Category:LICENSEE EVENT REPORT (SEE ALSO AO
MONTHYEARML18017A8671999-09-10010 September 1999 LER 99-007-00:on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With 990910 Ltr ML18016A9801999-06-0404 June 1999 LER 99-006-00:on 981124,failed to Comply with TS 4.0.4 & TS 3/4.6.3, Civ. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Will Be Revised.With 990604 Ltr ML18016A9111999-04-12012 April 1999 LER 99-005-00:on 990313,plant Exceeded ESFAS TS 3.3.2,Action 21.Caused by Inadequate Procedure Rev Preparation.Licensee Revised Applicable Maint Surveillance Test Procedure (MST-10072) to Identify TS Required Actions.With 990412 Ltr ML18016A8971999-04-0808 April 1999 LER 99-004-00:on 990312,unit Trip Was Noted.Caused by Degraded Condition of SG Water Level Flow Control Valve. Replaced Positioners on All Three FW Regulating Valves.With 990408 Ltr ML18016A7971999-02-0505 February 1999 LER 99-001-00:on 990106,SF Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Fasteners Bending Under Specific Circumstances.Increased Water Level.With 990205 Ltr ML18016A7941999-01-29029 January 1999 LER 98-004-01:on 980313,identified Design Deficiency Re Potential Runout of Tdafwp.Caused by Inadequate Original AFW Sys Design.Operability Evaluation Was Completed on 980313 & Addl Engineering Analysis Was Performed by Vendor ML18016A4701998-06-30030 June 1998 LER 97-021-03:on 980210,discovered That SFP Water Level Had Not Been Verified Greater than 23 Feet Above BWR Fuel Assemblies.Caused by Misinterpretation of TS Requirements. Will Submit TS Change Request to Revise TS 3.9.1.11 ML18016A4491998-06-0808 June 1998 LER 98-006-00:on 980508,failure to Perform Insp & Preventive Maint on MCCB as Required by TS Was Noted.Caused by Inadequate Sps.Tested 9 Pressurizer Heater Bank Breakers by Cycling each.W/980608 Ltr ML18022B0551998-05-20020 May 1998 LER 98-005-00:on 980420,TS Verbatim non-compliance Was Determined.Caused by Misinterpretation of TS Requirements. Issued Memo to Reemphasize Need to Comply W/Literal Meaning of TS Requirements in Verbatim manner.W/980520 Ltr ML18016A3441998-03-12012 March 1998 LER 97-021-02:on 980210,identified Failure to Properly Test non-safety Related Pressurizer Porv.Caused by Inadequate Surveillance Test Procedures.Revised Operations Surveillance Test OST-1117 to Include Testing of Subject PORV ML18016A3211998-02-20020 February 1998 LER 98-002-00:on 980121,solid State Protection Sys Testing Deficiency Occurred.Caused by Inadequate Review of Initial Tech Specs.Ts Testing Frequency for P-11 Permissive Revised. W/980217 Ltr ML18016A2201997-10-22022 October 1997 LER 97-021-01:on 970922,discovered That Spent Fuel Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Misinterpretation of TS Requirements.Revised Daily Surveillance Procedures ML18016A2081997-10-14014 October 1997 LER 97-016-01:on 970608,reactor Trip Occurred,Due to Personnel Error While Attempting to Adjust Power Range Nuclear Instrumentation Channel Following Performance of Calorimetric.Procedures revised.W/971014 Ltr ML18016A1931997-09-29029 September 1997 LER 97-022-00:on 970829,TS Required Shutdown Due to Expiration of AFW Lco.Caused by Personnel Error.Completed Repairs TDAFW Pump & Returned Plant to Svc on 970831. W/970926 Ltr ML18012A8641997-08-18018 August 1997 LER 97-019-00:on 970720,turbine Trip/Reactor Trip Occurred. Caused by Three Phase Fault That Collapsed Excitation Field in Main Generator,Resulting in Generator Lockout.Exciter Rotor Assembly Was replaced.W/970818 Ltr ML18012A8581997-08-0808 August 1997 LER 96-018-01:on 960903,manual Reactor Trip Occurred Due to Loss of Normal Sw.Caused by Mechanical Failure of B Water Pump & a Normal SW to Remain Running Once Manually Started.Restored a Normal SW Pump to Svc ML18012A8471997-07-31031 July 1997 LER 97-018-00:on 970701,determined That Plant Procedures Had Not Received Proper Reviews & Approvals.Caused by Failure to Comply W/Plant Administrative Procedure AP-006.Counseled Involved individuals.W/970731 Ltr ML18012A8371997-07-24024 July 1997 LER 97-S01-00:on 970405,unescorted Access Inappropriately Granted to Contract Outage Workers