Letter Sequence Approval |
---|
TAC:MF3788, Allow 7 Day Completion Time for a TURBINE-DRIVEN AFW Pump Inoperable (Approved, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARLIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24255A0962024-09-12012 September 2024 License Amendment Request to Revise the License Termination Plan - Request Supplemental Information (License No. DPR-40, Docket No. 50-285) ML24243A1042024-09-12012 September 2024 Proposed Revision to the OPPD FCS DQAP - Request for Additional Information (License No. DPR-40, Docket Nos. 50-285, 72-054, and 71-0256) IR 05000285/20240022024-08-21021 August 2024 NRC Inspection Report 05000285/2024002 ML24235A0822024-08-10010 August 2024 Response to Fort Calhoun Station, Unit No. 1 - Phase 1 Final Status Survey Report to Support Approved License Termination Plan - Request for Additional Information - Request for Additional Information (EPID L-2024-DFR-0002) July 8, 2024 ML24180A2082024-07-0808 July 2024 Phase 1 Final Status Survey Reports Request for Additional Information Letter ML24183A3222024-07-0808 July 2024 Proposed Revision to the Omaha Public Power District Fort Calhoun Station Decommissioning Quality Assurance Plan - Acceptance Review LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) IR 05000285/20240012024-06-0505 June 2024 NRC Inspection Report 05000285/2024001 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan ML24079A1702024-03-10010 March 2024 ISFSI, Unit 1 - 10 CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, 10 CFR 71.106 Quality Assurance Program Approval, Aging Management Review, Commitment Revisions and Revision of Updated Safe LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report ML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request IR 05000285/20230032023-07-10010 July 2023 NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 ML23151A0032023-06-0505 June 2023 Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, Shpo; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commission'S Analysis of Omaha Public Power District'S Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1222022-08-0303 August 2022 Letter to Mr. John Shotton, Chairman, Otoe-Missouria Tribe of Indians, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1302022-08-0303 August 2022 Letter to Justin Wood, Principal Chief, Sac and Fox Nation, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1242022-08-0303 August 2022 Letter to Mr. Reggie Wassana, Governor, Cheyenne and Arapaho Tribes, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22101A1092022-08-0303 August 2022 Letter to Mr. Durell Cooper, Chairman, Apache Tribe of Oklahoma; Re., Ft Calhoun LTP Section 106 ML22138A1212022-08-0303 August 2022 Letter to Mr. Edgar Kent, Chairman, Iowa Tribe of Oklahoma, Re., Ft Calhoun LTP Section 106 2024-09-18
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements ML20071E1042020-03-25025 March 2020 Issuance of Amendment to Change the Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan to Reflect an ISFSI-Only Configuration ML19297D6772019-12-11011 December 2019 Issuance of Amendment to Revise the Permanently Defueled Technical Specifications to Align to the Requirements for Permanent Removal of Spent Fuel from the Spent Fuel Pool ML18047A6612018-03-28028 March 2018 Issuance of Amendment No. 298, Request to Modify License Condition 3.C to Delete Requirement for Commission-Approved Cyber Security Plan (CAC No. MF9850; EPID L-2017-LLA-0236) ML18068A1652018-03-0909 March 2018 Correction to Page 1 of Attachment to Enclosure 1 for Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192) ML18010A0872018-03-0606 March 2018 Issuance of Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192) ML17338A1722018-01-19019 January 2018 Issuance of Amendment No. 296, Revise Technical Specifications (TS) to Delete Dry Spent Fuel Cask Loading Limits from TS 3.8.3(6), Figure 2-11, Table 3-4, Table 3-5, and TS 4.3.1.3 (CAC No. MF9831; EPID L-2017-LLA-0235) ML17276B2862017-12-12012 December 2017 Issuance of Amendment No. 295, Revise the Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MF8951; EPID L-2016-LLA-0036) ML17289A0602017-11-22022 November 2017 Issuance of Amendment No. 294, Revise Cyber Security Plan Implementation Schedule for Milestone 8 and Associated License Condition (CAC No. MF9559; EPID L-2017-LLA-0184) ML17278A6072017-11-17017 November 2017 Issuance of Amendment No. 293, Request to Revise Current Licensing Basis for the Auxiliary Building to Use American Concrete Institute Ultimate Strength Requirements (CAC No. MF8525; EPID L-2016-LLA-0013) ML17165A4652017-07-28028 July 2017 Fort Calhoun Station, Unit 1 - Issuance of Amendment No. 292, Revise Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning (CAC No. MF8437) ML17123A3482017-07-27027 July 2017 Issuance of Amendment No. 291, Revise the Radiological Emergency Response Plan for Permanently Defueled Condition ML17179A1782017-06-29029 June 2017 Correction to Technical Specification Definitions - Page 7 for Amendment No. 286, Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and ... LIC-17-0047, Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2017-05-15015 May 2017 Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme ML17053A0992017-04-0707 April 2017 Issuance of Amendment No. 290, Request to Delete License Condition 3.D., Fire Protection Program, No Longer Needed for Permanently Shutdown and Defueled Condition ML16182A3632016-08-19019 August 2016 Issuance of Amendment No. 289, Request to Adopt Technical Specification Task Force (TSTF)-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML16139A8042016-06-0808 June 2016 Issuance of Amendment No. 288, Request to Adopt Technical Specifications Task Force (TSTF)-426, Revision 5, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiative 6b & 6c ML16084A7552016-04-0505 April 2016 Issuance of Amendment No. 287, Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours/Month, Using CLIIP ML15307A0132016-02-23023 February 2016 Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition ML15288A0052015-12-15015 December 2015 Issuance of Amendment No. 285, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML15294A2792015-11-19019 