Proposed Tech Spec Re RHR Pump Operability
ML17345B303
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/13/1983
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17345B302 List:
References
NUDOCS 8310180327
Download: ML17345B303 (2)


Text

~.5.TWO residual heat removal pumps shall be operable.6.TWO-residual heat exchangers shall be operable.7.All valves, interlocks and piping assoicated with the above components and required for.post accident operation, shall be operable.except valves that are positioned and locked.Valves 864-A, 8, 862-A,B, 865-A, 8, C;866-A, 8 shall have power removed from their motor operators by locking open th'e circuit breakers at the Hotor Control Centers.The air supply to valve 758 shall be shut off to the valve operator.b.During power operation, the requiranents of 3.4.1a may be modified to allow one of the following components to be inoperable (including associated valves and piping)at any one time except for the cases s+iated i n 3.4.l.b.2.

If.the system is not restored to meet the requiranents, of 3.4.la within the tine period specified, the reactor shall be placed in the hot shutdown condition.

If the~requirements of 3.4.la are not satisfied within an additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> the reactor shall be placed in the cold shutdown condition.**

Specification 3.0.1 applies to 3.4.l.b.l.ONE accumulator may be out of service for a period of up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.2.ONE of FOUR safety injection pumps may be out of service.for 30 days.A second safety injection pump may be out of service, provided the pump is restored to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.TWO of the FOUR safety injection.

pumps shall be tested to demonstrate operability before initiating maintenance of the inoperable pumps.3.ONE channel of heat tracing on the flow path may be out of service for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.*4.ONE residual heat removal pump may be out of service, provided the pump is restored to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.In addition the other residual heat removal pump shall be tested to demonstrate operability prior to initiating maintenance of the inoperable pump.*See reference (ll)on page 8.3.4-2**For the 30-day period ending at midnight 11-12-83, placing the plant in cold shutdown due to one RHR pump being inoperable is not required providing that 350PF>Tave>200.3.4-2 Amendments 87&81 83iOi80327 83iOi3 PDR ADQCK 05000250 P PDR a)~l i I