Was Determined.Caused by Personnel Error.Access Files for Individuals Inappropriately Granted Unescorted Access Were Placed on Access Hold ML18012A8291997-07-11011 July 1997 LER 97-017-00:on 970612,failed to Recognize Inoperable Reactor Afd Monitor.Caused by Personnel Error.Operators Involved in Event Will Be Counseled Prior to Assuming Shift duties.W/970711 Ltr ML18012A8241997-07-0202 July 1997 LER 97-015-00:on 970602,inadequate Auxiliary Feedwater Sys Flow Control Valve Surveillance Testing Deficiency Was Identified.Caused by Failure to Recognize Impact on TS 4.7.1.2.1.Readjusted AFW FCV Actuator spring.W/970702 Ltr ML18022B0181997-06-13013 June 1997 LER 97-014-00:on 970514,SI Occurred During Ssps Surveillance Testing.Caused by Inattention to Detail During Recent Rev to Surveillance Test Procedure Being Used.Revised Deficient Surveillance procedures.W/970613 Ltr ML18012A8011997-06-0404 June 1997 LER 97-012-00:on 970505,determined That Previous Auxiliary Control Panel Had Not Verified Operability of Interposing Relays.Caused by Misinterpretation of Tss.Reviewed Other Remote Shutdown Panel Transfer circuitry.W/970604 Ltr ML18012A7751997-05-0505 May 1997 LER 97-008-00:on 970404,safety-related AHU Not Declared Inoperable During Maintenance on Associated Temperature Switches Resulting in Violation of Ts.Caused by Incorrect Interpretation.Operations Night Order issued.W/970505 Ltr ML18022B0151997-04-17017 April 1997 LER 97-006-00:on 970318,breach Was Identified in Thermo-Lag Fire Barrier Wall Due to Inadequate Initial Design,Poor Construction Methods & Incomplete as-built Design.Visual Insp of Thermo-Lag Barrier Walls performed.W/970417 Ltr ML18012A6031997-03-31031 March 1997 LER 97-003-00:on 970227,steam Generator Low Level Protection Circuitry Outside Design Basis Occurred.Caused by Inadequate Failure Modes & Effects Analysis Performed as-built Piping Configuration for S/G Level.Review performed.W/970331 Ltr ML18012A5801997-03-17017 March 1997 LER 97-005-00:on 960320,failure to Perform Core Flux Mapping Following Plant Operation with Reactor Power Greater than 100% Occurred.Cause Was Implemented Containing Inappropriate Guidance for Short Excursions.Change withdrawn.W/970317 Ltr ML18012A5431997-03-0303 March 1997 LER 97-001-00:on 970131,automatic Reactor Tripped Resulting from SG low-low Level.Caused by Inadvertent Closure of Mfiv (1FW-159) & Faulty Hydraulic Relays.Shuttle Valves Replaced, SG Level Discrepancy investigated.W/970303 Ltr ML18012A4661997-01-17017 January 1997 LER 96-025-00:on 961218,determined Missed Surveillance Test on PORV Block Valve 1RC-115.Caused by Personnel Error.Tested 1RC-115 & Counseled Personnel involve.W/970117 Ltr ML18012A4481996-12-23023 December 1996 LER 96-022-00:on 961122,wiring Discrepancy Was Found in Auxiliary Building Ventilation Sys Circuitry.Caused by Personnel Error.Training on This Event Will Also Be Performed for Appropriate maintenance.W/961220 Ltr ML18012A4451996-12-16016 December 1996 LER 96-023-00:on 961114,design Deficiency Was Noted in EDG Protection Circuitry.Caused by Overloading of Diesel Generator in Conjunction W/Reduction of Voltage.Applicable EDG Test Procedures Will Be revised.W/961216 Ltr ML18012A4381996-12-0909 December 1996 LER 96-021-00:on 961107,inadequate post-maint Testing Following Repairs on Containment Isolation Valve 1SP-208 Identified.Caused by Misinterpretation of ASME Code. Procedures revised.W/961209 Ltr ML18012A4321996-11-27027 November 1996 LER 96-013-01:on 961028,condition Outside of Design Basis Where RWST Had Been Aligned W/Nonseismically Qualified Sys Noted.Caused by Failure to Reconcile Operating Procedure Lineups.Administrative Controls established.W/961125 Ltr ML18012A3961996-10-0707 October 1996 LER 96-019-00:on 960906,downed Power Lines & Trees Blocked Plant Access Roads Hampering Site Personnel from Accessing Plant.Caused by Passage of Hurricane Fran.Plant Roads Were Cleared on 960906 & Plant restarted.W/961007 Ltr ML18012A3811996-09-27027 September 1996 LER 96-010-02:on 960628,identified Surveillance Testing Deficiencies That Caused Past Entries Into TS 3.0.3.Caused