LER 95-003-00:on 950207,test Results Showed That SRVs Failed Setpoint Test Acceptance Criteria.Caused by Corrosion Bond of SRV Pilot Disc/Seat Interface.Two out-of-tolerance Target Rock Valves Being Refurbished & retested.W/950307 Ltr
ML18038B181
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 03/07/1995
From: HSIEH C S, MACHON R D
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-95-003, LER-95-3, NUDOCS 9503140057
Download: ML18038B181 (16)


Text

P R.IC)R.IWY'ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9503140057 DOC.DATE: 95/03/07 NOTARIZED:

NO DOCKET g FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 AUTH.NAME AUTHOR AFFILIATION HSIEH,C.S.

Tennessee Valley Authority MACHON,R.D..

Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

LER 95-003-00:on 950207,test results showed that SRVs failed setpoint test acceptance criteria.Caused by corrosion bond of SRV pilot disc/seat interface.Two out-of-tolerance target rock valves being refurbished

&retested.W/950307 ltr.DISTRIBUTION CODE: IE22T COPIES RECEIVED: LTR ENCL j SIZE: 7 TITLE: 50.73/50.'9 Licensee Event Report (LER), ncident Rpt, etc.NOTES RECIPIENT ID CODE/NAME PD2-4-PD COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1 1 WILLIAMS,J.

COPIES LTTR ENCL 1 1 INTERNAL: ACRS AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DOPS/OECB NRR/DRCH/HICB NRR/DRSS/PRPB NRR/DSSA/SRXB RGN2 FILE 01 1 1 1=1 1 1 2 1 1 1~A'EODQSPD/RAB 1~FILE CENTE~R 02 1 NRR/DE/EELB 1 NRR/DISP/PIPB 1 NRR/DRCH/HHFB 1 NRR/DRCH/HOLB 2 NRR/DSSA/SPLB 1 RES/DSIR/EIB 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 EXTERNAL: L ST LOBBY WARD NOAC MURPHY,G.A NRC PDR 1 1 1 1 1 1 LITCO BRYCE,J H NOAC POORE,W.NUDOCS FULL TXT 2 2 1 1 1 1'NOTE TO ALL"RI DS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!COYTACI THE DOCliIEYTCONTROL DESK, ROONI P!-37 (EXT.504.2083)TO EL!i!IRATE YOL'R WAFFIE FROil DISTRIBUTION LISTS I'OR DOCl.'ML'iTS YOL'Oi"I'LIED!FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED'TTR 27 ENCL 27 0

Tennessee vaaey Avtnon'y.post otfce Box 2000.Debtor.Ataoanta 35609-2000 R.D.(Rick)Machon Vice Pres!dani.

Browne Ferry at~.Rant March 7, 1995 U.S..'Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555

Dear Sir:

10 CFR 50.73 BROWNS FERRY NUCLEAR PLANT (BFN)-UNITS 1q 2I AND 3-DOCKET NOS~50-259~50-260'ND 296-FACILITY OPERATING LICENSE DPR-33~52'ND 68-LICENSEE EVENT REPORT 50-260/95003 The enclosed report provides details concerning the Unit 2 main steam safety/relief valves (SRVs)exceeding.

the technical specifications setpoint limit during tests.A supplemental report will.be submitted after the test results of all 13 SRVs have been received.This report is submitted in accordance with 10 CFR 50.73 (a)(2)(i)'(B) as a condition prohibited by the plant's technical specifications.

Mal~>R.D.-M on Site Vice President Enclosure cc: See page 2'st503140057 950307 PDR ADOCK 05000260 S PDR A)gP I~

U.S.Nuclear Regulatory Commission Page.2 March 7, 1995 Enclosure cc (Enclosure):

INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 Paul Krippner American Nuclear Insurers Town Center, Suite 300S 29 South Main Street West Hartford, Connecticut 06107.NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611 Regional Administrator U.S.Nuclear Regulatory Commission Region'I 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr.J.F.Williams, Project Manager U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 E.V.Imbro, NRR/RSIB U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 E.J.Leeds, NRR/DRPW U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland.20852 0 1'h I NRC FORH 366 (5-92)U.S.N}CLEAR REGULATORY CQNIISS ION APPROVED BY (NHI NO.3150-0104 EXPIRES 5/31/95 LICENSEE EVENT REPORT (LER)(See reverse for required number of digits/characters for each block)ESTIHATED BURDEN PER RESPONSE TO COHPLY lIITH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS.FORlIARD COMHENTS RECARDING BURDEN ESTIHATE TO THE INFORMATION