November 2015 Issuance of Amendment No. 284, Request to Revise License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML15209A8022015-08-10010 August 2015 Issuance of Amendment No. 283, Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III ML15111A3992015-06-30030 June 2015 Issuance of Amendment No. 282, Revise Updated Safety Analysis Report for Controlling Raw Water Pump Operation and Safety Classification of Components During a Flood ML15035A2032015-03-27027 March 2015 Issuance of Amendment No. 281, Revise Technical Specification 3.1, Table 3-3 to Correct Administrative Error in Surveillance Method for Containment Wide Range Radiation Monitors ML15015A4132015-02-20020 February 2015 Issuance of Amendment No. 280, Revise Technical Specification 3.2, Table 3-5 to Add New Surveillance Requirement ML14356A0122014-12-29029 December 2014 Issuance of Amendment No. 279, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months ML14328A8142014-12-22022 December 2014 Issuance of Amendment No. 278, Revise Technical Specification 2.5, Auxiliary Feedwater (AFW) System to Allow 7-Day Completion Time for Turbine-Driven AFW Pump Based on TSTF-340, Revision 3 ML14279A2752014-11-0606 November 2014 Issuance of Amendment No. 277, Revise Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3, for One-Time Extension of Frequency to Maximum of 28 Months ML14209A0272014-08-0707 August 2014 Issuance of Amendment No. 276, Request to Revise Updated Safety Analysis Report for Westinghouse Plant-Specific Leak-Before-Break Analysis ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) ML14003A0032014-01-28028 January 2014 Issuance of Amendment No. 274, Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response Plan ML13296A5842013-10-25025 October 2013 Issuance of Amendment No. 273, Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks (Exigent Circumstances) ML13203A0702013-07-26026 July 2013 Issuance of Amendment No. 272 - Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact (Exigent Circumstances) ML13070A0422013-03-29029 March 2013 Issuance of Amendment No. 271, Relocate Technical Specification LCO 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis Report ML13043A6612013-02-28028 February 2013 Issuance of Amendment No. 270 to Revise Technical Specification 2.15 to Establish Limiting Condition for Operation Requirements for Reactor Protective System Actuation Circuits ML1126204022011-09-30030 September 2011 Issuance of Amendment No. 268, Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications ML1118615712011-08-31031 August 2011 Issuance of Amendment No. 267, Revise Technical Specification (TS) 2.15 and TS 3.1 Related to Operability of Secondary Control Element Assembly Position Indication System Channels; Correction to TS 2.10.2(7)c ML1118010942011-07-27027 July 2011 Issuance of Amendment No. 266, Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1015202962010-06-0202 June 2010 License Amendment, Issuance of Amendment No. 265, Revise Technical Specification 2.15, Table 2-5, Note C for Safety Valve Acoustic Position Indication (Emergency Circumstances) ML1009100772010-05-14014 May 2010 License Amendment, 264, Revision of Tech Spec Sections 2.0.1 and 2.7 for Inoperable System, Subsystem, or Component Due to Inoperable Power Source and Deletion of Diesel Generator Surveillance Requirement 3.7(1)e ML0925405912009-10-0909 October 2009 License Amendment, Issuance of Amendment No. 263 Modify Technical Specifications to Add Operability and Testing Requirements for Steam Generator Blowdown Isolation on a Reactor Trip ML0919005692009-07-24024 July 2009 Unit No.1 - Issuance of Amendment No. 261, Modify Transformer Allowed Outage Time in Technical Specification 2.7(2) and Delete Associated 2.7(2) Special Reporting Requirements in TS 5.9.3j ML0916205692009-07-24024 July 2009 Issuance of Amendment 262, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0912801022009-07-22022 July 2009 Issuance of Amendment No. 260, Modification of Surveillance Requirements in TS 3.6(3), Containment Recirculating Air Cooling and Filtering System & Removal of License Conditions ML0832606972009-05-12012 May 2009 Issuance of Amendment No. 259, Revise Technical Specifications to Correct Typographical Errors and Make Administrative Clarifications ML0907108912009-03-27027 March 2009 License Amendment, Issuance of Amendment No. 258, Revise Limiting Condition for Operation 2.7(2)j in TS 2.7, Electrical Systems, to Clarify Allowed Outage Time for Emergency Diesel Generators ML0730903612007-12-17017 December 2007 Issuance of Amendment No. 251, Modify Technical Specification Requirements to Support Addition of Safety-Related Swing Inverters to 120 Volt AC Buses ML0720400972007-07-26026 July 2007 Conforming License Amendment to Incorporate the Mitigation Strategies of Commission Order EA-02-026 (Tac No. MD4534) ML0720402832007-07-26026 July 2007 Revised Pages of Facility Operating License DPR-40 to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 ML0706102692007-06-0606 June 2007 Issuance of Amendment No. 250 Adoption of TSTF-447 to Delete Requirements for Hydrogen Purge System - CLIIP 2024-01-31
[Table view] Category:Safety Evaluation
MONTHYEARML24019A1682024-01-31031 January 2024 Safety Evaluation Report for Approval of License Termination Plan ML21271A5992021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 8, 12, Omaha Public Power District, FCS-SAF-103, FCS Deconstruction Health and Safety Plan CAC2 ML20056E4872020-02-26026 February 2020 Staff Review of Fort Calhoun Independent Spent Fuel Storage Installation Physical Security Plan, Security Training and Qualification Plan, and Safeguard Contingency Plan, Revision 0 and the Verification of Additional Security Measures (ASM) ML19297D6742019-12-0909 December 2019 FCS ISFSI Only Tech Specs SER ML18017B0052018-03-30030 March 2018 Review of the Irradiated Fuel Management Plan (CAC No. MF9553; EPID L-2017-LLL-0009) ML18047A6612018-03-28028 March 2018 Issuance of Amendment No. 298, Request to Modify License Condition 3.C to Delete Requirement for Commission-Approved Cyber Security Plan (CAC No. MF9850; EPID L-2017-LLA-0236) ML18010A0872018-03-0606 March 2018 Issuance of Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192) ML17338A1722018-01-19019 January 2018 Issuance of Amendment No. 296, Revise Technical Specifications (TS) to Delete Dry Spent Fuel Cask Loading Limits from TS 3.8.3(6), Figure 2-11, Table 3-4, Table 3-5, and TS 4.3.1.3 (CAC No. MF9831; EPID L-2017-LLA-0235) ML17276B2862017-12-12012 December 2017 Issuance of Amendment No. 295, Revise the Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MF8951; EPID L-2016-LLA-0036) ML17263B1982017-12-11011 December 2017 Letter and Safety Evaluation, Request for Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) ML17289A0602017-11-22022 November 2017 Issuance of Amendment No. 294, Revise Cyber Security Plan Implementation Schedule for Milestone 8 and Associated License Condition (CAC No. MF9559; EPID L-2017-LLA-0184) ML17275A2642017-11-21021 November 2017 Safety Evaluation Input on Fort Calhoun Station Request for Approval of Permanently Defueled Emergency Plan and Emergency Action Level Scheme, Docket No. 50-285 ML17278A6072017-11-17017 November 2017 Issuance of Amendment No. 293, Request to Revise Current Licensing Basis for the Auxiliary Building to Use American Concrete Institute Ultimate Strength Requirements (CAC No. MF8525; EPID L-2016-LLA-0013) ML17165A4652017-07-28028 July 2017 Fort Calhoun Station, Unit 1 - Issuance of Amendment No. 292, Revise Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning (CAC No. MF8437) ML17123A3482017-07-27027 July 2017 Issuance of Amendment No. 291, Revise the Radiological Emergency Response Plan for Permanently Defueled Condition ML17144A2462017-06-21021 June 2017 Approval of Certified Fuel Handler Training and Retraining Program to Facilitate Activities Associated with Decommissioning and Irradiated Fuel Handling Management ML17053A0992017-04-0707 April 2017 Issuance of Amendment No. 290, Request to Delete License Condition 3.D., Fire Protection Program, No Longer Needed for Permanently Shutdown and Defueled Condition ML16141A7392016-05-27027 May 2016 Safety Evaluation, Review of Aging Management Program of Reactor Vessel Internals Based on MRP-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines ML16104A0742016-04-15015 April 2016 Relief Request, Request to Use a Portion of a Later Edition of the ASME B&PV Code, Section XI, Fourth 10-Year Inservice Inspection Interval ML16084A7552016-04-0505 April 2016 Issuance of Amendment No. 287, Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours/Month, Using CLIIP ML15307A0132016-02-23023 February 2016 Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition ML16041A3082016-02-19019 February 2016 Relief Requests P-1 - LPSI and CS Pumps; P-2 - Adjusting Hydraulic Parameters Consistent W/Code Case OMN-21; G-1 - Test Frequency Consistent W/Code Case OMN-20, Fifth 10-Year Inservice Testing Interval ML15288A0052015-12-15015 December 2015 Issuance of Amendment No. 285, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML15294A2792015-11-19019 November 2015 Issuance of Amendment No. 284, Request to Revise License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML15232A0032015-08-21021 August 2015 Relief Request RR-14, Relief from ASME Code Case N-729-1 Requirements for Reactor Vessel Head Penetration Nozzle Welds, Fourth 10-Year Inservice Inspection Interval ML15209A8022015-08-10010 August 2015 Issuance of Amendment No. 283, Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III ML15111A3992015-06-30030 June 2015 Issuance of Amendment No. 282, Revise Updated Safety Analysis Report for Controlling Raw Water Pump Operation and Safety Classification of Components During a Flood ML15035A2032015-03-27027 March 2015 Issuance of Amendment No. 281, Revise Technical Specification 3.1, Table 3-3 to Correct Administrative Error in Surveillance Method for Containment Wide Range Radiation Monitors ML15015A4132015-02-20020 February 2015 Issuance of Amendment No. 280, Revise Technical Specification 3.2, Table 3-5 to Add New Surveillance Requirement ML14356A0122014-12-29029 December 2014 Issuance of Amendment No. 279, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months ML14328A8142014-12-22022 December 2014 Issuance of Amendment No. 278, Revise Technical Specification 2.5, Auxiliary Feedwater (AFW) System to Allow 7-Day Completion Time for Turbine-Driven AFW Pump Based on TSTF-340, Revision 3 ML14323A5992014-12-0202 December 2014 Relief Request RR-13, Relief from Inservice Testing Requirements to Perform Testing of 4 Valves During the April 2015 Refueling Outage ML14316A1672014-11-19019 November 2014 Relief Request RR-14, Proposed Alternative for Temporary Acceptance of a Pin Hole Leak in Raw Water System 20-Inch Elbow Located in Room 19 of Auxiliary Building ML14279A2752014-11-0606 November 2014 Issuance of Amendment No. 277, Revise Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3, for One-Time Extension of Frequency to Maximum of 28 Months ML14209A0272014-08-0707 August 2014 Issuance of Amendment No. 276, Request to Revise Updated Safety Analysis Report for Westinghouse Plant-Specific Leak-Before-Break Analysis ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) ML14003A0032014-01-28028 January 2014 Issuance of Amendment No. 274, Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response Plan ML13296A5842013-10-25025 October 2013 Issuance of Amendment No. 273, Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks (Exigent Circumstances) ML13203A0702013-07-26026 July 2013 Issuance of Amendment No. 272 - Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact (Exigent Circumstances) ML13141A6082013-06-25025 June 2013 Safety Assessment in Response to Request for Information Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications Assessment ML13070A0422013-03-29029 March 2013 Issuance of Amendment No. 271, Relocate Technical Specification LCO 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis Report ML13043A6612013-02-28028 February 2013 Issuance of Amendment No. 270 to Revise Technical Specification 2.15 to Establish Limiting Condition for Operation Requirements for Reactor Protective System Actuation Circuits ML13017A4672013-01-31031 January 2013 Approval of Request for Change to the Reactor Vessel Surveillance Capsule Removal Schedule