fact that the TS requirements for snubbers did not meet any of the four criteria in 10 CFR 50.36(c)(2)(ii) for inclusion in the improved STS. The NRC approved the relocation without placing any restriction on the use of the relocated requirements. However, this relocation resulted in different interpretations between the NRC and the industry regarding its implementation. The NRC has stated that since snubbers are supporting safety equipment that is in the TS, thedefinition of OPERABILITY must be used to immediately evaluate equipment supported by a removed snubber and, if found inoperable, the appropriate TS-required actions must be entered. This interpretation has in practice eliminated the 72-hour delay to enter the actions for the supported equipment that existed prior to the conversion to the improved STS (the only exception is if the supported system has been analyzed and determined to be OPERABLE without the snubber). The industry has argued that since the NRC approved the relocation without placing any restriction on the use of the relocated requirements, the licensee-controlled document requirements for snubbers should be invoked before the supported system's TSrequirements become applicable. The industry's interpretation would, in effect, restore the 72-hour delay to enter the actions for the supported equipment that existed prior to the conversion to the improved STS. The industry's proposal would allow a time delay for all conditions, including snubber removal for testing at power. The option to relocate the snubbers to a licensee-controlled document, as part of theconversion to improved STS, has resulted in non-uniform and inconsistent treatment of snubbers. On the one hand, licensees that have relocated snubbers from their TSs are allowed to change the TS requirements for snubbers under 10 CFR 50.59, but they are not allowed a 72-hour delay before they enter the actions for the supported equipment. On the other hand, plants that have not converted to improved STS have retained the 72-hour delay if snubbers are found to be inoperable, but they are not allowed to use 10 CFR 50.59 to change TS requirements for snubbers. It should also be noted that a few plants that have converted to the improved STS chose not to relocate the snubbers to a licensee-controlled document and, thus, retained the 72-hour delay. In addition, it is important to note that, unlike plants that have not relocated, plants that have relocated can perform functional tests on the snubbers at power (as long as they enter the actions for the supported equipment) and, at the same time, can reduce the testing frequency (as compared to plants that have not relocated) if it is justified by 10 CFR 50.59 assessments. Some potential undesirable consequences of this inconsistent treatment are:

!Performance of testing during crowded time period windows when the supportedsystem is inoperable with the potential to reduce the snubber testing to a minimum since the snubber requirements that have been relocated from TSs are controlled by the licensee,!Performance of testing during crowded time period windows when the supportedsystem is inoperable with the potential to increase the unavailability of safety systems, and

!Performance of testing and maintenance on snubbers affecting multiple trains ofthe same supported system during the 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> allotted before entering MODE 3 under LCO 3.0.3.The Callaway TSs were converted to the improved TSs in NUREG-1431, for Westinghouseplants, in Amendment No. 133 dated May 28, 1999.To remove the inconsistency in the treatment of snubbers among plants, the TSTF proposed arisk-informed TS change that introduces a delay time before entering the actions for the supported equipment, when one or more snubbers are found inoperable or removed for testing, if the risk is assessed and managed. Such a delay time will provide needed flexibility in the performance of maintenance and testing during power operation and, at the same time, will enhance overall plant safety by:

!Avoiding unnecessary unscheduled plant shutdowns and, thus, minimizing planttransition and realignment risks, 1The following technical evaluation is presented in terms of the bounding assessment ofthis change for all commercial nuclear power plants, including Callaway, performed as part of the approval of TSTF-372, Revision 4, and publication of the CLIIP notices.

!Avoiding reduced snubber testing, thereby increasing the availability of snubbersto perform their supporting function,!Allowing most of the required testing and maintenance to occur during the delaytime when the supported system is available to mitigate most challenges and, thus, avoiding increases in safety-system unavailability, and

!Providing explicit risk-informed guidance in areas where that guidance currentlydoes not exist, such as the treatment of snubbers impacting more than one redundant train of a supported system.

3.0TECHNICAL EVALUATION

1The industry submitted TSTF-372, Revision 4, "Addition of LCO 3.0.8, Inoperability ofSnubbers," in support of the proposed TS change. This submittal (Reference 1) documents a risk-informed analysis of the proposed TS change. Probabilistic risk assessment (PRA) results and insights are used, in combination with deterministic and defense-in-depth arguments, to identify and justify delay times for entering the actions for the supported equipment associated with inoperable snubbers at nuclear power plants. This evaluation is performed in accordance with guidance provided in Regulatory Guides (RGs) 1.174 and 1.177 (References 2 and 3, respectively).The risk impact associated with the proposed delay times for entering the TS actions for thesupported equipment was assessed using the same approach as that used for allowed completion time (CT) extensions. Therefore, the risk assessment was performed following the three-tiered approach recommended in RG 1.177 for evaluating proposed extensions in currently allowed CTs:

!The first tier involves the assessment of the change in plant risk due to theproposed TS change. Such risk change is expressed (1) by the change in the average yearly core damage frequency (CDF) and the average yearly largeearly release frequency (LERF), and (2) by the incremental conditional coredamage probability (ICCDP) and the incremental conditional large early release probability (ICLERP). The assessed CDF and LERF values are compared toacceptance guidelines, consistent with the Commission's Safety Goal Policy Statement as documented in RG 1.174, so that the plant's average baseline risk is maintained within a minimal range. The assessed ICCDP and ICLERP values are compared to acceptance guidelines provided in RG 1.177, which aim at ensuring that the plant risk does not increase unacceptably during the period the equipment is taken out of service.