'AND RECORDS HANACEMEHT BRANCH (HNBB 7714), U.S.NUCLEAR REGULATORY COMHISSION, NASHINGTON, DC 20555-0001 AND TO THE PAPERNORK REDUCTION PROJECT (3180-0104), OFFICE OF HANAGEHENT AND BUDGET IIASHINGTON OC 20503.FACILITY NAHE (1>Browns Ferry Nuclear Plant (BFN)Unit 2 DOCKET IRNIBER (2)05000260'PACE (3)1OF5 TITLE (4)Main Steam Safety/Relief Valves Exceeded the Technical Specifications Required Setpoint Limit as a Result of Disc/Seat Bonding HO}ITH DAY 02 07 YEAR 95'VENT DATE 5 YEAR 95 LER}AMBER 6 SEQUENTIAL NUMBER REVISION NUHBER 003 00 REP(NIT DATE 7 HOHTH 03 DAY 07 OTHER FACILITIES INVOLVED 8 FACILITY NAHE YEAR NA FACILITY NAHE NA DOCKET NUMBER DOCKET NUHBER OPERATING INX}E (9)P(NER LEVEL (10)N 100 20.405(s)('1)(ii) 20.405(s)(1)(iii) 20.405(a)(1)(iv) 20.405(s)(1)(v)

X THIS REPORT IS SlÃNITTEO PINISUANT 20.402(b)20.405(a)('l)(i) 20.405(c)50.36(c)(1) 50.36(c)(2) 50.73(a)(2)(i)(B) 50'3(a)(2)(ii) 50'3(a)(2)(iii) 50.73(s)(2)(iv) 50.73(a)(2)(v) 50.73(a)(2)(vii) 50.73(a)(2)(viii)(A) 50.73(a)(2)(viii)(B) 50.73(s)(2)(x) 73.71(b)73.71(c)OTHER (Specify in Abstract below and in Text, NRC Form 366A e 11 TO THE REQUIREMENTS OF 10 CFR=Check one or mor LICENSEE CONTACT FOR THIS LER 12 NAME Clare S.Hsieh, Compliance Licensing Engineer TELEPHONE NUHBER (Include Area Code)(205)729-2635 C(NPLETE ONE LINE FOR EACH IXNIP(NIENT FAILURE DESCRIBED IN THIS REPORT 13 CAUSE SYS TEH COMPONEN'I MANUFACTURER REPORTABLE

+js:;t',i!i"'~!i"i'll:

TO NPRDS CAUSE SYSTEM COHPONENT MANUFACTURER REPORTABLE TO NPRDS SB RV T020 SUPPLEMENTAL REPORT EXPECTED 14 YES (If yes, complete EXPECTED SUBHISSION DATE).EXPECTED SISM ISS ION DATE (15)MONTH OAY'YEAR 04 10 95 ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines)(16)On February 7, 1995, Wyle Laboratories notified TVA that tests had been completed for 2 of the 13 Unit 2 main steam safety/relief valves (SRVs).The results of the tests showed that the SRVs failed the setpoint test acceptance criteria.The SRV setpoints were found outside the Technical Specification (TS)limit of+/-one-percent setpoint tolerance.

This condition is reportable in accordance with 10 CFR 50.73(a)(2)(i)(B) as a condition prohibited by the plant's TS.The apparent cause was attributed to corrosion bonding of the SRV pilot disc/seat interface resulting in an upward setpoint drift.TVA will submit a supplemental report following receipt of the test results of the remaining SRVs.TVA has implemented one of the Boiling Water Reactor Owners Group's recommendations to reduce corrosion.

During the Unit 2 Cycle 7 refueling outage, TVA removed the SRV pilot cartridges from the main steam SRVs and replaced them with cartridges refurbished with a 0.3 percent platinum alloyed stellite pilot disc.HRC FORM 366 (5-92)

I' HRC FORH 366A~(5-92>LICENSEE EVENT REPORT TEXT CONTINUATION U.S.NUCLEAR REGULATORY C(HSIISSIOH APPROVED BY (HHI HO.3150-0104 EXP I RES 5/31/95 ESTIMATED BURDEN PER'RESPONSE TO COHPLY llITH THIS INFORHATIOH COLLECTIOH REOUEST: 50.0 HRS.FORllARD COHHENTS REGARDING BURDEN EST INATE TO THE INFORHATI OH AND RECORDS NANAGEHEHT BRANCH (HNBB 771C), U.S.NUCLEAR REGULATORY CQQIISSION, MASHINGTON, DC 20555-0001, AHD TO THE PAPERllORK REDUCTIOH PROJECT (3150-0104), OFFICE OF NANAGEHEHT AND BUDGET/'LIASHINGTOH DC 20503 FACILITY WL%(1)DOCKET NHIBER (2)'YEAR'LER IRMBER (6>SEOUEHT I AL NUHBER REVISION HUHBER PAGE (3)Browne Ferry Unit 2 05000260 95 003 00 2 of 5 TEXT If more s ce is r ired use sdditionst co ies of HRC Form 366A (17)I~PLANT CONDITIONS Unit 2 was operating at approximately 100 percent power.During the Unit 2 Cycle 7 refueling outage, the safety/relief valve (SRV)pilot cartridges were removed from the Unit 2 main steam (SB)SRVs (RV)for testing.Units 1 and 3 were shutdown and defueled.DESCRIPTION OF EVENT Event: B.On February 7, 1995, Wyle Laboratories notified TVA that the tests on the first 2 of the 13 Unit 2 main steam SRVs (Target Rock Two-Stage SRV Model No.7576F)had been completed.

