Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19257A637 | 14 December 1979 | Responds to Aslab 791205 Order Scheduling 800103 Oral Argument.Jn Christman Will Be Representing Applicant | |
ML19260C077 | 27 November 1979 | Requests That All Facility Correspondence Be Forwarded to New Address in Boulder,Co | |
ML19261E386 | 31 May 1979 | Forwards Util Supplementary Testimony in Response to NRC Testimony Re Svc Water Pumphouse Settlement.Rb Beck 760116 Ltr to s Ragone & Prof Qualifications of WR Cartwright Encl | |
ML19262C667 | 8 February 1980 | Forwards Endorsements 20 & 43 to Nelia Policies MF-96 & MF-57,respectively | |
ML19262C680 | 11 February 1980 | Forwards Endorsement 4 to Binders XB-63 & Endorsement 3 to Binders XB-27 & XB-28 | |
ML19263B945 | 22 January 1979 | Forwards Endorsement 21 to Policy NF-240 & Endorsement 3 to Binder EB-63 for Calendar Year 1979 | |
ML19270G146 | 27 April 1979 | Forwards Util Testimony & Exhibits to Be Presented as Evidence at Public Hearing During Week of 790618.W/o Encl | Turbine Missile |
ML19274E873 | 30 March 1979 | Forwards 790327 Util Rept Re Cracked Splitter Plate at Facility | Turbine Missile |
ML19290B812 | 15 November 1979 | Confirms 791108 Ltr Re VEPCO Rept on Analytical Errors in Pipe Stress Analyses.Rept Will Be Submitted by 791210 | |
ML19290B820 | 5 December 1979 | Responds to ASLAP 791108 Request.Forwards Rept on Effect of Outdated Amplified Response Spectrum Curves on Svc Water Pumphouse Settlement, Which Details Errors in Stress Analysis | |
ML19305C329 | 22 February 1980 | Confirms 800221 Telcon W/Cj Bishop,Advising That Jm Schmerling Affidavit Contains Aspects Claimed to Be Proprietary by Westinghouse.Requests Confidentiality of Affidavit Until Claim Is Supported by Westinghouse | Turbine Missile |
ML19309C294 | 4 March 1980 | Requests All Matl Sent to Aslab Re D Swanson 800225 Ltr Forwarding NRC Statement on Turbine Disc Cracking & Continued Operation,Be Sent to Ucs.Matl Is Relevant to Ucs Amicus Curiae Issue | |
ML19309C512 | 12 March 1980 | Advises That VEPCO Will Install Device to Detect Pinhole Leaks from Expansion Joints,Per Aslab Opinion ALAB-578,Pages 64-66.Plans to Install Rubber Jacket Around Joints to Solve Technical Problems | |
ML19318A078 | 9 June 1980 | Recommends That Aslab Composition Be Changed to Remove Imbalance Between Lawyer & Technical Members & That Unnecessary Legalistic Burdens,Procedures & Requirements Be Eliminated | |
ML19318A903 | 20 June 1980 | Advises of Change in Info in 800324 Ltr.Westinghouse Exit Energy & Probability Analyses Will Not Be Ready Until Oct 1980.S&W Analyses Will Require Six Addl Wks.Crack Size Tables Withheld (Ref 10CFR2.790) | Turbine Missile |
ML19340C330 | 6 November 1980 | Forwards S&W Summary Rept on Turbine Missile Damage Probability Analysis Prepared for VEPCO.Long-term Measures Re Turbine Disk Cracking Will Be Submitted When Prepared | Turbine Missile |
ML19341A356 | 14 January 1981 | Forwards Turbine Missile Rept (HP296-LP281-LP281), Per NRC Request.Rept Section of Info Package to Be Submitted Per 801106 Ltr.Related Correspondence | Turbine Missile |
ML19341D666 | 31 March 1981 | Advises That Westinghouse Final Word on Recommended Insp Interval for Facility Still Incomplete.Will Inform of Recommendations or of Further Delay by 810421.Related Correspondence | Turbine Missile |
ML19344D643 | 24 March 1980 | Forwards Jm Schmerling 800320 Affidavit & Five Other Documents Re Technical Info on Turbine Disc Cracking in Response to Aslab 800303 Memorandum & Order.Vepco Revised Written Testimony May Be Ready in mid-Oct.W/o Encl | Turbine Missile |
ML19346A041 | 29 May 1981 | Discusses Turbine Missile Evidence Re Disk 1 Containment in Event of Turbine Casing Burst.Westinghouse Topical Repts W/ Conclusions to Be Submitted by 810615.Related Correspondence | Turbine Missile |
ML19350C783 | 20 March 1981 | Responds to Treby 810309 Ltr Re Recommendation That Turbine Disks Be Ultrasonically Inspected.Util Does Not Object to Insp But Requests Flexibility If Order Issued.Related Correspondence | Turbine Missile |
ML19351C995 | 2 October 1980 | Forwards Endorsement I to Maelu Binder XB-70 | |
ML20003G681 | 21 April 1981 | Informs of Westinghouse Recalculations of Recommended Insp Intervals for Unit 1 Turbine Using Current Methods. Related Correspondence | Turbine Missile |
ML20005A343 | 19 June 1981 | Updates 810529 Ltr Re Turbine Missile Analysis.Westinghouse Submitted Two Topical Repts to Util on 810611.Final Version of Westinghouse Memo Re Turbine Disc Insp Will Be Forwarded to NRC About 810702.Related Correspondence | Turbine Missile |