!The second tier involves the identification of potentially high-risk configurationsthat could exist if equipment in addition to that associated with the change were to be taken out of service simultaneously, or other risk-significant operationalfactors, such as concurrent equipment testing, were also involved. The objective is to ensure that appropriate restrictions are in place to avoid any potential high-risk configurations.

!The third tier involves the establishment of an overall configuration riskmanagement program (CRMP) to ensure that potentially risk-significant configurations resulting from maintenance and other operational activities are identified. The objective of the CRMP is to manage configuration-specific risk by appropriate scheduling of plant activities and/or appropriate compensatory measures.A simplified bounding risk assessment was performed to justify the proposed addition ofLCO 3.0.8 to the TS. This approach was necessitated by (1) the general nature of the proposed TS changes (i.e., they apply to all plants and are associated with an undetermined number of snubbers that are not able to perform their function), (2) the lack of detailed engineering analyses that establish the relationship between earthquake level and supported-system pipe failure probability when one or more snubbers are inoperable, and (3) the lack of seismic risk assessment models for most plants. The simplified risk assessment is based on the following major assumptions, which the NRC staff finds acceptable, as discussed below:

!The accident sequences contributing to the risk increase associated with theproposed TS changes are assumed to be initiated by a seismically-induced loss-of-offsite power (LOOP) event with concurrent loss of all safety-system trains supported by the out-of-service snubbers. In the case of snubbers associated with more than one train (or subsystem) of the same system, it is assumed that all affected trains (or subsystems) of the supported system have failed. This assumption was introduced to allow the performance of a simple bounding risk assessment approach, which is applicable to all plants. This approach was selected due to the lack of detailed plant-specific seismic risk assessments for most plants and the lack of fragility data for piping when one or more supporting snubbers are inoperable.

!The LOOP event is assumed to occur due to the seismically-induced failure ofthe ceramic insulators used in the power distribution systems. These ceramic insulators have a high confidence (95 percent) of low probability (5 percent) of failure (HCLPF) of about 0.1g, expressed in terms of peak ground acceleration.

Thus, a magnitude 0.1g earthquake is conservatively assumed to have a 5 percent probability of causing a LOOP-initiating event. The fact that no LOOP events caused by higher magnitude earthquakes were considered is justified because (1) the frequency of earthquakes decreases with increasing magnitude and (2) historical data (References 4 and 5) indicate that the mean seismic capacity of ceramic insulators (used in seismic PRAs), in terms of peak ground acceleration, is about 0.3g, which is significantly higher than the 0.1g HCLPF value. Therefore, the simplified analysis, even though it does not consider LOOP events caused by earthquakes of a magnitude higher than 0.1g, bounds a detailed analysis that would use mean seismic failure probabilities (fragilities) for the ceramic insulators.

!Analytical and experimental results obtained in the mid-1980s as part of theindustry's "Snubber Reduction Program" (References 4 and 6) indicated that piping systems have large margins against seismic stress. The assumption that a magnitude 0.1g earthquake would cause the failure of all safety-system trains supported by the out-of-service snubbers is very conservative, because safety piping systems could withstand much higher seismic stresses even when one or more supporting snubbers are out of service. The actual piping failure probability is a function of the stress allowable and the number of snubbers removed for maintenance or testing. Since the licensee-controlled testing is done on only a small (about 10 percent) representative sample of the total snubber population, typically only a few snubbers supporting a given safety system are out for testing at a time. Furthermore, since the testing of snubbers is a planned activity, licensees have flexibility in selecting a sample set of snubbers for testing from a much larger population by conducting configuration-specific engineering and/or risk assessments. Such a selection of snubbers for testing provides confidence that the supported systems would perform their functions in the presence of a design-basis earthquake and other dynamic loads and, in any case, the risk impact of the activity will remain within the limits of acceptability defined in risk-informed RGs 1.174 and 1.177.