by Personnel Error.Surveillance Test Procedures OST-1008 & OST-1092 revised.W/960927 Ltr ML18012A3731996-09-18018 September 1996 LER 96-002-12:on 960819,failed to Properly Perform TS Surveillance Testing.Caused by Error That Occurred During Procedure Rev in June 1993.Counseled personnel.W/960918 Ltr ML18012A3541996-09-0606 September 1996 LER 96-014-00:on 891127,identified Condition of Two Charging/Safety Injection Pumps Connected to Same Emergency Electrical Bus.Caused by Failure to Follow Operating Procedures.Racked Out 6.9 Kv breaker.W/960909 Ltr ML18022A9861996-08-26026 August 1996 LER 96-012-00:on 960724,SIII Inverter Was Taken OOS for Repair.Caused by Faulty ferro-resonant Transformer within Inverters Internal Circuitry.Repairs & Load Testing for Siii Were completed.W/960826 Ltr ML18012A3421996-08-0808 August 1996 LER 96-002-11:on 960709,failure to Perform Required Surveillance Testing During Planned Maint in Oct 1994 Identified.Caused by Personnel error.OST-1809 Performed During Refueling Outage 6.W/960808 Ltr ML18012A3151996-07-29029 July 1996 LER 96-002-10:on 960627,failed to Properly Perform TS Surveillance Testing.Caused by Personnel Error.Counseled personnel.W/960729 Ltr ML18012A3131996-07-29029 July 1996 LER 96-010-01:on 960628,surveillance Test Deficiencies Identified in Quarterly RHR Sys.Caused by Inadequate Test Procedures Resulting from Personnel Errors.Scheduled Tests on Administrative Hold & Procedures revised.W/960729 Ltr ML18012A2901996-06-28028 June 1996 LER 96-002-08:on 960529,failed to Perform Tech Spec Surveillance Testing.Caused by Personnel Error.Counseled Personnel,Revised Procedure & Continued in-progress Tech Spec Testing Program review.W/960628 Ltr ML18012A2491996-05-28028 May 1996 LER 96-008-00:on 960425,turbine/trip Reactor Trip Occurred Due to Main Generator Lockout.Caused by Failure of Output Breaker Disconnect.Failed a Phase Disconnect Switch on Breaker 52-7 replaced.W/960528 Ltr ML18012A2131996-04-15015 April 1996 LER 96-005-00:on 960312,failure to Properly Test Containment Bldg Outer Personnel Air Lock Door Occurred.Caused by Personnel Error.Individual Involved Counseled.W/Undated Ltr ML18012A1941996-04-0404 April 1996 LER 96-004-01:on 960205,RWST Level Transmitters Failed & Violation of TS Action Statement Occurred.Caused by Freezing of Level Transmitter Sensing Lines.Frozen Lines Thawed & Missing Insulation replaced.W/960404 Ltr ML18012A1841996-03-25025 March 1996 LER 96-002-02:on 960223,failed to Properly Perform TS Surveillance Testing.Caused by Personnel Error.Counseled Personnel & Revised Appropriate procedures.W/960322 Ltr ML18012A1741996-03-22022 March 1996 LER 95-011-01:on 951105,reactor Trip/Safety Injection Occurred During Solid State Protection Sys Testing Due to Failure of Relay Contact & Unplanned ESF Actuation Occurred During troubleshooting.W/960322 Ltr ML18012A1581996-03-0606 March 1996 LER 96-004-00:on 960205,RWST Level Transmitters Failed High Due to Freezing That Resulted in Entry Into TS LCO 3.0.3 & Subsequent Violation of TS Action Statement.Revised Procedure to Correct steps.W/960306 Ltr ML18011B1001996-01-12012 January 1996 LER 95-014-00:on 940424,RHR Sys Components Removed from Service as Directed During Testing,While Required for Operability.Caused by Procedure Inadequacies.Test Will Be Revised to Correct Procedure by 960215.W/960112 Ltr ML18116A0761996-01-11011 January 1996 LER 95-015-00:on 951213,mod Made to Circuitry for Motor Drive Afps Flow Control Valves.Caused by Cognitive Personnel Error.Procedures revised.W/960111 Ltr ML18011B0981996-01-0404 January 1996 LER 95-013-00:on 951009,Tech Spec Violation Due to Not Performing off-site Verification.Caused by Cognitive Personnel Error.Individuals counseled.W/960104 Ltr 1999-09-10
[Table view] Category:RO)