ML20008G122 | 8 May 1981 | Informs of Progress Re Util Efforts to Provide Final Analysis of Turbine Missile Risk.Util Cannot Finish Study Until Nrc/Westinghouse Discussions Completed.Further Developments Expected by 810531.Related Correspondence | Turbine Missile |
ML20009H084 | 31 July 1981 | Provides Westinghouse Recommendations for Turbine Insp Intervals for Unit 1.Recommendations for Unit 2 Incomplete. Computer Printouts Will Be Provided.Certificate of Svc Encl.Related Correspondence | Turbine Missile |
ML20027E663 | 8 November 1982 | Forwards CA Lewis,R Brager,Vs Albrecht,Ch Buckley & Jm Coleman Notices of Appearance.Certificate of Svc Encl | |
ML20027E699 | 8 November 1982 | Forwards Jm Coleman,Ca Lewis,R Brager,Vs Albrecht & Ch Buckley Notices of Appearance in Proceeding.Certificate of Svc Encl | |
ML20028E143 | 17 January 1983 | Forwards Board of Supervisors of County of Louisa, VA Contentions | |
ML20028E157 | 17 January 1983 | Forwards Board of Supervisors of County of Louisa, VA Contentions | |
ML20039G488 | 12 January 1982 | Forwards Endorsements 36 & 37 to Nelia Policy NF-240 & Annual Premium Endorsements to Binders EB-63,EB-70,XB-70 & XB-63 | |
ML20040C023 | 18 November 1981 | Forwards Endorsement 31 to Nelia Policy NF-240 | |
ML20052F541 | 10 May 1982 | Forwards Endorsements 51,67,39 & 29 to Maelu Policy MF-57, Nelia Policies NF-186 & NF-240 & Maelu Policy MF-96, Respectively | |
ML20063E108 | 25 August 1982 | Confirms 820820 Telcon Re Louisa County Board of Supervisors Intention to Intervene in Util 820713 Proceedings to Amend OL to Permit Receipt & Storage of Spent Fuel Assemblies | |
ML20064C901 | 16 October 1978 | Forwards Ucs Brief Filed W/Aslab Re Instance Where WASH-1400 Used in Licensing & Regulatory Process | |
ML20065T459 | 21 October 1982 | Forwards Util Application for Amend to Certificate of Public Convenience & Necessity,ET-117g,State of VA 820119 Order Requiring Notice & Scheduling Hearing & 820323 Amendatory Order.W/One Oversize Drawing.Aperture Card in PDR | |
ML20067C527 | 7 December 1982 | Objects to 830117 Deadline for Submittal of Contentions. Deadline Hampers Identification of Valid Contentions & Increases Likelihood of Burdening Proceeding Due to Submittal of Unreviewed Contentions | |
ML20071K914 | 26 July 1982 | Forwards Endorsement 40 to Nelia Policy NF-240 & Endorsement 30 to Maelu Policy MF-96 | |
ML20073D685 | 11 April 1983 | Forwards Attachment 4 to Application for OL Amend.Document Withheld from 830301 Transmittal Since Document Contained Safeguards Info.Util Decided Document Need Not Be Treated as Containing Safeguards Info.Related Correspondence.W/O Encl | |
ML20073J761 | 15 April 1983 | Advises of Intent Not to File Reply to Submissions of Other Parties in Response to ASLB 830216 Inquiries.Certificate of Svc Encl | |
ML20076B149 | 30 April 1979 | Forwards Second Copy of Util'S Testimony Re Probability of Generating Turbine Missiles & Turbine Overspeed Protection Sys.W/O Encl | Turbine Missile |
ML20078K696 | 13 October 1983 | Updates Status of Full Core Reserve at Facility.Full Core Reserve Will Be Lost During Outage Scheduled for Early 1986 If Fuel Performs Properly During Future Operating Cycles | |
ML20079N954 | 1 March 1983 | Forwards Util to NRC W/Attachments Constituting Util Application to Transfer Spent Fuel from Surry. Attachment 4 Requires Special Treatment & Will Be Sent Separately.W/O Encl.Related Correspondence | |
ML20079N961 | 1 March 1983 | Forwards Util W/Attachments Constituting Util Application to Expand Spent Fuel Pool.Util 821021 Encl Ltr Corrects Info in Application.W/O Encl.Related Correspondence | |
ML20080G375 | 16 September 1983 | Requests Oral Argument on Motion for Directed Certification Be Scheduled After 831006 | |
ML20081A523 | 20 October 1983 | Summarizes 831012 Meeting W/Nrc,Util & Louisa County Re Louisa County Contentions.Mutually Agreeable Proceeding Schedule Recommended Following Publication of Environ Analysis & Ser.Related Correspondence | |
ML20084C952 | 27 April 1984 | Forwards Notice of Withdrawal of County of Louisa & Board of Supervisors.W/O Encls.Related Correspondence | |
ML20084F387 | 1 May 1984 | Forwards 840426 Settlement Agreement Between County of Louisa,Va & Util.County of Louisa Filed Notice of Withdrawal from Proceedings Per Paragraph 5 of Agreement.Related Correspondence | |
ML20086A607 | 8 November 1983 | Informs That Jn Christman Should Be Removed from Mailing List | |
ML20093N256 | 30 July 1984 | Informs That Util & NRC Intend to File Response to Objectionable Contentions by 840817,based on Discussions W/ Parties |