!The analysis assumes that one train (or subsystem) of all safety systems isunavailable during snubber testing or maintenance (an entire system is assumed unavailable if a removed snubber is associated with both trains of a two-train system). This is a very conservative assumption for the case of corrective maintenance, since it is unlikely that a visual inspection will reveal that one or more snubbers across all supported systems are inoperable. This assumption is also conservative for the case of the licensee-controlled testing of snubbers, since such testing is performed only on a small representative sample.

!In general, no credit is taken for recovery actions and alternative means ofperforming a function, such as the function performed by a system assumed failed (e.g., when LCO 3.0.8b applies). However, most plants have reliable alternative means of performing certain critical functions. For example, feed and bleed (F&B) can be used to remove heat in most pressurized-water reactors (PWRs) when auxiliary feedwater (AFW), the most important system in mitigating LOOP accidents, is unavailable. Similarly, if high-pressure makeup (e.g., reactor core isolation cooling) and heat removal capability (e.g.,

suppression pool cooling) are unavailable in boiling-water reactors (BWRs),

reactor depressurization in conjunction with low-pressure makeup (e.g.,

low-pressure coolant injection) and heat removal capability (e.g., shutdown cooling) can be used to cool the core. A 10 percent failure probability for recovery actions to provide core cooling using alternative means is assumed for Diablo Canyon, the only West Coast PWR plant with F&B capability, when a snubber impacting more than one train of the AFW system (i.e., when LCO 3.0.8b is applicable) is out of service. This failure probability value is significantly higher than the value of 2.2E-2 used in Diablo Canyon's PRA. Furthermore, Diablo Canyon has analyzed the impact of a single limiting snubber failure, and concluded that no single snubber failure would impact two trains of the AFW. No credit for recovery actions to provide core cooling using alternative means is necessary for West Coast PWR plants with no F&B capability, because it has been determined that there is no single snubber whose non-functionality would disable two trains of an AFW in a seismic event of a magnitude up to the plant's safe-shutdown earthquake (SSE). It should be noted that a similar credit could have been applied to most Central and Eastern U.S. plants, but this was not necessary to demonstrate the low-risk impact of the proposed TS change due to the lower earthquake frequencies at Central and Eastern U.S. plants as compared to West Coast plants.

!The earthquake frequency at the 0.1g level was assumed to be 1E-3/year forCentral and Eastern U.S. plants and 1E-1/year for West Coast plants. Each of these two values envelop the range of earthquake frequency values at the 0.1g level, for Eastern U.S. and West Coast sites, respectively (References 5 and 7).

!The risk impact associated with non-LOOP accident sequences (e.g.,seismically-initiated loss-of-coolant accident (LOCA) or anticipated transient without scram sequences) was not assessed. However, this risk impact is small compared to the risk impact associated with the LOOP accident sequences modeled in the simplified bounding risk assessment. Non-LOOP accident sequences, due to the ruggedness of nuclear power plant designs, require seismically-induced failures that occur at earthquake levels above 0.3g. Thus, the frequency of earthquakes initiating non-LOOP accident sequences is much smaller than the frequency of seismically-initiated LOOP events. Furthermore, because of the conservative assumption made for LOOP sequences that a 0.1g level earthquake would fail all piping associated with inoperable snubbers, non-LOOP sequences would not include any more failures associated with inoperable snubbers than would LOOP sequences. Therefore, the risk impact of inoperable snubbers associated with non-LOOP accident sequences is small compared to the risk impact associated with the LOOP accident sequences modeled in the simplified bounding risk assessment.

!The risk impact of dynamic loadings other than seismic loads is not assessed. These shock-type loads include thrust loads, blowdown loads, waterhammer loads, steamhammer loads, LOCA loads, and pipe-rupture loads. However, there are some important distinctions between non-seismic (shock-type) loads and seismic loads which indicate that, in general, the risk impact of the out-of-service snubbers is smaller for non-seismic loads than for seismic loads.

First, while a seismic load affects the entire plant, the impact of a non-seismic load is localized to a certain system or area of the plant. Second, although non-seismic shock loads may be higher in total force and the impact could be as much or more than seismic loads, generally they are of much shorter duration than seismic loads. Third, the impact of non-seismic loads is more plant specific, and, thus, is harder to analyze generically than is the impact of seismic loads.

For these reasons, licensees will be required to confirm, every time LCO 3.0.8a is used, that at least one train of each system that is supported by the inoperablesnubber(s) would remain capable of performing the system's required safety or support functions for postulated-design loads other than seismic loads.3.1Risk Assessment Results and Insights The results and insights from the implementation of the three-tiered approach of RG 1.177 tosupport the proposed addition of LCO 3.0.8 to the TS are summarized and evaluated in the following Sections 3.1.1 to 3.1.3.3.1.1Risk ImpactThe bounding risk assessment approach, discussed in Section 3.0, was implementedgenerically for all U.S. operating nuclear power plants. Risk assessments were performed for two categories of plants, Central and East Coast plants and West Coast plants, based on historical seismic hazard curves (earthquake frequencies and associated magnitudes). The first category, Central and East Coast plants, includes the vast majority of the U.S. nuclear power plant population (Reference 7). For each category of plants, two risk assessments were performed:

!The first risk assessment applies to cases where all inoperable snubbers areassociated with only one train (or subsystem) of the impacted safety systems. It was conservatively assumed that a single train (or subsystem) of each safety system is unavailable. It was also assumed that the probability of non-mitigation using the unaffected redundant trains (or subsystems) is 2 percent. This is a conservative value, given that for core damage to occur under these conditions two or more failures are required.