ML12333A1192012-12-31031 December 2012 Issuance of Amendment No. 269, Incorporate New Radial Peaking Factor Definition and Clarify Limiting Condition for Operation (LCO) 2.10.2(6) ML1126204022011-09-30030 September 2011 Issuance of Amendment No. 268, Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications ML1118615712011-08-31031 August 2011 Issuance of Amendment No. 267, Revise Technical Specification (TS) 2.15 and TS 3.1 Related to Operability of Secondary Control Element Assembly Position Indication System Channels; Correction to TS 2.10.2(7)c ML1122702902011-08-18018 August 2011 Relief Request RR-12 from Code Case N-722, Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated with Alloy 600/82/182 Materials, Fourth 10-Year Inservice Inspection Interval ML1118010942011-07-27027 July 2011 Issuance of Amendment No. 266, Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1022101332010-08-20020 August 2010 Request for Use of Alternative to Depth-Sizing Qualification for Volumetric Examinations of Reactor Pressure Vessel Welds for 4th 10-year Inservice Inspection Interval ML1009100772010-05-14014 May 2010 License Amendment, 264, Revision of Tech Spec Sections 2.0.1 and 2.7 for Inoperable System, Subsystem, or Component Due to Inoperable Power Source and Deletion of Diesel Generator Surveillance Requirement 3.7(1)e 2024-01-31
[Table view] Category:Technical Specifications
MONTHYEARML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements ML17123A3482017-07-27027 July 2017 Issuance of Amendment No. 291, Revise the Radiological Emergency Response Plan for Permanently Defueled Condition ML16084A7552016-04-0505 April 2016 Issuance of Amendment No. 287, Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours/Month, Using CLIIP ML15307A0132016-02-23023 February 2016 Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition ML15288A0052015-12-15015 December 2015 Issuance of Amendment No. 285, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors LIC-15-0076, License Amendment Request 15-06; Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2015-09-11011 September 2015 License Amendment Request 15-06; Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. LIC-15-0085, License Amendment Request 15-05; Application to Revise Technical Specification to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiative 6B & 6C, Using the Consolidated Line Item.2015-09-11011 September 2015 License Amendment Request 15-05; Application to Revise Technical Specification to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiative 6B & 6C, Using the Consolidated Line Item. LIC-15-0053, License Amendment Request (LAR) 15-04; Application to Revise Technical Specification for Administrative Changes2015-08-20020 August 2015 License Amendment Request (LAR) 15-04; Application to Revise Technical Specification for Administrative Changes ML15209A8022015-08-10010 August 2015 Issuance of Amendment No. 283, Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III ML15111A3992015-06-30030 June 2015 Issuance of Amendment No. 282, Revise Updated Safety Analysis Report for Controlling Raw Water Pump Operation and Safety Classification of Components During a Flood ML15035A2032015-03-27027 March 2015 Issuance of Amendment No. 281, Revise Technical Specification 3.1, Table 3-3 to Correct Administrative Error in Surveillance Method for Containment Wide Range Radiation Monitors ML15015A4132015-02-20020 February 2015 Issuance of Amendment No. 280, Revise Technical Specification 3.2, Table 3-5 to Add New Surveillance Requirement ML14356A0122014-12-29029 December 2014 Issuance of Amendment No. 279, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months ML14328A8142014-12-22022 December 2014 Issuance of Amendment No. 278, Revise Technical Specification 2.5, Auxiliary Feedwater (AFW) System to Allow 7-Day Completion Time for Turbine-Driven AFW Pump Based on TSTF-340, Revision 3 LIC-14-0128, License Amendment Request (LAR) 14-10; One- Time Extension of Technical Specification Surveillance Requirements2014-11-0707 November 2014 License Amendment Request (LAR) 14-10; One- Time Extension of Technical Specification Surveillance Requirements ML14279A2752014-11-0606 November 2014 Issuance of Amendment No. 277, Revise Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3, for One-Time Extension of Frequency to Maximum of 28 Months ML14209A0272014-08-0707 August 2014 Issuance of Amendment No. 276, Request to Revise Updated Safety Analysis Report for Westinghouse Plant-Specific Leak-Before-Break Analysis ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) ML14115A2972014-04-10010 April 2014 Enclosure 1: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants ML14041A4082014-02-10010 February 2014 License Amendment Request (LAR) 14-01, One-Time Extension of Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3 ML14108A0442013-12-31031 December 2013 Omaha Public Power District Fort Calhoun Station Unit Radiological Environmental Operating Report for Technical Specification Section 5.94.b January 1, 2013 to December 31, 2013 ML14108A0422013-12-31031 December 2013 Omaha Public Power District Fort Calhoun Station Unit No. 1 - Annual Report for Technical Specification Section 5.94.a January 1, 2013 to December 31, 2013 ML12128A1702012-04-12012 April 2012 Technical Specification (TS) Basis Change Index, Page 2 of 2 and TS 2.10 - Page 18 LIC-12-0006, License Amendment Request (LAR) 12-01, Proposed Change to Establish the Reactor Protective System (RPS) Actuation Circuits Limiting Condition for Operation (LCO)2012-02-10010 February 2012 License Amendment Request (LAR) 12-01, Proposed Change to Establish the Reactor Protective System (RPS) Actuation Circuits Limiting Condition for Operation (LCO) LIC-12-0052, Annual Report for Technical Specification Section 5.9.4a2011-12-31031 December 2011 Annual Report for Technical Specification Section 5.9.4a LIC-10-0034, License Amendment Request (LAR) Revision to Technical Specification (TS) 2.15, Table 2-5, Item 1 and TS 3.1, Table 3-3, Items 1, 2 and 4 Control Element Assembly Position Indication and Correction of TS 2.10.2(7)c.2010-07-12012 July 2010 License Amendment Request (LAR) Revision to Technical Specification (TS) 2.15, Table 