MONTHYEARML18017A8671999-09-10010 September 1999 LER 99-007-00:on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With 990910 Ltr ML18016A9801999-06-0404 June 1999 LER 99-006-00:on 981124,failed to Comply with TS 4.0.4 & TS 3/4.6.3, Civ. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Will Be Revised.With 990604 Ltr ML18016A9111999-04-12012 April 1999 LER 99-005-00:on 990313,plant Exceeded ESFAS TS 3.3.2,Action 21.Caused by Inadequate Procedure Rev Preparation.Licensee Revised Applicable Maint Surveillance Test Procedure (MST-10072) to Identify TS Required Actions.With 990412 Ltr ML18016A8971999-04-0808 April 1999 LER 99-004-00:on 990312,unit Trip Was Noted.Caused by Degraded Condition of SG Water Level Flow Control Valve. Replaced Positioners on All Three FW Regulating Valves.With 990408 Ltr ML18016A7971999-02-0505 February 1999 LER 99-001-00:on 990106,SF Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Fasteners Bending Under Specific Circumstances.Increased Water Level.With 990205 Ltr ML18016A7941999-01-29029 January 1999 LER 98-004-01:on 980313,identified Design Deficiency Re Potential Runout of Tdafwp.Caused by Inadequate Original AFW Sys Design.Operability Evaluation Was Completed on 980313 & Addl Engineering Analysis Was Performed by Vendor ML18016A4701998-06-30030 June 1998 LER 97-021-03:on 980210,discovered That SFP Water Level Had Not Been Verified Greater than 23 Feet Above BWR Fuel Assemblies.Caused by Misinterpretation of TS Requirements. Will Submit TS Change Request to Revise TS 3.9.1.11 ML18016A4491998-06-0808 June 1998 LER 98-006-00:on 980508,failure to Perform Insp & Preventive Maint on MCCB as Required by TS Was Noted.Caused by Inadequate Sps.Tested 9 Pressurizer Heater Bank Breakers by Cycling each.W/980608 Ltr ML18022B0551998-05-20020 May 1998 LER 98-005-00:on 980420,TS Verbatim non-compliance Was Determined.Caused by Misinterpretation of TS Requirements. Issued Memo to Reemphasize Need to Comply W/Literal Meaning of TS Requirements in Verbatim manner.W/980520 Ltr ML18016A3441998-03-12012 March 1998 LER 97-021-02:on 980210,identified Failure to Properly Test non-safety Related Pressurizer Porv.Caused by Inadequate Surveillance Test Procedures.Revised Operations Surveillance Test OST-1117 to Include Testing of Subject PORV ML18016A3211998-02-20020 February 1998 LER 98-002-00:on 980121,solid State Protection Sys Testing Deficiency Occurred.Caused by Inadequate Review of Initial Tech Specs.Ts Testing Frequency for P-11 Permissive Revised. W/980217 Ltr ML18016A2201997-10-22022 October 1997 LER 97-021-01:on 970922,discovered That Spent Fuel Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Misinterpretation of TS Requirements.Revised Daily Surveillance Procedures ML18016A2081997-10-14014 October 1997 LER 97-016-01:on 970608,reactor Trip Occurred,Due to Personnel Error While Attempting to Adjust Power Range Nuclear Instrumentation Channel Following Performance of Calorimetric.Procedures revised.W/971014 Ltr ML18016A1931997-09-29029 September 1997 LER 97-022-00:on 970829,TS Required Shutdown Due to Expiration of AFW Lco.Caused by Personnel Error.Completed Repairs TDAFW Pump & Returned Plant to Svc on 970831. W/970926 Ltr ML18012A8641997-08-18018 August 1997 LER 97-019-00:on 970720,turbine Trip/Reactor Trip Occurred. Caused by Three Phase Fault That Collapsed Excitation Field in Main Generator,Resulting in Generator Lockout.Exciter Rotor Assembly Was replaced.W/970818 Ltr ML18012A8581997-08-0808 August 1997 LER 96-018-01:on 960903,manual Reactor Trip Occurred Due to Loss of Normal Sw.Caused by Mechanical Failure of B Water Pump & a Normal SW to Remain Running Once Manually Started.Restored a Normal SW Pump to Svc ML18012A8471997-07-31031 July 1997 LER 97-018-00:on 970701,determined That Plant Procedures Had Not Received Proper Reviews & Approvals.Caused by Failure to Comply W/Plant Administrative Procedure AP-006.Counseled Involved individuals.W/970731 Ltr ML18012A8371997-07-24024 July 1997 LER 97-S01-00:on 970405,unescorted Access Inappropriately Granted to Contract Outage Workers Was Determined.Caused by Personnel Error.Access Files for Individuals Inappropriately Granted Unescorted Access Were Placed on Access Hold ML18012A8291997-07-11011 July 1997 LER 97-017-00:on 970612,failed to Recognize Inoperable Reactor Afd Monitor.Caused by Personnel Error.Operators Involved in Event Will Be Counseled Prior to Assuming Shift duties.W/970711 Ltr ML18012A8241997-07-0202 