!The second risk assessment applies to the case where one or more of theinoperable snubbers are associated with multiple trains (or subsystems) of the same safety systems. It was assumed in this bounding analysis, except for West Coast PWR plants, that all safety systems are unavailable to mitigate the accident. Credit for using F&B to provide core cooling is taken for plants having F&B capability (e.g., Diablo Canyon) when a snubber impacting more than one train of the AFW system is inoperable. Credit for one AFW train to provide core cooling is taken for West Coast PWR plants with no F&B capability (e.g., San Onofre), because it has been determined that there is no single snubber whose non-functionality would disable two trains of the AFW in a seismic event of a magnitude up to the plant's SSE.The results of the performed risk assessments, in terms of core damage and large earlyrelease risk impacts, are summarized in Table 1 (below). The first row lists the conditional risk increase, in terms of CDF (core damage frequency), R CDF, caused by the out-of-servicesnubbers (as assumed in the bounding analysis). The second and third rows list the incremental conditional core damage probability (ICCDP) and the incremental conditional large early release probability (ICLERP) values, respectively. For the case where all inoperable snubbers are associated with only one train (or subsystem) of the supported safety systems, the ICCDP was obtained by multiplying the corresponding R CDF value by the time fraction of the proposed 72-hour delay necessary to enter the actions for the supported equipment. Forthe case where one or more of the inoperable snubbers are associated with multiple trains (or subsystems) of the same safety system, the ICCDP was obtained by multiplying the corresponding R CDF value by the time fraction of the proposed 12-hour delay necessary toenter the actions for the supported equipment. The ICLERP values were obtained by multiplying the corresponding ICCDP values by 0.1 (i.e., by assuming that the ICLERP value is an order of magnitude less than the ICCDP). This assumption is conservative, because containment bypass scenarios, such as steam generator tube rupture accidents and interfacing system LOCAs, would not be uniquely affected by the out-of-service snubbers. Finally, the fourth and fifth rows list the assessed CDF and LERF values, respectively. These valueswere obtained by dividing the corresponding ICCDP and ICLERP values by 1.5 (i.e., by assuming that the snubbers are tested every 18 months, as was the case before the snubbers were relocated to a licensee-controlled document). This assumption is reasonable because (1) it is not expected that licensees would test the snubbers more often than what used to be required by the TS, and (2) testing of snubbers is associated with higher risk impact than is the average corrective maintenance of snubbers found inoperable by visual inspection (testing is expected to involve significantly more snubbers out of service than corrective maintenance).

The assessed CDF and LERF values are compared to acceptance guidelines, consistentwith the Commission's Safety Goal Policy Statement as documented in RG 1.174, so that the plant's average baseline risk is maintained within a minimal range. This comparison indicates that the addition of LCO 3.0.8 to the existing TSs would have an insignificant risk impact.Table 1Bounding Risk Assessment Results for Snubbers Impacting a Single Trainand Multiple Trains of a Supported SystemCentral and East Coast PlantsWest Coast PlantsSingle TrainMultiple TrainSingle TrainMultiple TrainR CDF/yr1E-65E-61E-45E-4ICCDP8E-97E-98E-77E-7ICLERP8E-107E-108E-87E-8CDF/yr5E-95E-95E-75E-7LERF/yr5E-105E-105E-85E-8The assessed CDF and LERF values meet the acceptance criteria of 1E-6/year and1E-7/year, respectively, based on guidance provided in RG 1.174. This conclusion is valid without taking any credit for the removal of potential undesirable consequences associated with the current inconsistent treatment of snubbers (e.g., reduced snubber-testing frequency, increased safety-system unavailability, and treatment of snubbers impacting multiple trains) discussed in Section 1 above, and given the bounding nature of the risk assessment. The assessed ICCDP and ICLERP values are compared to acceptance guidelines provided inRG 1.177, which aim to ensure that the plant risk does not increase unacceptably during the period the equipment is taken out of service. This comparison indicates that the addition of LCO 3.0.8 to the existing TS meets the RG 1.177 numerical guidelines of 5E-7 for ICCDP and 5E-8 for ICLERP. The small deviations shown for West Coast plants are acceptable because of the bounding nature of the risk assessments, as discussed in Section 2.The risk assessment results of Table 1 are also compared to guidance provided in the revisedSection 11 of NUMARC 93-01, Revision 2 (Reference 8), endorsed by RG 1.182 (Reference 9),

for implementing the requirements of paragraph (a)(4) of the Maintenance Rule, 10 CFR 50.65.

