MONTHYEARML24337A2372024-12-0202 December 2024 Operator Licensing Examination Approval Perry Nuclear Power Plant, December 2024 ML24117A1222024-04-26026 April 2024 Confirmation of Initial License Examination L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000440/20223012023-01-24024 January 2023 05000440/2022301 ML23038A1092023-01-12012 January 2023 Form 2.1-1 Examination Prep Checklist ML23038A1142023-01-12012 January 2023 NRC Exam Security Agreement ML23038A1452023-01-12012 January 2023 3.4-1 Events and Evolutions Checklist L-22-282, NRC 2022 Post Exam Submittal Cover Letter2023-01-0404 January 2023 NRC 2022 Post Exam Submittal Cover Letter ML22333A7902022-12-0606 December 2022 Operator Licensing Examination Approval - Perry Nuclear Power Plant December 2022 ML23038A1572022-12-0101 December 2022 2.3-2 Operating Test Quality Checklist ML23038A1582022-12-0101 December 2022 2.3-4 Written Examination Quality Checklist ML23038A1432022-12-0101 December 2022 2.3-1 Examination Outline Quality Checklist L-22-184, Proposed Exam Cover Letter 2022 Signed2022-09-14014 September 2022 Proposed Exam Cover Letter 2022 Signed ML23038A1482022-07-29029 July 2022 Day Letter Signed ML22130A7972022-05-11011 May 2022 Confirmation of Initial License Examination L-22-082, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-23023 March 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000440/20213012021-04-0808 April 2021 NRC Initial License Examination Report 05000440/2021301 ML22165A3182021-03-22022 March 2021 2021 Per Ile ES-301-7 Operating Test Comments-Final ML22165A3212021-03-22022 March 2021 2021 Perry Ile ES-401-9-Final Combined ML22165A3202021-03-22022 March 2021 2021 Perry Ile ES-401-4 ML22165A3082021-03-22022 March 2021 2021 Perry Ile Es 201-3 Security Agreement-Final ML22165A3072021-03-22022 March 2021 2021 Perry Ile ES-201-1 Exam Prep Checklist ML22165A3112021-03-22022 March 2021 2021 Perry Ile Es 403-1-Final L-21-087, 2021 Perry Ile Post-Exam Submittal Letter2021-03-0202 March 2021 2021 Perry Ile Post-Exam Submittal Letter ML22165A3252021-02-19019 February 2021 2021 Perry Ile Administered Walkthrough JPMs-Final ML22165A3262021-02-19019 February 2021 2021 Perry Ile Administered Scenarios-Final ML22165A3272021-02-19019 February 2021 2021 Perry Ile Administered Written Exam with Reference Handouts-Final ML21032A0822021-02-0101 February 2021 Operator Licensing Examination Approval ML22165A3372021-01-29029 January 2021 2021 Perry Ile ES-401-6 - Signed ML22165A3332021-01-29029 January 2021 2021 Perry Ile ES-301-3 - Signed ML22166A0322021-01-29029 January 2021 2021 Perry Ile Proposed Scenarios-Final ML22165A3342021-01-29029 January 2021 2021 Perry Ile ES-301-4 - Completed ML22165A3352021-01-29029 January 2021 2021 Perry Ile ES-301-6 Competencies Checklist Pg-1 Rev 0 ML22166A0352021-01-29029 January 2021 2021 Perry Ile Proposed Written Exam ML22166A0252021-01-29029 January 2021 2021 Perry Ile Proposed Walkthrough JPMs-Final L-20-292, 75-Day Exam Submittal Cover Letter2020-11-0404 November 2020 75-Day Exam Submittal Cover Letter ML22166A4322020-10-15015 October 2020 2021 Perry Ile ES-301-1s-Final ML22166A4402020-10-15015 October 2020 2021 Perry Ile ES-D-1s Rev 11 Scenarios-Final ML22166A4342020-10-15015 October 2020 2021 Perry Ile ES-401-1 and 401-3 Outlines-Final ML22166A4332020-10-15015 October 2020 2021 Perry Ile ES-301-2s-Final ML22166A0482020-10-15015 October 2020 2021 Perry Ile ES-201-2 - Signed ML22166A4312020-10-15015 October 2020 2021 Perry Ile ES-301-5 Transient and Event Checklist Rev 0 ML20205L3692020-07-23023 July 2020 Confirmation of Initial License Examination ML19276D6682019-10-0303 October 2019 GFE Results, September 2019 IR 05000440/20193022019-09-27027 September 2019 NRC Initial License Reexamination Report 05000440/2019302 (Rdb) ML22144A3802019-09-12012 September 2019 2019 Perry Retake Written Re-exam Reference Handouts ML22144A3792019-09-12012 September 2019 2019 Perry Retake Administered Written Re-Exam ML22144A3822019-09-0505 September 2019 2019 Perry Retake ES-401-6 Written Exam Quality Checklist ML22144A3832019-09-0505 September 2019 2019 Perry Retake Proposed Written Re-Exam ML22144A3602019-09-0303 September 2019 2019 Perry Retake 401-9 Final 2024-04-26
[Table view] Category:Part 55 Examination Related Material
[Table view] |
Text
OT-3701-ADM NRC10-A4 JOB PERFORMANCE MEASURE SETUP SHEET Rev 0 System: Time Critical: Applicability:
Safety Function: Setting: Validated:
References:
Tasks: Task Standard: K/A Data: Administrative No RO/SRO Radiation Control Classroom 15 minutes OBP-OP-4009 rev 0 (p.12), GE C-RWT200901_PY, Attached: Survey Maps A57042, A57403B;RWPs 100002,100005.