2-5, Item 1 and TS 3.1, Table 3-3, Items 1, 2 and 4 Control Element Assembly Position Indication and Correction of TS 2.10.2(7)c. LIC-10-0043, Supplement to Emergency License Amendment Request Revision to Technical Specification 2.15, Table 2-5 Note (C) for Safety Valve Acoustic Position Indication2010-06-0101 June 2010 Supplement to Emergency License Amendment Request Revision to Technical Specification 2.15, Table 2-5 Note (C) for Safety Valve Acoustic Position Indication ML0935611192010-01-22022 January 2010 Correction to Amendment No. 263 Request to Add Steam Generator Blowdown Isolation Requirements to Technical Specifications ML0925405912009-10-0909 October 2009 License Amendment, Issuance of Amendment No. 263 Modify Technical Specifications to Add Operability and Testing Requirements for Steam Generator Blowdown Isolation on a Reactor Trip ML0912502752009-05-0505 May 2009 Replacement Page TS 2.1 - Page 8, License Amendment Request for Administrative Revisions ML0907108912009-03-27027 March 2009 License Amendment, Issuance of Amendment No. 258, Revise Limiting Condition for Operation 2.7(2)j in TS 2.7, Electrical Systems, to Clarify Allowed Outage Time for Emergency Diesel Generators ML0911703682009-02-18018 February 2009 Updated Tech Spec Pages, from Licensee, License Amendment Request Lic 08-0078, Administrative Revisions to the Technical Specifications to Correct Typographical Errors and Provide Clarification LIC-09-0008, License Amendment Request for Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.2009-01-30030 January 2009 License Amendment Request for Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. LIC-08-0074, License Amendment Request (LAR) 08-03, Clarify Technical Specification 2.7(2) Regarding Preferred Offsite Power Source, Transformer Allowed Outage Time (AOT)2008-07-31031 July 2008 License Amendment Request (LAR) 08-03, Clarify Technical Specification 2.7(2) Regarding Preferred Offsite Power Source, Transformer Allowed Outage Time (AOT) LIC-08-0049, License Amendment Request (LAR) Clarification of Technical Specification (TS) 2.7(2)j, Regarding Emergency Diesel Generators Allowed Outage Time2008-04-22022 April 2008 License Amendment Request (LAR) Clarification of Technical Specification (TS) 2.7(2)j, Regarding Emergency Diesel Generators Allowed Outage Time LIC-08-0008, License Amendment Request (LAR) Revision to Technical Specification (TS) 2.5(1)A, Auxiliary Feedwater (AFW) System.2008-02-0505 February 2008 License Amendment Request (LAR) Revision to Technical Specification (TS) 2.5(1)A, Auxiliary Feedwater (AFW) System. LIC-07-0084, License Amendment Request, Change to Diesel Generator Surveillance Testing.2007-10-0505 October 2007 License Amendment Request, Change to Diesel Generator Surveillance Testing. LIC-07-0082, License Amendment Request (LAR) Permanent Use of Sodium Tetraborate as the Containment Building Sump Buffering Agent.2007-09-11011 September 2007 License Amendment Request (LAR) Permanent Use of Sodium Tetraborate as the Containment Building Sump Buffering Agent. LIC-07-0046, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-05-16016 May 2007 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0707100982007-04-0303 April 2007 Technical Specifications, Editorial Changes to Apply Certain Limiting Conditions for Operation Requirements ML0705905082007-02-28028 February 2007 License and Technical Specification Pages - Amendment No. 248 to Facility Operating License Relocation of T.S. 2.22, Toxic Gas Monitors, and T.S. Table 3-3, Item 29 to Updated Safety Analysis Report LIC-06-0146, License Amendment Request, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Purge System Using the Consolidated Line Item Improvement Process.2006-12-20020 December 2006 License Amendment Request, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Purge System Using the Consolidated Line Item Improvement Process. LIC-06-0147, License Amendment Request for Administrative Revisions to Fort Calhoun Station, Unit No. 1 Technical Specifications2006-12-20020 December 2006 License Amendment Request for Administrative Revisions to Fort Calhoun Station, Unit No. 1 Technical Specifications ML0631105582006-11-0707 November 2006 Technical Specifications, Revising TS Steam Generator Tube Suveillance Program ML0631202592006-10-27027 October 2006 Tech Spec Pages for Amendment 244 Modifications to Technical Specification 2.4, Containment Cooling to Reduce Operable Containment Spray Pumps ML0628604282006-10-10010 October 2006 Response to Request for Additional Information (RAI) Related to the Replacement of Trisodium Phosphate ML0624304022006-08-30030 August 2006 Revised License Amendment Request, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process and Deletion of Sleeving as a Steam Generator.. ML0624201602006-08-30030 August 2006 Tech Spec Pages for Amendment 241 Regarding Use of M5 Fuel Cladding ML0624301302006-06-27027 June 2006 Tech Spec Pages for Amendment 240 Deletion of Design Features in Technical Specifications 4.3.1.2b and 4.3.1.2c LIC-06-0063, Exigent LAR, Deletion of Design Features Technical Specifications Redundant to 10 CFR 50.68, Criticality Accident Requirements.2006-06-0202 June 2006 Exigent LAR, Deletion of Design Features Technical Specifications Redundant to 10 CFR 50.68, Criticality Accident Requirements. 2024-01-31
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 22, 2014 Mr. Louis P. Cortopassi Site Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station 9610 Power Lane, Mail Stop FC-2-4 Blair, NE 68008
SUBJECT:
FORT CALHOUN STATION, UNIT NO. 1 -ISSUANCE OF AMENDMENT RE: CHANGE TO TECHNICAL SPECIFICATION 2.5 (TAC NO. MF3788)
Dear Mr. Cortopassi:
The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 278 to Renewed Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated March 31, 2014. The amendment revised TS 2.5, "Steam and Feedwater Systems," to allow a 7-day completion time for the turbine-driven auxiliary feedwater pump if the inoperability occurs following a refueling outage and if Mode 2 has not been entered based on Technical Specification Task Force (TSTF) Change Traveler TSTF-340, Revision 3. A copy of the related Safety Evaluation is also enclosed.