Such guidance is summarized in Table 2. Guidance regarding the acceptability of conditional risk increase in terms of CDF (i.e., R CDF) for a planned configuration is provided. Thisguidance states that a specific configuration that is associated with a CDF higher than 1E-3/year should not be entered voluntarily. In RG 1.182, the NRC staff did not take a position on the value of 1E-3/year. Since the assessed conditional risk increase, RCDF, is significantlyless than 1E-3/year, NUMARC states that plant configurations including out-of-service snubbers and other equipment may be entered voluntarily if supported by the results of the risk assessment required by 10 CFR 50.65(a)(4), by LCO 3.0.8, or by other TSs.Table 2Guidance for Implementing 10 CFR 50.65(a)(4)R CDFGuidanceGreater than 1E-3/yearConfiguration should not normally be enteredvoluntarily.ICCDPGuidance ICLERPGreater than 1E-5Configuration should not normally beentered voluntarilyGreater than 1E-61E-6 to 1E-5Assess non-quantifiable factors;establish risk management actions1E-7 to 1E-6Less than 1E-6Normal work controlsLess than 1E-7Guidance regarding the acceptability of ICCDP and ICLERP values for a specific plannedconfiguration and the establishment of risk management actions is also provided in NUMARC 93-01. This guidance, as shown in Table 2, states that a specific plant configurationthat is associated with ICCDP and ICLERP values below 1E-6 and 1E-7, respectively, is considered to require "normal work controls." Table 1 shows that for the majority of plants (i.e.,

for all plants in the Central and East Coast category) the conservatively assessed ICCDP and ICLERP values are over an order of magnitude less than what is recommended as the threshold for the "normal work controls" region. For West Coast plants, the conservatively assessed ICCDP and ICLERP values are still within the "normal work controls" region. Thus, the risk contribution from out-of-service snubbers is within the normal range of maintenance activities carried out at a plant. Therefore, plant configurations involving out-of-service snubbers and other equipment may be entered voluntarily if supported by the results of the riskassessment required by 10 CFR 50.65(a)(4), by LCO 3.0.8, or by other TSs. However, based on the results of configuration-specific risk assessments required by 10 CFR 50.65(a)(4) or by other TSs, this simplified bounding analysis indicates that, for West Coast plants, the provisionsof LCO 3.0.8 must be used cautiously and in conjunction with appropriate management actions, especially when equipment other than snubbers is also inoperable.The NRC staff finds that the risk assessment results support the proposed addition ofLCO 3.0.8 to the TS. The risk increase associated with this TS change will be insignificant (based on guidance provided in RGs 1.174 and 1.177) and within the range of risks associated with normal maintenance activities. In addition, LCO 3.0.8 will remove potential undesirable consequences stemming from the current inconsistent treatment of snubbers in the TS, such as reduced frequency of snubber testing, increased safety-system unavailability, and the treatment of snubbers impacting multiple trains.3.1.2Identification of High-Risk ConfigurationsThe second tier of the three-tiered approach recommended in RG 1.177 involves theidentification of potentially high-risk configurations that could exist if equipment, in addition to that associated with the TS change, were to be taken out of service simultaneously. Insights from the risk assessments, in conjunction with important assumptions made in the analysis and defense-in-depth considerations, were used to identify such configurations. To avoid these potentially high-risk configurations, specific restrictions to the implementation of the proposed TS changes were identified.For cases where all inoperable snubbers are associated with only one train (or subsystem) ofthe impacted systems (i.e., when LCO 3.0.8a applies), it was assumed in the analysis that there will be unaffected redundant trains (or subsystems) available to mitigate the seismically-initiated LOOP accident sequences. This assumption implies that there will be at least one success path available when LCO 3.0.8a applies. Therefore, potentially high-risk configurations can be avoided by ensuring that such a success path exists when LCO 3.0.8a applies. Based on a review of the accident sequences that contribute to the risk increase associated with LCO 3.0.8a, as modeled by the simplified bounding analysis (i.e., accident sequences initiated by a seismically-induced LOOP event with concurrent loss of all safety-system trains supported by the out-of-service snubbers), the following restrictions were identified to prevent potentially high-risk configurations:

!For PWR plants, like Callaway, at least one AFW train (including a minimum setof supporting equipment required for its successful operation) not associated with the inoperable snubber(s), must be available when LCO 3.0.8a is used.For cases where one or more of the inoperable snubbers are associated with multiple trains (orsubsystems) of the same safety system (i.e., when LCO 3.0.8b applies), it was assumed in the bounding analysis (except for West Coast plants) that all safety systems are unavailable to mitigate the accident. Credit for using F&B to provide core cooling is taken for plants having F&B capability (e.g., Diablo Canyon) when a snubber impacting more than one train of the AFW system is inoperable. Credit for one AFW train to provide core cooling is taken for West Coast PWR plants with no F&B capability (e.g., San Onofre) because it has been determined that there is no single snubber whose non-functionality would disable more than one train of theAFW in a seismic event of a magnitude up to the plant's SSE. Based on a review of the accident sequences that contribute to the risk increase associated with LCO 3.0.8b (as modeled by the simplified bounding analysis) and on defense-in-depth considerations, the following restrictions were identified to prevent potentially high-risk configurations:

!LCO 3.0.8b cannot be used at West Coast PWR plants with no F&B capabilitywhen a snubber whose non-functionality would disable more than one train of AFW in a seismic event of a magnitude up to the plant's SSE is inoperable (it should be noted, however, that based on information provided by the industry, there is no plant that falls in this category),!When LCO 3.0.8b is used at PWR plants, at least one AFW train (including aminimum set of supporting equipment required for its successful operation) not associated with the inoperable snubber(s), or some alternative means of core cooling (e.g., F&B, firewater system or "aggressive secondary cooldown" using the steam generators) must be available, and 3.1.3Configuration Risk ManagementThe third tier of the three-tiered approach recommended in RG 1.177 involves theestablishment of an overall CRMP to ensure that potentially risk-significant configurations resulting from maintenance and other operational activities are identified. The objective of the CRMP is to manage configuration-specific risk by appropriate scheduling of plant activities and/or appropriate compensatory measures. This objective is met by licensee programs to comply with the requirements of paragraph (a)(4) of the Maintenance Rule (10 CFR 50.65) to assess and manage risk resulting from maintenance activities, and by the TS requiring risk assessments and management using (a)(4) processes if no maintenance is in progress. These programs can support licensee decisionmaking regarding the appropriate actions to manage risk whenever a risk-informed TS is entered. Because the 10 CFR 50.65(a)(4) guidance, the revised (May 2000) Section 11 of NUMARC 93-01, does not currently address seismic risk, licensees adopting this change must ensure that the proposed LCO 3.0.8 is considered with respect to other plant maintenance activities and integrated into the existing 10 CFR 50.65(a)(4) process, whether the process is invoked by a TS or by (a)(4) itself.3.2Summary and Conclusions The option to relocate the snubbers to a licensee-controlled document, as part of theconversion to Improved STS, has resulted in non-uniform and inconsistent treatment of snubbers. Some potential undesirable consequences of this inconsistent treatment of snubbersare:!Performance of testing during crowded time period windows when the supportedsystem is inoperable, with the potential to reduce the snubber testing to a minimum since the relocated snubber requirements are controlled by the

licensee, !Performance of testing during crowded time period windows when the supportedsystem is inoperable, with the potential to increase the unavailability of safety systems, or

!Performance of testing and maintenance on snubbers affecting multiple trains ofthe same supported system during the 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> allotted before entering MODE 3 under LCO 3.0.3.To remove the inconsistency among plants in the treatment of snubbers, licensees areproposing a risk-informed TS change that introduces a delay time before entering the actions for the supported equipment when one or more snubbers are found inoperable or removed for testing. Such a delay time will provide needed flexibility in the performance of maintenance and testing during power operation and, at the same time, will enhance overall plant safety by (1) avoiding unnecessary unscheduled plant shutdowns, thus, minimizing plant transition and realignment risks; (2) avoiding reduced snubber testing thereby increasing the availability of snubbers to perform their supporting function; (3) performing most of the required testing and maintenance during the delay time when the supported system is available to mitigate most challenges, thus avoiding increases in safety-system unavailability; and (4) providing explicit risk-informed guidance in areas in which that guidance currently does not exist, such as the treatment of snubbers impacting more than one redundant train of a supported system.The risk impact of the proposed TS changes was assessed following the three-tiered approachrecommended in RG 1.177. A simplified bounding risk assessment was performed to justify the proposed TS changes. This bounding assessment assumes that the risk increase associated with the proposed addition of LCO 3.0.8 to the TS is associated with accident sequences initiated by a seismically-induced LOOP event with concurrent loss of all safety-system trains supported by the out-of-service snubbers. In the case of snubbers associated with more than one train, it is assumed that all affected trains of the supported system are failed. This assumption was introduced to allow the performance of a simple bounding risk assessment approach with application to all plants and was selected due to the lack of detailed plant-specific seismic risk assessments for most plants and the lack of fragility data for piping when one or more supporting snubbers are inoperable. The impact from the addition of the proposed LCO 3.0.8 to the TS on defense-in-depth was also evaluated in conjunction with the risk assessment results.Based on this integrated evaluation, the NRC staff concludes that the proposed addition ofLCO 3.0.8 to the TS would lead to insignificant risk increases, if any. Indeed, this conclusion is true without taking any credit for the removal of potential undesirable consequences associated with the current inconsistent treatment of snubbers, such as the effects of avoiding a potential reduction in the snubber-testing frequency and increased safety-system unavailability.

