Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20140H926 | 20 July 1984 | Forwards Press Release 84-90 Re NRC Proposed Civil Penalty in Amount of $120,000 Against TVA for Failure to Identify & Correct Conditions Adverse to Quality During post-trip Shutdown reviews,post-mod Testing & Monthly Surveillance | |
ML20140H931 | 20 July 1984 | Forwards Press Release 84-91 Re NRC Proposed Civil Penalty in Amount of $150,000 Against Util for Failure to Identify Two Auxiliary Feedwater Pumps Out of Operation & Failure to Take Compensatory Action | |
ML20140H945 | 31 July 1984 | Forwards Press Release 84-94 Re NRC Proposed Imposition of Civil Penalty in Amount of $40,000 Against Util for Allegedly Assuming That All Hydraulic Snubbers Rebuilt During Steam Generator Replacement Projects | Earthquake |
ML20140H956 | 11 September 1984 | Forwards Press Release 84-109 Re NRC Mitigation of Proposed Civil Penalty in Amount of $30,000 Against Util for Alleged Violation of NRC Radiation Protection Requirements Due to Prompt Reporting | High Radiation Area |
ML20140H962 | 25 September 1984 | Forwards Press Release 84-113 Re NRC Reduction in Proposed Civil Penalty in Amount of $250,000 by 50% Due to Prompt & Extensive Corrective Action by Util.Containment Spray Sys Subsystem Inoperable on 840304-17 | |
ML20140H972 | 25 September 1984 | Responds to Request for All Errors Committed by Util in Application for License.Partial List of False Matl Statements Should Be Available | |
ML20140J001 | 28 September 1984 | Forwards Press Release 84-115 Re NRC Proposed Fine Against Util for Apparent Violation of NRC Regulations | |
ML20140J009 | 28 November 1984 | Forwards Press Release 84-134 Re NRC Proposed Fine Against Util for Five Alleged Violations,Including Inadvertent Shutdown of Control Room Emergency Ventilation Sys | |
ML20140J045 | 3 December 1984 | Forwards Press Release 84-52 Re NRC Proposed Fine Against Util for Alleged Safety Violations,Including Failure to Follow Approved Procedures During Operation of Startup Feedwater Pump | |
ML20140J077 | 3 December 1984 | Forwards Press Release 84-51 Re NRC Proposed Fine Against Util for Violations of Safety Requirements,Including Improper Control Valve Setting on Auxiliary Feedwater Pump | |
ML20140J162 | 19 December 1984 | Forwards Press Release 84-150 of NRC Proposed Fine Against Util for Alleged Inadequate Control of Operations | |
ML20140J206 | 6 December 1984 | Forwards Press Release 84-140 of NRC Proposed Civil Penalty in Amount of $50,000 Against Util for Alleged Violations of Security Requirements by Not Protecting Equipment Per Physical Security Plan | |
ML20140J267 | 21 February 1985 | Forwards Press Release 85-28 Re NRC Proposed Civil Penalty in Amount of $50,000 Against Util for Alleged Noncompliance W/Requirements Concerning Upper Head Injection Accumulator Sys | Fuel cladding |
ML20140J271 | 14 February 1985 | Forwards Press Release 85-22 Re NRC Proposed Fine Against Util for Several Alleged Violations of Regulations Concerning Failure to Conduct Surveillance Tests for Unit Batteries | |
ML20140J282 | 5 February 1985 | Forwards Press Release 85-17 Re NRC Proposed Civil Penalty in Amount of $40,000 Against Util for Alleged Violations of Requirements Concerning Failure to Assure Operability of Reactor Vessel Vent Sys | |
ML20140J350 | 29 January 1985 | Forwards Press Release 85-13 Re NRC Proposed Civil Penalty in Amount of $100,000 Against Util as Result of 840814 Incident Concerning Overpressurization of Safety Sys | |
