Kewaunee, Withdrawal of License Amendment Request 234, Request for Review and Approval of Methodology Change Regarding Auxiliary Building Crane Upgrade.
ML081050011
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 04/11/2008
From: Bischof G T
Dominion Energy Kewaunee
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
07-0465A
Download: ML081050011 (3)


Text

Dominion Energy Kewaunee, Inc.'l(l()O[lolllinion Boulevard, Glen Allen, VA 2.)()()(I April 11, 2008 ATTN: Document Control Desk U.S.Nuclear Regulatory Commission Washington, DC 20555-0001 1_-Dominion'Serial No.07-0465A L1C/GR/RO Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION WITHDRAWAL OF LICENSE AMENDMENT REQUEST 234,"REQUEST FOR REVIEW AND APPROVAL OF METHODOLOGY CHANGE REGARDING AUXILIARY BUILDING CRANE UPGRADE" Pursuant to 10 CFR 50.90, DominionEnergyKewaunee, Inc.(DEK)requested Nuclear Regulatory Commission (NRC)approval of a proposed license amendment request (LAR)for the Kewaunee Power Station (KPS)(reference 1).The proposed amendment would allow the use of a methodology not currently approved for use at KPS for performing the seismic qualification analysis of the auxiliary building crane.Subsequently, DEK met with the NRC staff (reference 2)to discuss issues related to the application.

The NRC staff had questions regarding the analysis and the application of the proposed new method to the KPS auxiliary building crane.The specific questions from the staff are detailed in enclosure 3 of reference 2.DEK committed at the meeting to provide responses to the NRC staff questions in a separate correspondence, which was to be submitted formally to the NRC as part of the license amendment acceptance review.In conjunction with developing responses to the NRC staff's questions, DEK enlisted the services of an independent consultant to review the submittal.

Based on insights gained by this independent review, DEK has reconsidered use of the proposed methodology and now intends to re-perform the analysis using a different methodology and submit a new LAR.Therefore, DEK hereby withdraws its request for NRC review of KPS LAR 234.DEK is currently preparing a new seismic analysis of the auxiliary building crane and will submit a new LAR to the NRC requesting review and approval of the new analysis.

Serial No.07-0465A Page 2 of 3 If you have any questions or require any additional information, please contact Mr.Gerald Riste at (920)388-8424.

Vice President-Nuclear Engineering Commitments made by this letter: NONE

References:

1.Letter from Gerald T.Bischof (DEK)to Document Control Desk (NRC), License Amendment Request 234-Request for Review and Approval of Methodology Change Regarding Auxiliary Building Crane Upgrade, dated November 9, 2007 (ADAMS Accession No.ML073180499).

2.Letter from P.D.Milano (NRC)to DEK,"Summary of January 7,2008 Meeting with Dominion Energy Kewaunee Inc.on the License Amendment Request Regarding Seismic Methodology for Analysis of Auxiliary Building Crane (TAC No.MD7301)," dated January 25, 2008 (ADAMS Accession No.ML080230447).

cc: Regional Administrator, Region III U.S.Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Ms.M.H.Chernoff Project Manager U.S.Nuclear Regulatory Commission Mail Stop OWFN 0-8-H-4a 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Kewaunee Power Station Public Service Commission of Wisconsin Electric Division P.O.Box 7854 Madison, WI 53707 Serial No.07-0465A Page 3 of 3