July 1997 LER 97-015-00:on 970602,inadequate Auxiliary Feedwater Sys Flow Control Valve Surveillance Testing Deficiency Was Identified.Caused by Failure to Recognize Impact on TS 4.7.1.2.1.Readjusted AFW FCV Actuator spring.W/970702 Ltr ML18022B0181997-06-13013 June 1997 LER 97-014-00:on 970514,SI Occurred During Ssps Surveillance Testing.Caused by Inattention to Detail During Recent Rev to Surveillance Test Procedure Being Used.Revised Deficient Surveillance procedures.W/970613 Ltr ML18012A8011997-06-0404 June 1997 LER 97-012-00:on 970505,determined That Previous Auxiliary Control Panel Had Not Verified Operability of Interposing Relays.Caused by Misinterpretation of Tss.Reviewed Other Remote Shutdown Panel Transfer circuitry.W/970604 Ltr ML18012A7751997-05-0505 May 1997 LER 97-008-00:on 970404,safety-related AHU Not Declared Inoperable During Maintenance on Associated Temperature Switches Resulting in Violation of Ts.Caused by Incorrect Interpretation.Operations Night Order issued.W/970505 Ltr ML18022B0151997-04-17017 April 1997 LER 97-006-00:on 970318,breach Was Identified in Thermo-Lag Fire Barrier Wall Due to Inadequate Initial Design,Poor Construction Methods & Incomplete as-built Design.Visual Insp of Thermo-Lag Barrier Walls performed.W/970417 Ltr ML18012A6031997-03-31031 March 1997 LER 97-003-00:on 970227,steam Generator Low Level Protection Circuitry Outside Design Basis Occurred.Caused by Inadequate Failure Modes & Effects Analysis Performed as-built Piping Configuration for S/G Level.Review performed.W/970331 Ltr ML18012A5801997-03-17017 March 1997 LER 97-005-00:on 960320,failure to Perform Core Flux Mapping Following Plant Operation with Reactor Power Greater than 100% Occurred.Cause Was Implemented Containing Inappropriate Guidance for Short Excursions.Change withdrawn.W/970317 Ltr ML18012A5431997-03-0303 March 1997 LER 97-001-00:on 970131,automatic Reactor Tripped Resulting from SG low-low Level.Caused by Inadvertent Closure of Mfiv (1FW-159) & Faulty Hydraulic Relays.Shuttle Valves Replaced, SG Level Discrepancy investigated.W/970303 Ltr ML18012A4661997-01-17017 January 1997 LER 96-025-00:on 961218,determined Missed Surveillance Test on PORV Block Valve 1RC-115.Caused by Personnel Error.Tested 1RC-115 & Counseled Personnel involve.W/970117 Ltr ML18012A4481996-12-23023 December 1996 LER 96-022-00:on 961122,wiring Discrepancy Was Found in Auxiliary Building Ventilation Sys Circuitry.Caused by Personnel Error.Training on This Event Will Also Be Performed for Appropriate maintenance.W/961220 Ltr ML18012A4451996-12-16016 December 1996 LER 96-023-00:on 961114,design Deficiency Was Noted in EDG Protection Circuitry.Caused by Overloading of Diesel Generator in Conjunction W/Reduction of Voltage.Applicable EDG Test Procedures Will Be revised.W/961216 Ltr ML18012A4381996-12-0909 December 1996 LER 96-021-00:on 961107,inadequate post-maint Testing Following Repairs on Containment Isolation Valve 1SP-208 Identified.Caused by Misinterpretation of ASME Code. Procedures revised.W/961209 Ltr ML18012A4321996-11-27027 November 1996 LER 96-013-01:on 961028,condition Outside of Design Basis Where RWST Had Been Aligned W/Nonseismically Qualified Sys Noted.Caused by Failure to Reconcile Operating Procedure Lineups.Administrative Controls established.W/961125 Ltr ML18012A3961996-10-0707 October 1996 LER 96-019-00:on 960906,downed Power Lines & Trees Blocked Plant Access Roads Hampering Site Personnel from Accessing Plant.Caused by Passage of Hurricane Fran.Plant Roads Were Cleared on 960906 & Plant restarted.W/961007 Ltr ML18012A3811996-09-27027 September 1996 LER 96-010-02:on 960628,identified Surveillance Testing Deficiencies That Caused Past Entries Into TS 3.0.3.Caused by Personnel Error.Surveillance Test Procedures OST-1008 & OST-1092 revised.W/960927 Ltr ML18012A3731996-09-18018 September 1996 LER 96-002-12:on 960819,failed to Properly Perform TS Surveillance Testing.Caused by Error That Occurred During Procedure Rev in June 1993.Counseled personnel.W/960918 Ltr ML18012A3541996-09-0606 September 1996 LER 96-014-00:on 891127,identified Condition