The results of the tests showed that the SRVs failed the setpoint test acceptance criteria.During the Unit 2 Cycle 7 refueling outage, the SRV pilot cartridges were removed from the Unit 2 main steam SRVs and sent to Wyle Laboratories for testing.On February 7, 1994, the first two SRV pilot cartridges were bench tested, and the test results showed that the pilot cartridges caused the SRVs to open outside the Technical Specifications (TS)limit of+/-one-percent of setpoint tolerance (i.e., the test results were+3.85 percent and+1.95 percent, respectively).

The above condition is reportable in accordance with 10 CFR 50.73(a)(2)(i)(B) as a condition prohibited by the plant's TS.Ino erable Structures Com onents or S stems that Contributed to the Event: C.None.Dates and A roximate Times of Ma'or Occurrences:

During the Unit 2 Cycle 7 outage (October 1, 1994 through November 23, 1994), SRVs pilot cartridges were removed from the Unit 2 main steam SRVs and shipped to Wyle Laboratories for testing.On February 7, 1995, TVA was notified on the results of the first two SRVs tested.D.Other S stems or Seconda Functions Affected: None.

0 l, I NRC F(RN 366A (5-92)U.S.IQCLEAR REGULATORY C(WIISSION LICENSEE EVENT REPORT TEXT CONTINUATION APPROVED BY (HB NO.3150-0104 EXPIRES 5/31/95 ESTIMATED BURDEN'PER RESPOHSE TO COHPLY UITH THIS INFORMATION COLLECT ION REQUEST: 50.0 HRS.FORllARD CONNENTS REGARDING BURDEN ESTIHATE TO THE INFORMATION AMD RECORDS MANAGEMENT BRANCH (HHBB 771C), U.S.NUCLEAR'EGULATORY COMMISSION, llASHIHGTON, DC 20555-0001

'MD TO THE PAPERNORK REDUCTIOM PROJECT (3150-0104), OFFICE OF MANAGEMENT AMD BISGET, UASHINGTOH DC 20503 FACILITY KAID (1)Browns Ferry Unit 2 DOCKET NWSER (2)05000260 TEAR 95 LER IAHmER (6)SEOUENT IAL NUMBER 003 REVISION NUMBER 00 PAGE (3)3 of 5 TEXT If more s ce is r ired use additional co ies of MRC Form 366A (17)E.Method of Discove The deviation from the SRV setpoints was identified during bench testing at Wyle Laboratories in Huntsville, Alabama.F..0 erator Actions: None.Safet S stem Res onses: None.CAUSE OF THE EVENT Ao Immediate Cause: The immediate cause was the deviation of SRV setpoints outside the testing setpoint 1'imit of+/-one-percent tolerance recpxired by TS 2.2.A.B.Root Cause: The apparent cause of this event was attributed to corrosion bonding at Target Rock two-stage SRV pilot disc/seat interface.

Since corrosion:bonding caused an increase in the valve opening pressure due to the need for additional opening force above the setpoint value, this resulted-in an upward setpoint drift.IV ANALYSIS OF THE EVENT Thirteen main steam relief valves (MSRVs)on the main steam piping perform the safety/relief function for the primary reactor system ,boundary.