Consistent with the staff's approval and inherent in the implementation of TSTF-372, licensees interested in implementing LCO 3.0.8 must, as applicable, operate in accordance with the following stipulations: !Appropriate plant procedures and administrative controls will be used toimplement the following Tier 2 restrictions.

SAt least one AFW train (including a minimum set of supporting equipmentrequired for its successful operation) not associated with the inoperable snubber(s) must be available when LCO 3.0.8a is used at PWR plants.

SAt least one AFW train (including a minimum set of supporting equipmentrequired for its successful operation) not associated with the inoperable snubber(s), or some alternative means of core cooling (e.g., F&B, firewater system or "aggressive secondary cooldown" using the steam generators), must be available when LCO 3.0.8b is used at PWR plants.

SLCO 3.0.8b cannot be used by West Coast PWR plants with no F&Bcapability when a snubber, whose non-functionality would disable more than one train of AFW in a seismic event of a magnitude up to the plant's SSE, is inoperable.

SEvery time the provisions of LCO 3.0.8 are used, licensees will berequired to confirm that at least one train (or subsystem) of systems supported by the inoperable snubbers would remain capable of performing the system's required safety or support functions for postulated-design loads other than seismic loads. LCO 3.0.8 does not apply to non-seismic snubbers. In addition, a record of the design function of the inoperable snubber (i.e., seismic vs. non-seismic), the implementation of any applicable Tier 2 restrictions, and the associated plant configuration shall all be available on a recoverable basis for staff inspection.

!Should licensees implement the provisions of LCO 3.0.8 for snubbers, whichinclude delay times to enter the actions for the supported equipment when one or more snubbers are out of service for maintenance or testing, it must be done in accordance with an overall CRMP to ensure that potentially risk-significant configurations resulting from maintenance and other operational activities are identified and avoided, as discussed in the proposed TS Bases. This objective is met by licensee programs to comply with the requirements of paragraph (a)(4) of the Maintenance Rule, 10 CFR 50.65, to assess and manage risk resulting from maintenance activities or when this process is invoked by LCO 3.0.8 or other TSs. These programs can support licensee decisionmaking regarding the appropriate actions to manage risk whenever a risk-informed TS is entered.

Because the 10 CFR 50.65(a)(4) guidance, the revised (May 2000) Section 11 of NUMARC 93-01, does not currently address seismic risk, licensees adopting this change must ensure that the proposed LCO 3.0.8 is considered in conjunction with other plant maintenance activities and integrated into the existing 10 CFR 50.65(a)(4) process. In the absence of a detailed seismic PRA, a bounding risk assessment, such as that utilized in this Safety Evaluation, shall be followed. Based on the above summary and conclusions, the NRC staff concludes that the proposedLCO 3.0.8, which will be in Section 3.0 of the TSs on LCO applicability, properly defines the rules and practices for the affected support LCOs for when one or more snubbers are unable to perform their associated support function(s). Therefore, the NRC staff further concludes that the proposed LCO 3.0.8 meets 10 CFR 50.36. In its application, the licensee stated that it reviewed the NRC staff's model SE for TSTF-372,Revision 4, and has concluded that the justifications presented in the NEI TSTF-373, Revision 4, proposal and the NRC staff's model SE are applicable to Callaway, and justify this amendment. Based on its own review, the NRC staff agrees. Based on this review and its conclusion above that the amendment meets 10 CFR 50.36, the NRC staff concludes that the proposed addition of LCO 3.0.8 to the TSs is acceptable.With the addition of LCO 3.0.8 to Section 3.0 of the TSs, there will be another LCO in thatsection, besides LCO 3.0.2 and LCO 3.0.7, that explains, in this case for snubbers, when LCOsdo not have to be declared not met. Because of this, LCO 3.0.8 has to be listed in LCO 3.0.1 of TS Section 3.0. This is an administrative change that does not change any requirements in the TSs and is needed to identify the exceptions to LCO 3.0.1. Based on these considerations, the NRC staff concludes that the addition of LCO 3.0.8 to LCO 3.0.1 meets 10 CFR 50.36, and is, therefore, acceptable.The licensee identified changes to the TS bases for its proposed amendment. The NRC staffhas reviewed these changes and has no disagreement with them. Changes to the TS Bases are controlled through TS 5.5.14, "Technical Specification (TS) Bases Control Program."