of Two Charging/Safety Injection Pumps Connected to Same Emergency Electrical Bus.Caused by Failure to Follow Operating Procedures.Racked Out 6.9 Kv breaker.W/960909 Ltr ML18022A9861996-08-26026 August 1996 LER 96-012-00:on 960724,SIII Inverter Was Taken OOS for Repair.Caused by Faulty ferro-resonant Transformer within Inverters Internal Circuitry.Repairs & Load Testing for Siii Were completed.W/960826 Ltr ML18012A3421996-08-0808 August 1996 LER 96-002-11:on 960709,failure to Perform Required Surveillance Testing During Planned Maint in Oct 1994 Identified.Caused by Personnel error.OST-1809 Performed During Refueling Outage 6.W/960808 Ltr ML18012A3151996-07-29029 July 1996 LER 96-002-10:on 960627,failed to Properly Perform TS Surveillance Testing.Caused by Personnel Error.Counseled personnel.W/960729 Ltr ML18012A3131996-07-29029 July 1996 LER 96-010-01:on 960628,surveillance Test Deficiencies Identified in Quarterly RHR Sys.Caused by Inadequate Test Procedures Resulting from Personnel Errors.Scheduled Tests on Administrative Hold & Procedures revised.W/960729 Ltr ML18012A2901996-06-28028 June 1996 LER 96-002-08:on 960529,failed to Perform Tech Spec Surveillance Testing.Caused by Personnel Error.Counseled Personnel,Revised Procedure & Continued in-progress Tech Spec Testing Program review.W/960628 Ltr ML18012A2491996-05-28028 May 1996 LER 96-008-00:on 960425,turbine/trip Reactor Trip Occurred Due to Main Generator Lockout.Caused by Failure of Output Breaker Disconnect.Failed a Phase Disconnect Switch on Breaker 52-7 replaced.W/960528 Ltr ML18012A2131996-04-15015 April 1996 LER 96-005-00:on 960312,failure to Properly Test Containment Bldg Outer Personnel Air Lock Door Occurred.Caused by Personnel Error.Individual Involved Counseled.W/Undated Ltr ML18012A1941996-04-0404 April 1996 LER 96-004-01:on 960205,RWST Level Transmitters Failed & Violation of TS Action Statement Occurred.Caused by Freezing of Level Transmitter Sensing Lines.Frozen Lines Thawed & Missing Insulation replaced.W/960404 Ltr ML18012A1841996-03-25025 March 1996 LER 96-002-02:on 960223,failed to Properly Perform TS Surveillance Testing.Caused by Personnel Error.Counseled Personnel & Revised Appropriate procedures.W/960322 Ltr ML18012A1741996-03-22022 March 1996 LER 95-011-01:on 951105,reactor Trip/Safety Injection Occurred During Solid State Protection Sys Testing Due to Failure of Relay Contact & Unplanned ESF Actuation Occurred During troubleshooting.W/960322 Ltr ML18012A1581996-03-0606 March 1996 LER 96-004-00:on 960205,RWST Level Transmitters Failed High Due to Freezing That Resulted in Entry Into TS LCO 3.0.3 & Subsequent Violation of TS Action Statement.Revised Procedure to Correct steps.W/960306 Ltr ML18011B1001996-01-12012 January 1996 LER 95-014-00:on 940424,RHR Sys Components Removed from Service as Directed During Testing,While Required for Operability.Caused by Procedure Inadequacies.Test Will Be Revised to Correct Procedure by 960215.W/960112 Ltr ML18116A0761996-01-11011 January 1996 LER 95-015-00:on 951213,mod Made to Circuitry for Motor Drive Afps Flow Control Valves.Caused by Cognitive Personnel Error.Procedures revised.W/960111 Ltr ML18011B0981996-01-0404 January 1996 LER 95-013-00:on 951009,Tech Spec Violation Due to Not Performing off-site Verification.Caused by Cognitive Personnel Error.Individuals counseled.W/960104 Ltr 1999-09-10
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEAR05000400/LER-1999-008-01, :on 991008,CR Emergency Filtration Sys Tech Specs Occurred.Caused by Site Personnel Failed to Recognize That Blocking Open CR Emergency Filtration Sys.Procedures Revised.With1999-10-0808 October 1999
- on 991008,CR Emergency Filtration Sys Tech Specs Occurred.Caused by Site Personnel Failed to Recognize That Blocking Open CR Emergency Filtration Sys.Procedures Revised.With