ML20141G937 | 31 December 1984 | Forwards Notice of Proposed Rulemaking to Be Published in Fr.Amends to 10CFR50.47 & 10CFR50,App E Would Explicitly Incorporate Interpretations in Commission San Onofre & Diablo Canyon Rulings | Earthquake |
ML20141H108 | 9 July 1985 | Forwards Responses to 850610 Questions Re Diablo Canyon OL Proceeding.Responses Delayed Due to Press of Other Business | Operating Basis Earthquake Earthquake |
ML20148E096 | 29 February 1988 | Forwards Quarterly Rept Covering Fourth Quarter of 1987,in Response to House Rept 97-850 | |
ML20149H190 | 2 November 1984 | Forwards NRC & Ofc of Investigations (OI) Responses to Questions Raised in H Myers 840604 Memo to N Haller & OI 840913 Responses | |
ML20151D392 | 6 April 1988 | Provides Listed Info Requested in Re Operating Nuclear Power Units Located at Twelve Sites Along Great Lakes | |
ML20195G668 | 10 June 1988 | Provides Info in Response to Rl Spaulding Re Problems Associated W/Full Power Operation Authorization & Plant Shutdown.Plants Must Demonstrate Satisfactory Solutions to Issues Before Restart or Full Power Operation | |
ML20195G852 | 10 November 1988 | Forwards Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Jul-Sept 1988.Inability of Commission to Forecast Licensing Schedule for Shoreham & Seabrook Noted | |
ML20195J661 | 20 January 1988 | Responds to Concerns Raised in Re Stainless Steel Matl Designated as E-Brite 26-1.Actions Taken to Address Allegation That E-Brite 26-1 Unsuitable for Use in Nuclear Power Plants Listed | |
ML20196G969 | 29 February 1988 | Forwards 34th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Oct-Dec 1987. Commission Unable to Forecast Licensing Schedule for Shoreham & Seabrook Because of Unresolved Issues | |
ML20204F936 | 30 July 1986 | Responds to from R Blank,Addressing Concerns Re Safety of Older Nuclear Plants,Per SO Conte 860701 Request | Systematic Assessment of Licensee Performance Chernobyl |
ML20206Q132 | 20 August 1986 | Submits Interim Response to Re Alleged Falsification of Welding Certificates for Welders at Plants Employed by Powerplant Specialists,Inc | |
ML20207A206 | 17 April 1987 | Responds to Request for Rept Re Legal & Institutional Aspects Under NRC Jurisdiction on Possible Conversion of Unit 1 to Defense Matls Production Reactor.Cp Still in Effect.Util Plans to Mothball Reactor by June 1988 | |
ML20207G221 | 15 August 1988 | Responds to Requesting Response to P Birnie Re Event at LaSalle Involving Recirculation Pump. NRC Response to P Birnie Identical to Ltr Addressed to Recipient | |
ML20209B287 | 26 February 1982 | Forwards NRC 16th Monthly Status Rept for 820115-0215, Discussing Actions Taken on Operating Reactors & Licensing Reviews of New Facilities,Per House Rept 96-1093.Licensing Schedules for Perding OL & Cp/Ml Applications Encl | |
ML20209E629 | 26 August 1986 | Responds to 860731 Request to Be Kept Informed of Proceedings Re Facilities | |
ML20210N216 | 25 September 1986 | Discusses Governor Celeste Opposing Full Power Operations of Plants.Order Bars Commission from Voting Until Further Order by Us Court of Appeals.Served on 860930 | Chernobyl |
ML20211C600 | 30 December 1981 | Forwards Fourteenth Monthly Status Rept for 811115-811215, Discussing Actions Taken on Operating Reactors & Licensing Reviews of New Facilities.Aslb Issued 811214 Partial Initial Decision Re TMI-1 Design,Procedures & Emergency Planning | |
ML20213C850 | 24 April 1986 | Marked-up Ack of Transmitting Correspondence from Constituent,Zv Reytblatt.Nrc Currently Defending Lawsuit Bought by Reytblatt Re Matters Raised in Ltr to Senator Dixon.Nrc Instructed Not to Respond to Communication | |