299-502-03-01 Maintain Radiation Exposure as Low as Reasonably Achievable (ALARA)299-848-01-01 Comply with the Administrative Requirements for the Perry Plant Radiation Dose Control Program Calculate maximum stay-time using conect RWP and Survey Map for RHR A walk-down.
2.3.7 Ability
to comply with radiation work pem1it requirements during n01111al or abnonnal conditions.
3.5/3.6 Required Materials:
Calculator (1.Setup Instructions:
N/A 2.Location/Method: Classroom/Perfonn 3.Initial Condition:
The plant is at 100%power.HP reports water leakage in the"A" RHR pump room.4.Initiating Cue: You are to walk-down and inspect the"A" RHR pump and piping.In preparation for this you are to:*Detennine which, of the two provided survey maps, is the conect survey map to use*Detennine which, of the two provided RWPs, is the conect RWP to use*Assuming you remain on the East Side of the pump casing, calculate the maximum stay time before the MG-DRD alanns on Dose Limit.*State your required actions if the MG-DRD alanns on Dose Limit.Start Time:_(, Candidate:
End Time:
(OT-3701-ADM NRC10-A4 JPM BODY SHEET Rev 0 Standard: Perf o 1111 er obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc...before perfonning task.Standard: Perfonner follows management expectations with regards to safety and communication standards.
Step 1 Determine the appropriate survey map.Critical Step: Instructor Cue: Notes: Operator detem1ines that survey map#57403B is the COlTect map.None None (SAT UNSAT Comment(s):
_Step 2 Dete1111ine the appropriate R WP.Critical Step: Instructor Cue: Notes: Operator detennines that R WP 100002 is the COlTeet R WP.None RWP 100005 is not for High Rad areas.The survey map shows the RHR room is posted High Rad.SAT UNSAT Comment(s):
_
(OT-3701-ADM NRC10-A4 Step 3 Calculate the maximum stay time before the MG-DRD alarms on Dose Limit.Rev 0 Critical Step: Instructor Cue: Notes: Operator divides 25 (the dose limit alarm)by 32 (the east side pump dose)and multiples by 60 (minutes/hour) to obtain 46.875 minutes.None 46 to 47 minutes is acceptable.
SAT UNSAT Comment(s):
_Step 4 Required actions if the MG-DRD alanns on Dose Limit (Critical Step: Instructor Cue: Notes: Operator determines that immediate exit and HP notification is required.None None SAT UNSAT Comment(s):
_Terminating Cue: Operator has selected an RWP, Survey Map, performed a dose calculation and stated actions on an alarm.Evaluation Results: End Time: SAT UNSAT
- .1 RADIOLOGICAL SURVEY FORf{SURVEY Nl},.1l8ER-----r, ,.AI-'#-1 RV,/P'
--;1001126 , 7 02 10-0621_oj____*.__1-.*.*.__I'?*!P..::1B11-o.1.B.eY
....._..._._.:...___.._.__._I Bun Dl.G__J
_I
.___D:r_
__rPfj"-'---'----------_.--'--'--_.-'-f PURPOSE Quarterty Taskca'.._-......---.__.H*______......_..;..=."'--
___--***----:---r----
(II I A 574'-02-4-P/,GE*.__...*..OF....__...::...._.