ML18017A8971999-10-0404 October 1999 SER Accepting Licensee Responses to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML18017A9011999-10-0404 October 1999 Safety Evaluation Accepting Rev 99-1 to Harris Nuclear Plant Eals.Changes Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 HNP-99-151, Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML18017A8741999-09-14014 September 1999 Safety Evaluation Supporting Amend 90 to License NPF-63 ML18017A8671999-09-10010 September 1999 LER 99-007-00:on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With 990910 Ltr 05000400/LER-1999-007-02, :on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With1999-09-10010 September 1999
- on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With
ML18017A8621999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With 990908 Ltr HNP-99-137, Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With 05000400/LER-1999-006, :on 981124,noted Failure to Comply with TS 4.0.4 & TS 3/4.6.3, Civs. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Was Revised1999-08-0404 August 1999
- on 981124,noted Failure to Comply with TS 4.0.4 & TS 3/4.6.3, Civs. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Was Revised
HNP-99-126, Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept HNP-99-110, Monthly Operating Rept for June 1999 for Shearon Harris Npp. with1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Shearon Harris Npp. with ML18016A9941999-06-18018 June 1999 SER Authorizing Licensee Relief Request 2RG-008,pursuant to 10CFR50.55a(a)(3)(ii) for Second 10-year Interval of Shearon Harris Nuclear Power Plant ISI Program ML18016A9801999-06-0404 June 1999 LER 99-006-00:on 981124,failed to Comply with TS 4.0.4 & TS 3/4.6.3, Civ. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Will Be Revised.With 990604 Ltr HNP-99-099, Monthly Operating Rept for May 1999 for Shearon Harris Nuclear Plant,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Shearon Harris Nuclear Plant,Unit 1.With ML18017A8981999-05-12012 May 1999 Technical Rept Entitled, Harris Nuclear Plant-Bacteria Detection in Water from C&D Spent Fuel Pool Cooling Lines. HNP-99-089, Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected 05000400/LER-1999-005, :on 990313,plant Exceeded ESFAS TS 3.3.2,Action 21.Caused by Inadequate Procedure Rev Preparation.Licensee Revised Applicable Maint Surveillance Test Procedure (MST-10072) to Identify TS Required Actions.With1999-04-12012 April 1999
- on 990313,plant Exceeded ESFAS TS 3.3.2,Action 21.Caused by Inadequate Procedure Rev Preparation.Licensee Revised Applicable Maint Surveillance Test Procedure (MST-10072) to Identify TS Required Actions.With
ML18016A9111999-04-12012 April 1999 LER 99-005-00:on 990313,plant Exceeded ESFAS TS 3.3.2,Action 21.Caused by Inadequate Procedure Rev Preparation.Licensee Revised Applicable Maint Surveillance Test Procedure (MST-10072) to Identify TS Required Actions.With 990412 Ltr 05000400/LER-1999-004, :on 990312,unit Trip Was Noted.Caused by Degraded Condition of SG Water Level Flow Control Valve. Replaced Positioners on All Three FW Regulating Valves.With1999-04-0808 April 1999
- on 990312,unit Trip Was Noted.Caused by Degraded Condition of SG Water Level Flow Control Valve. Replaced Positioners on All Three FW Regulating Valves.With
ML18016A9001999-04-0808 April 1999 Safety Evaluation Supporting Amend 88 to License NPF-63 ML18016A8971999-04-0808 April 1999 LER 99-004-00:on 990312,unit Trip Was Noted.Caused by Degraded Condition of SG Water Level Flow Control Valve. Replaced Positioners on All Three FW Regulating Valves.With 990408 Ltr ML18016A8941999-04-0505 April 1999 Revised Pages 20-25 to App 4A of non-proprietary Version of Rev 3 to HI-971760 HNP-99-066, Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With ML18016A8661999-03-31031 March 1999 Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept. ML18016A9101999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr ML18016A8551999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with 990312 Ltr ML18017A8931999-02-28028 February 1999 Risks & Alternative Options Associated with Spent Fuel Storage at Shearon Harris Nuclear Power Plant HNP-99-047, Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with 05000400/LER-1999-003, :on 990123,noted That Plant Was Outside Design Basis Due to Isolation of Fire Protection Containment Sprinkler Sys.Caused by Human Error.Restored Containment Sprinkler Sys to Operable Status.With1999-02-22022 February 1999