ML20213D430 | 23 May 1977 | Advises That Investigation Initiated by Region 3 on 770426 Has Not Yet Been Completed | |
ML20214J526 | 15 May 1987 | Responds to Recipient Expressing Support for NRC Shut Down of Peach Bottom Atomic Power Station & Concern Re Emergency Planning Issues at Seabrook.Commission Unable to Comment on Issues Before Commission or Adjudicatory Boards | |
ML20214P840 | 15 May 1987 | Responds to Rj Mrazek Re Util Request to Operate Facility at 25% Power.Commission Will Not Make Decision on Merits of Request Until All Parties Have Opportunity to Have Views Considered | |
ML20214T453 | 3 October 1984 | Forwards Transcripts of Commission 840725,30 & 0803 Deliberations Re Issuance of Full Power License for Plant. Issue of Need to Consider Effects of Earthquakes on Emergency Planning Discussed in Closed Meetings.W/O Encl | Earthquake |
ML20215H943 | 5 June 1987 | Advises That Review of B&W Designed Nuclear Power Plants Will Not Satisfactorily Address Safety Issues Associated W/ B&W Design.Supports Efforts to Create Independent Safety Review Board | |
ML20215K477 | 3 November 1976 | Responds to 761012 Request for Info Re Fallout from 760926 Nuclear Explosion by Peoples Republic of China.On 761003, Util Informed Region I of Low Level Contamination Around Reactor Bldg.Samples Indicated Plant Not Source | |
ML20215K514 | 19 March 1982 | Ack Receipt of 820212 Request That Limited Appearance Sessions Be Held in New York City.Aslb Proposes to Hold at Least One Set of Hearings.Recommendation for Date,Time & Place Requested | |
ML20215K533 | 17 August 1982 | Ack Receipt of Re Ongoing Facilities Proceeding. Commission Must Decide Adjudication Solely on Bases of Submissions of Parties & Evaluations of Submissions | |
ML20215K598 | 10 June 1987 | Responds to 870508 Request for Testimony at 870514 Hearing on External Influence on NRC Adjudicatory Procedures in Shoreham Proceeding.Index of Pertinent Documents Encl | |
ML20215L205 | 16 June 1986 | Responds to to NRC Requesting That FEMA Conduct Public Meeting Re FEMA Assessment of 861213 Emergency Planning Exercise.Commission Addressed Similar Response in 860606 Memorandum & Order | |
ML20234A922 | 7 May 1964 | Advises That to Chairman Seaborg Enclosing D Vera & Bj Badger Ltrs Concerning Nuclear Power Reactor Proposed for Const at Bodega Bay Made Part of Public Record | |
ML20234A944 | 4 September 1963 | Refers to Re Mail Questioning Suitability of Bodega Head as Nuclear Power Site on Grounds Other than Health & Safety.Issues Not within Commission Jurisdiction & Will Not Be Addressed at Public Hearing | |
ML20234B023 | 13 July 1959 | Responds to to Chairman Mccone Re Application for Nuclear Facility at Bodega Head,Ca.Application Filed for Facility at Humboldt Bay.Any Facility Proposed for Site W/ History of Earthquakes Will Be Examined Thoroughly | Earthquake |
ML20234B200 | 18 April 1963 | Repsponds to Forwarding G Buicks Expressing Concern Re Proposed Nuclear Power Plant at Bodega Head.Before CP Issued,Div of Licensing & Regulation Will Thoroughly Review Application | |
ML20234B353 | 15 June 1964 | Forwards Author to PG&E in Response to Re Bodega Bay.All Aspects of Proposal Re Safety Will Be Considered.W/O Encl | |
ML20234B449 | 15 April 1963 | Responds to Forwarding W Sattler Re Safety at Proposed Nuclear Reactor at Bodega Bay,Ca. Before AEC Issues Cp,Div of Licensing & Regulation Will Make Comprehensive Safety Evaluation |