4.0STATE CONSULTATION

In accordance with the Commission's regulations, the Missouri State official was notified of theproposed issuance of the amendment. The State official had the following comment on the no significant hazards consideration (NSHC) published by the NRC in the Federal Register (71 FR40755, published July 18, 2006): "While the chance of a predictable seismic event is low, there is a growing public concern over the inevitability of such an event in the Missouri area as evidenced by a national FEMA [Federal Emergency Management Agency] exercise this coming Spring likely focused on a New Madrid Earthquake event. There is a mixed scientific view over whether such a major earthquake is likely and if so, within what timeframe. Someday in the future, it may appear not to have been wise to rely on perceptions of low probability as a hazard management strategy."In response to this comment, the NRC staff stated that the New Madrid 1811-1812 earthquakeevents were taken into account in the design of Callaway and addressed in Section 2.5, "Geology and Seismology," of NUREG-0830, "Safety Evaluation Report [SER] related to the operation of Callaway plant, Unit No.1," dated October 1981, that documented the licensing of the plant. The safe shutdown earthquake (SSE) and the operating basis earthquake (OBE) approved by the NRC for the design of the plant, take into account the New Madrid earthquake events. The SSE is that earthquake, based upon an evaluation of the maximum earthquake potential, that produces the maximum vibratory ground motion for which safety-related structures, systems, and components are designed to remain functional. The OBE is that earthquake that could reasonably be expected to affect the plant site during the operating life of the plant. Both the SSE and OBE are based on the regional and local geology, seismology,and specific characteristics of the local subsurface material. In NUREG-0830 Section 5.2, the NRC staff concluded that the SSE is acceptable and the OBE provides a conservative representation of the maximum earthquake motion likely to be experienced at the site during the operating life of the plant. The vibratory motion of the SSE and OBE at the plant are more conservative than the calculated motion at the Callaway site from the New Madrid earthquake events (i.e., 0.20g (SSE) and 0.12g (OBE) versus 0.07g for the New Madrid events).Since the licensing of Callaway, there has been new information on the New Madrid events andon other earthquakes in the region not accounted for in the licensing of Callaway. This information is addressed in NUREG-1844, "Safety Evaluation Report for an Early Site Permit (ESP) at the Exelon Generation Company, LLC (EGC) ESP Site (NUREG-1844)," dated May 2006. The NRC has been assessing this new information with respect to the nuclear power plants located in the regions of the new information. A Generic Safety Issue (No. 199) has been established by the NRC to assess the impact of the updated seismic hazard in the Cental and Eastern United States. Depending on the results of this review, the NRC will take the necessary actions to ensure the safe operation of the Callaway nuclear power plant. Until such time that the NRC staff completes its assessment of the updated seismic hazards (including the New Madrid seismic zone), the NRC staff concludes that its evaluation of the appropriate SSE and OBE for the Callaway site, as described in NUREG-0830, remains valid.

5.0ENVIRONMENTAL CONSIDERATION

The amendment changes a requirement with respect to the installation or use of a facilitycomponent located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. TheCommission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (71 FR 40755, published July 18, 2006). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.

6.0CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) thereis reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

7.0REFERENCES

1.TSTF-372, Revision 4, "Addition of LCO 3.0.8, Inoperability of Snubbers,"April 23, 2004.2.U.S. NRC, "An Approach for Using Probabilistic Risk Assessment inRisk-Informed Decisions on Plant-Specific Changes to the Licensing Basis,"

Regulatory Guide 1.174, August 1998.3.U.S. NRC, "An Approach for Plant-Specific, Risk-Informed Decisionmaking:Technical Specifications," Regulatory Guide 1.177, August 1998.4.Budnitz, R. J., et al., "An Approach to the Quantification of Seismic Margins inNuclear Power Plants," NUREG/CR-4334, Lawrence Livermore National Laboratory, July 1985.5.Advanced Light Water Reactor Utility Requirements Document, Volume 2,ALWR Evolutionary Plant, PRA Key Assumptions and Groundrules, Electric Power Research Institute, August 1990.6.Bier V. M., et al., "Development and Application of a Comprehensive Frameworkfor Assessing Alternative Approaches to Snubber Reduction," International Topical Conference on Probabilistic Safety Assessment and Risk Management PSA '87, Swiss Federal Institute of Technology, Zurich, August 30-September 4, 1987.7.NUREG-1488, "Revised Livermore Seismic Hazard Estimates for Sixty-NineNuclear Power Plant Sites East of the Rocky Mountains," April 1994.8.NEI, Revised Section 11 of Revision 2 of NUMARC 93-01, May 2000.

9.U.S. NRC, "Assessing and Managing Risk Before Maintenance Activities atNuclear Power Plants," Regulatory Guide 1.182, May 2000.Principal Contributor: T. WertzJ. DonohewDate: January 31, 2007