- on 990123,noted That Plant Was Outside Design Basis Due to Isolation of Fire Protection Containment Sprinkler Sys.Caused by Human Error.Restored Containment Sprinkler Sys to Operable Status.With
ML18016A8531999-02-18018 February 1999 Non-proprietary Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFP C & D 05000400/LER-1999-002, :on 990114,RT Due to Not Removing Temporary Device from Relay Following Calibration Was Noted.Caused by Human Error.Counseled Personnel Involved in Event.With1999-02-12012 February 1999
- on 990114,RT Due to Not Removing Temporary Device from Relay Following Calibration Was Noted.Caused by Human Error.Counseled Personnel Involved in Event.With
05000400/LER-1999-001, :on 990106,SF Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Fasteners Bending Under Specific Circumstances.Increased Water Level.With1999-02-0505 February 1999
- on 990106,SF Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Fasteners Bending Under Specific Circumstances.Increased Water Level.With
ML18016A7971999-02-0505 February 1999 LER 99-001-00:on 990106,SF Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Fasteners Bending Under Specific Circumstances.Increased Water Level.With 990205 Ltr ML18022B0631999-02-0404 February 1999 Rev 0 to Nuclear NDE Manual. with 28 Oversize Uncodable Drawings of Alternative Plan Scope & 4 Oversize Codable Drawings ML20202J1161999-02-0101 February 1999 SER Accepting Relief Requests Associated with Second 10-year Interval Inservice Testing Program HNP-99-020, Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With1999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With ML18016A7941999-01-29029 January 1999 LER 98-004-01:on 980313,identified Design Deficiency Re Potential Runout of Tdafwp.Caused by Inadequate Original AFW Sys Design.Operability Evaluation Was Completed on 980313 & Addl Engineering Analysis Was Performed by Vendor 05000400/LER-1998-004, :on 980313,identified Design Deficiency Re Potential Runout of Tdafwp.Caused by Inadequate Original AFW Sys Design.Operability Evaluation Was Completed on 980313 & Addl Engineering Analysis Was Performed by Vendor1999-01-29029 January 1999
- on 980313,identified Design Deficiency Re Potential Runout of Tdafwp.Caused by Inadequate Original AFW Sys Design.Operability Evaluation Was Completed on 980313 & Addl Engineering Analysis Was Performed by Vendor
HNP-99-003, Monthly Operating Rept for Dec 1998 for Shearon Harris Npp. with1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Shearon Harris Npp. with HNP-98-181, Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With ML18016A8351998-11-28028 November 1998 ISI Summary 8th Refueling Outage for Shearon Harris Power Plant,Unit 1. HNP-99-086, Changes,Tests & Experiments, for Harris Nuclear Plant.Rept Provides Brief Description of Changes to Facility & Summary & of SE for Each Item That Was Implemented Under 10CFR50.59 Between 970608-981128.With1998-11-28028 November 1998 Changes,Tests & Experiments, for Harris Nuclear Plant.Rept Provides Brief Description of Changes to Facility & Summary & of SE for Each Item That Was Implemented Under 10CFR50.59 Between 970608-981128.With ML18016A7411998-11-25025 November 1998 Rev 1 to Shnpp Cycle 9 Colr 05000400/LER-1998-007, :on 981023,turbine Control Anomaly Caused Manual Rt.Caused by Failure to Incorporate Verbal Vendor Guidance in Operating Procedures.Addl Vendor Guidance Will Be Verified & Added to Procedures.With1998-11-17017 November 1998
- on 981023,turbine Control Anomaly Caused Manual Rt.Caused by Failure to Incorporate Verbal Vendor Guidance in Operating Procedures.Addl Vendor Guidance Will Be Verified & Added to Procedures.With
ML18016A7181998-11-0606 November 1998 SER Approving Alternative Method to ASME Code in Regards to Surface Exam of Weld Repairs for Canopy Seals for Shearon Harris Nuclear Power Plant,Unit 1 ML18016A6721998-11-0404 November 1998 Safety Evaluation Authorizing Relief for Requests 2RG-009 & 2R1-010,per 10CFR50.55a(a)(3)(i) 1999-09-30
[Table view] |