The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Docket No. 50-285
Enclosures:
- 1. Amendment No. 278 to DPR-40 2. Safety Evaluation cc w/encls: Distribution via Listserv Sincerely, Carl F. Lyon, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 OMAHA PUBLIC POWER DISTRICT DOCKET NO. 50-285 FORT CALHOUN STATION, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 278 Renewed License No. DPR-40 1. The Nuclear Regulatory Commission (the Commission) has found that: A. The application for amendment by the Omaha Public Power District (the licensee), dated March 31, 2014, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 1 2. Accordingly, Renewed Facility Operating License No. DPR-40 is amended by changes as indicated in the attachment to this license amendment, and paragraph
- 3. B. of Renewed Facility Operating License No. DPR-40 is hereby amended to read as follows: B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 278, are hereby incorporated in the license. Omaha Public Power District shall operate the facility in accordance with the Technical Specifications.
- 3. The license amendment is effective as of its date of issuance and shall be implemented within 120 days from the date of issuance.
Attachment:
Changes to the Renewed Facility Operating License No. DPR-40 and Technical Specifications FOR THE NUCLEAR REGULATORY COMMISSION Eric R. Oesterle, Acting Chief Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Date of Issuance:
December 22, 2014 ATTACHMENT TO LICENSE AMENDMENT NO. 278 RENEWED FACILITY OPERATING LICENSE NO. DPR-40 DOCKET NO. 50-285 Replace the following pages of the Renewed Facility Operating License No. DPR-40 and the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change. License Page REMOVE INSERT -3-Technical Specifications REMOVE 2.5-Page 1 2.5-Page 2 INSERT 2.5-Page 1 2.5-Page 2 2.5-Page 3 (4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or when associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by operation of the facility.
- 3. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is, subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: A Maximum Power Level Omaha Public Power District is authorized to operate the Fort Calhoun Station, Unit 1, at steady state reactor core power levels not in excess of 1500 megawatts thermal (rate power). B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 278 are hereby incorporated in the license. Omaha Public Power District shall operate the facility in accordance with the Technical Specifications.
C. Security and Safeguards Contingency Plans The Omaha Public Power District shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Fort Calhoun Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan," submitted by letter dated May 19, 2006. OPPD shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The OPPD CSP was approved by License Amendment No. 266. Renewed Operating License No. DPR-40 Amendment No. 278 TECHNICAL SPECIFICATIONS
2.0 LIMITING
CONDITIONS FOR OPERATION
2.5 Steam
and Feedwater Systems Applicability When steam generators are relied upon for reactor coolant system heat removal. Objective To define certain conditions for the steam and feedwater system necessary to assure adequate decay heat removal. Specifications (1) Two AFW trains shall be OPERABLE when Tcold is above 300°F. A. With one steam supply to the turbine driven AFW pump inoperable, or -------------------------------------------Note--------------------------------------------------:
Only applicable if MODE 2 has not been entered following refueling the turbine driven AFW pump inoperable following refueling, restore the affected equipment to OPERABLE status within 7 days and within 8 days from discovery of failure to meet the LCO. B. With one AFW train inoperable for reasons other than condition A, restore the AFW train to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. C. If the required action and associated completion times of condition A or B are not met, then the unit shall be placed in MODE 2 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in MODE 3 in the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and less than 300°F without reliance on the steam generators for decay heat removal within the next 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br />. D. With both AFW trains inoperable, then initiate actions to restore one AFW train to OPERABLE status immediately.
Technical Specification (TS) 2.0.1 and all TS actions requiring MODE changes are suspended until one AFW train is restored to OPERABLE status. (2) The motor driven train is required to be OPERABLE when T cold is below 300°F and the steam generators are relied upon for heat removal. With the motor driven AFW train inoperable, then initiate actions to restore one AFW train to OPERABLE status immediately.
Technical Specifications (TS) 2.0.1 and all TS actions requiring MODE changes are suspended until one AFW train is restored to OPERABLE status. 2.5-Page 1 Amendment No. 49, 127, 1 eQ, 278 TECHNICAL SPECIFICATIONS
2.0 LIMITING
CONDITIONS FOR OPERATION
2.5 Steam
and Feedwater Systems (3) A minimum of 55,000 gallons of water in the emergency feedwater storage tank (EFWST) and a backup water supply to the emergency feedwater storage tank shall be available.
With the EFWST inoperable, verify operability of the backup water supply within four hours and once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter, and restore the EFWST to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. If these action requirements cannot be satisfied, then the unit shall be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and less than 300°F without reliance on the steam generators for decay heat removal within the next 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br />. (4) The main steam stop valves are OPERABLE when Tcald is above 300°F and capable of closing in four seconds or less under no-flow conditions.
Basis A reactor shutdown from power requires a removal of core decay heat. Immediate decay heat removal requirements are normally satisfied by the steam bypass to the condenser.
Therefore, core decay heat can be continuously dissipated via the steam bypass to the condenser as long as feedwater to the steam generator is available.
Normally, the capability to supply feedwater to the steam generators is provided by operation of the turbine cycle feedwater system. In the unlikely event of complete loss of electrical power to the station, decay heat removal is by steam discharge to the atmosphere via the main steam safety and atmospheric dump valves. Either auxiliary feed pump can supply sufficient feedwater for removal of decay heat from the plant. Technical Specification
2.1.1 establishes
when the steam generators are required for heat removal. Each train includes the pump, piping, instruments, and controls to ensure the availability of an OPERABLE flow path capable of taking suction from the EFWST and delivering water to the steam generators.