Each valve is designed to open at a pressure sensed in the valve body of 1105, 1115, or 1125 psig providing a safety/relief function.The safety/relief function of the MSRVs is to limit primary reactor system pressure to<1375 psig in the event of a pressurization transient resulting from a turbine trip or a main steam isolation valve closure.TVA has performed a cycle specific limiting pressurization transient analysis assuming a spectrum of MSRV failures and setpoint drifts.Even if four MSRVs completely fail to open and the remainder operating ten percent above setpoint, the analysis conservatively II Cl NRC FORN 366A (5-92)U.S.IN)CLEAR REGULATORY CQHII SSI ON, LICENSEE EVENT REPORT TEXT CONTINUATION APPROVED BY (NNI NO.3150-0104 EXPIRES 5/31/95 ESTINATED BURDEN PER RESPONSE TO CONPLY MITH THIS INFORHATIOH COLLECTION REOUEST: 50.0 HRS~FORllARD CONHENTS REGARDING BURDEN EST INATE TO THE INFORNAT ION AND RECORDS NAHAGENENT BRANCH (NHBB 7714), U.S.NUCLEAR REGULATORY COHNISS ION g'ASHIHGTON, DC 20555-0001, AHD TO THE PAPERNORK REDUCTI OH PROJECT (3150-0104), OFFICE OF NAHAGENENT AND BUDGET, WASHINGTON DC 20503.FACILITY NAIK (1)DOCKET NLM8ER (2)LER IRMBER (6)YEAR SEQUENTIAL REVISION HUNGER NUNBER PAGE (3)Browns Ferry Unit 2 05000260 95 003 00 4 of 5 TEXT lf more s ce is r ired Use additional co les of NRC Form 366A (17)shows that the primary reactor system pressure would not have exceeded 1355 psig.As this is within the safety limit of 1375 psig given in TS section 1.2.A, the plant and the public safety would not have been adversely affected and the safety of plant personnel was not compromised.

V CORRECTIVE ACTIONS Ao B~Immediate Corrective Actions: The two out-of-tolerance Target Rock valves are currently being refurbished, retested, and recertified by Wyle Laboratories for use as spares.Corrective Actions to Prevent Recurrence:

The setpoint drift is a generic concern experienced by all utilities using this brand of SRV in boiling water reactors (BWR)and is being investigated by the BWR Owners'roup (BWROG)SRV Drift Fix Development Committee and the manufacturer, Target Rock Corporation.

The Committee recommended replacing the existing stellite 6B pilot disc with a 0.3 percent platinum alloyed stellite or installing several parts in the pilot disc/seat area with catalyst plated platinum alloy to act as a recombiner of excess oxygen, thereby reducing the oxygen available for corrosion.(Note: corrosion is being attributed to radiologically produced o'xygen collecting at the disc/seat interface.)

The Committee's recommendation on replacing the stellite 6B pilot disc with a platinum alloyed stellite has been implemented at BFN.During the Unit 2 Cycle 7 refueling outage, TVA replaced the Unit 2'ain steam SRVs with a 0.3 percent platinum alloyed stellite pilot disc.Per TS requirements, the valves are bench tested and checked for any increased setpoint deviation or drift at the end of each Unit 2 operating cycle.As a SRV Drift Fix Committee member, TVA is continuing to participate in the BWROG evaluation on the long term solution concerning the SRV setpoint drift problem.TVA will provide a supplemental report after receiving the test results of all 13 Unit 2 SRVs from Wyle Laboratories.

0 II J HRC F(XIH 366A (5-92)U.S.is)CLEAR, REGULATORY C(HHISSIOH LICENSEE EVENT REPORT TEXT CONTZNUATZON APPROVED BY 0$NO.3150-0104 EXPIRES 5/31/95 ESTIHATED BURDEN PER RESPONSE TO CDHPLY IIITH THIS IHFORHATIOH COLLECT ION REQUEST: 50.0 HRS~FORHARD COHHENTS REGARDING'BURDEN'ST IHATE TO THE IHFORHAT ION AHD RECORDS HANAGEHEHT BRANCH (HHBB 7714), U.S.NUCLEAR REGULATORY COHHISSIOH, UASHINGTON, DC 20555-0001, AND TO THE PAPERMORK REDUCTION PROJECT (3150-0104), OFFICE'F HANAGEHENT AND BISGET~UASHIHGTON DC 20503 FACILITY WVK (1)Browne Ferry Unit 2 DOCKET IAMBER (2)05000260 LER INNER (6)TEAR SEQUENTIAL NUHBER 95 003 REVISION NUHBER 00 PAGE (3)5 of 5 TEXT lf more s ce is r ired use additional co ies of NRC Form 366A (17)VZ~ADDITIONAL INFORMATION A.Failed Com onents: Target Rock Two-Stage, SRVs Model'No.7567F.B.Previous LERs on Similar Events: VZI.Since the early 1980s, TVA has issued several LERs (e.g., 296/81074, 259/83036, 260/87005, 259/88053, 260/93003) regarding MSRV setpoint drift due to disc/seat corrosion bonding.The BWROG and the valve manufacturer are pursuing corrective actions for the disc/seat corrosion bonding problem.TVA expects the corrective action of using platinum alloy for disc/seat interface should help toward reducing corrosion bonding and thus, decreasing setpoint drift problems in the future.Commitments None Energy Industry Identification System (EIIS)system and component codes are identified in the text with brackets (e.g.,[XX].