If one of the two steam supplies to the turbine driven AFW pump is inoperable, or if the turbine driven pump is inoperable while the reactor coolant temperature T cold is above 300°F immediately following refueling, action must be taken to restore the inoperable equipment to OPERABLE status within 7 days. The 7 day completion time is reasonable based on the following reasons: a. For the inoperability of a steam supply to the turbine driven AFW pump, the 7 day completion time is reasonable since there is a redundant steam supply line for the turbine driven pump. b. For the inoperability of the turbine driven AFW pump while the reactor coolant temperature Tcald is above 300oF immediately subsequent to a refueling, the 7 day completion time is reasonable due to the minimal decay heat levels in this situation.
2.5-Page 2 Amendment No. 278 TECHNICAL SPECIFICATIONS
2.0 LIMITING
CONDITIONS FOR OPERATION
2.5 Steam
and Feedwater Systems Basis (Continued)
- c. For both the inoperability of a steam supply line to the turbine driven pump and an inoperable turbine driven AFW pump while the reactor coolant temperature T cord is above 300°F immediately subsequent to a refueling, the 7 day completion time is reasonable due to the availability of the redundant OPERABLE motor driven AFW pump, and due to the low probability of an event requiring the use of the turbine driven AFW pump. The eight day completion time for 2.5(1 )A provides a limit in the maximum time allowed for any combination to be inoperable during any continuous failure to meet the LCO. With one of the required AFW trains inoperable, actions must be taken to restore OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. With no AFW trains OPERABLE the unit is in a seriously degraded condition with no safety related means for conducting a cooldown, and only limited means for conducting cooldown with nonsafety grade equipment.
In such a condition the unit should not be perturbed by any action, including a power change, that might result in a trip. The minimum amount of water in the emergency feedwater storage tank is the amount needed for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of such operation.
The tank can be resupplied with water from the raw water system.(1 l A closure time of 4 seconds for the main steam stop valves is considered adequate time and was selected as being consistent with expected response time for instrumentation as detailed in the steam line break analysis.(2)(3 J References (1) USAR, Section 9.4.6 (2) USAR, Section 1 0.3 (3) USAR, Section 14.12 2.5-Page 3 Amendment No. 278 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 278 TO RENEWED FACILITY
1.0 INTRODUCTION
OPERATING LICENSE NO. DPR-40 OMAHA PUBLIC POWER DISTRICT FORT CALHOUN STATION, UNIT NO. 1 DOCKET NO. 50-285 By application dated March 31, 2014 (Agencywide Documents Access and Management System Accession (ADAMS) No. ML 14090A417), Omaha Public Power District (OPPD) requested changes to the Technical Specifications (TS, Appendix A to Renewed Facility Operating License No. DPR-40) for the Fort Calhoun Station, Unit No. 1 (FCS). The proposed amendment would revise TS 2.5, "Steam and Feedwater Systems," based on U.S. Nuclear Regulatory Commission (NRC)-approved Technical Specification Task Force (TSTF) Change Traveler TSTF-340, Revision 3, "Allow 7 Day Completion Time for a driven AFW Pump Inoperable," March 2000. Specifically, the proposed changes would revise TS 2.5 to allow a 7-day completion time for the turbine-driven (TO) auxiliary feedwater (AFW) pump, if the pump becomes inoperable in reactor Mode 3 following a refueling outage and prior to entry into Mode 2.
2.0 REGULATORY EVALUATION
The NRC staff considered the following regulatory requirements in its review of the licensee's application.
The Commission's regulatory requirements related to the content of the TSs are set forth in Title 10 of the Code of Federal Regulations (1 0 CFR) Section 50.36. Specifically, 10 CFR 50.36(c)(2)(ii)(B) requires that limiting conditions for operation (LCOs) be established for a process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. The NRC staff evaluated the proposed change to the current LCO for the TDAFW pump in accordance with the requirements of 10 CFR 50.36(c)(2)(ii)(B).
The AFW system is an engineered safeguards system and is described in Sections 6.1.2.1 and 9.4 of the FCS Updated Safety Analysis Report. Enclosure 2 3.0 TECHNICAL EVALUATION
3.1 Proposed
TS Changes Current TS 2.5 Applicability includes a note which states: NOTE: When heating the reactor coolant above 300°F the steam driven auxiliary feedwater (AFW) pump is only required to be OPERABLE prior to making the reactor critical.
The licensee proposed to delete the above Applicability note. Current TS 2.5 (1 )A states: A. With one steam supply to the turbine driven AFW pump inoperable, restore the steam supply to OPERABLE status within 7 days and within 8 days from discovery of failure to meet the LCO. Revised TS 2.5 (1 )A would state: A. With one steam supply to the turbine driven AFW pump inoperable, or ----------------------------------------------Note---------------------------------------------
Only applicable if MODE 2 has not been entered following refueling the turbine driven AFW pump inoperable following refueling, restore the affected equipment to OPERABLE status within 7 days and within 8 days from discovery of failure to meet the LCO. 3.2 Background FCS has two safety-related AFW pumps, one motor-driven and one turbine-driven.
The TSs require the AFW system to be operable when the reactor coolant temperature T cold is greater than 300 degrees Fahrenheit
(°F). The AFW system is designed to supply feedwater to the steam generators whenever the main feedwater system is not in operation (e.g., during startup, cooldown, or emergency conditions resulting in a loss of main feedwater).
One AFW pump provides sufficient flow to remove decay heat and cool the unit to shutdown cooling system entry conditions.
The specification, however, requires both trains to be operable.
The allowance for the TDAFW pump to be operable prior to making the reactor critical was approved by the NRC in Amendment No. 127 dafed April 9, 1990 (ADAMS Legacy Library No. 9004240140).
As stated in the safety evaluation for the amendment:
The 300°F coolant temperature will not provide enough steam for a normal operability test for the steam driven [turbine-driven]
AFW pump. Also, the present TSs do allow either the electrical or steam driven AFW pump to be operable when the reactor coolant temperature is above 300°F for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This was thought to be sufficient time for the plant to heat up to the point that a normal operability test for the steam driven AFW pump could be run. However, for the steam driven AFW pump, a longer time is required due to the steam generator soak period which affects the steam system's ability to heat up. This issue was resolved and approved by the NRC staff at the Palisades Plant by requiring that the steam driven pump be operable prior to making the reactor critical.
This allows sufficient heatup of the plant to be able to perform a normal operability test using non-nuclear heat. Therefore, the staff finds this change acceptable.
The current TS Note as written resolved the issue of having sufficient time for the plant to heat up in order to test the pump, but does not specifically restrict its applicability to following a refueling or provide an allowed time to be in this condition.
Therefore, the licensee proposed to incorporate the guidance in TSTF-340, Revision 3 to clarify the TS requirements.
OPPD has not converted the FCS TSs from the original custom TSs to NUREG-1432, "Standard Technical Specifications, Combustion Engineering Plants"; however, the NRC staff determined that the application of TSTF-340 to FCS TS 2.5 did not depend on the remainder of the FCS TSs aligning with NUREG-1432.
3.3 NRC Staff Evaluation The proposed change would change TS 2.5 to allow a 7-day completion time for the TDAFW pump if the inoperability occurs following a refueling outage and if Mode 2 had not been entered. In its application, the licensee proposed a change toTS 2.5 to conform to the changes made in TSTF-340, Revision 3. The.licensee stated that the change was needed to prevent unnecessary reactor mode changes and requests for enforcement discretion during startup following refueling.
The proposed change achieves this by allowing additional time in Mode 3, prior to entering Mode 2, to repair and retest the TDAFW pump if the pump is declared inoperable because the surveillance requirements could not be met. With the proposed change, if a condition exists in which the unit is in Mode 3 and repairs to the TDAFW system are required, and the 7-day completion time expires for Specification 2.5 (1)A, then the requirements of Specification 2.5 (1 )C would apply, and the licensee must cool down the unit to T cold less than 300 oF without reliance on the steam generators for decay heat removal within the next 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br />. The NRC staff concludes that the proposed change for conditions with T cold above 300 °F and before entering Mode 2 is acceptable because (1) the AFW design (one motor-driven AFW pumps and one TDAFW pump) affords adequate redundancy to allow the TDAFW pump to remain inoperable for the proposed completion time, and (2) the restriction of the completion time after a refueling outage without having entered Mode 2 assures the core decay heat load is at a minimal level. The low decay heat in the post refueling outage core is because of the low decay heat of the remaining fuel assemblies in the core, and the lack of decay heat from new fuel assemblies added to the core during the outage. The justification is the same as that approved by the NRC staff for TSTF-340, Revision 3, for incorporation into NUREG-1432.
The proposed change continues to comply with 10 CFR 50.36 and is therefore acceptable.
The licensee also submitted TS Bases changes corresponding to the proposed TS changes. The TS Bases changes are consistent with the proposed TS changes and provide the purpose for each requirement in the specification as required by 10 CFR 50.36(a)(1
). The proposed Bases changes are consistent with the Commission's Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, dated July 2, 1993 (58 FR 39132). Therefore, the NRC staff has no objection to the proposed changes to the TS Bases.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Nebraska State official was notified of the proposed issuance of the amendment.
The State official had no comments.
5.0 ENVIRONMENTAL
CONSIDERATION The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure.
The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding published in the Federal Register on July 8, 2014 (79 FR 38592). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Principal Contributor:
L. Wheeler, NRR/DSS/SBPB Date: December 22, 2014 December 22, 2014 Mr. Louis P. Cortopassi Site Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station 9610 Power Lane, Mail Stop FC-2-4 Blair, NE 68008
SUBJECT:
FORT CALHOUN STATION, UNIT NO. 1 -ISSUANCE OF AMENDMENT RE: CHANGE TO TECHNICAL SPECIFICATION 2.5 (TAC NO. MF3788)
Dear Mr. Cortopassi:
The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 278 to Renewed Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated March 31, 2014. The amendment revised TS 2.5, "Steam and Feedwater Systems," to allow a 7-day completion time for the turbine-driven auxiliary feedwater pump if the inoperability occurs following a refueling outage and if Mode 2 has not been entered based on Technical Specification Task Force (TSTF) Change Traveler TSTF-340, Revision 3. A copy of the related Safety Evaluation is also enclosed.
The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Docket No. 50-285
Enclosures:
Sincerely, IRA/ Carl F. Lyon, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
- 1. Amendment No. 278 to DPR-40 2. Safety Evaluation cc w/encls: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL4-1 Reading RidsAcrsAcnw_MaiiCTR Resource RidsNrrDoriDpr Resource RidsNrrDoriLpl4-1 Resource RidsNrrDssSbpb Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMFortCalhoun Resource RidsRgn4MaiiCenter Resource LWheeler, NRR/DSS/SBPB ADAMS Accession No ML 14328A814
- memo dated OFFICE NRR/DORL/LPL4-1
/PM NRR/DORL/LPL4-1
/PM NRRIDORLILPL4-1
/LA N RRIDSS/STS 8/BC NAME JKios FLyon JBurkhardt REIIiott DATE 12/10/14 12/10/14 12/9/14 12/17/14 OFFICE NRRIDSS/SBPB/BC OGC/NLO NRR/DORL/LPL4-1
/BC(A) NRR/DORLILPL4-1
/PM NAME GCasto* MSpencer EOesterle FLyon DATE 11/4/14 12/19/14 12/22/14 12/22/14 OFFICIAL RECORD COPY