ML20076B149
ML20076B149 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 04/30/1979 |
From: | Christman J HUNTON & WILLIAMS |
To: | Buck J, Mike Farrar, Rosenthal A Atomic Safety and Licensing Board Panel |
References | |
V-8-50-20-29-15, NUDOCS 7905240814 | |
Download: ML20076B149 (2) | |
Similar Documents at North Anna | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K4391999-10-18018 October 1999
[Table view]Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl ML20209E3711999-07-0202 July 1999 Forwards Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.Violations Being Treated as Noncited Violations ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML20196G2581999-06-23023 June 1999 Discusses Closure of GL 92-01,rev 1,suppl 1,reactor Vessel Structural Integrity ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20196G2211999-06-21021 June 1999 Forwards Licensee Sampling & Testing Obligations Re Vpdes Permit VA0052451 Reissuance Application.Details of Requests for Sampling & Testing Waivers,Included ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML20195J1391999-06-11011 June 1999 Submits Addl Info as Addendum to Original Application Which Proposed Use of Three Chemicals in Bearing Cooling Tower at North Anna Power Station,Per Reissuance of Vpdes Permit ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML20195C6601999-06-0101 June 1999 Forwards Response to NRC 990216 RAI Re Summary Rept of USI A-46 Program ML20207C9851999-05-28028 May 1999 Requests Regrading of Rt Robinson 990408 Written Exam,Based on Listed Reasons.Answer C for Question 18 Is Requested to Be Reconsidered as Correct or Question Be Deleted ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML20206U7441999-05-20020 May 1999 Informs That NRC Unable to Conclude That NAPS Has Met Intent of Supplement 4 to GL 88-20.RAI Re Fire Area of IPEEE Encl. Response Requested within 90 Days of Submittal Date ML20207A8541999-05-20020 May 1999 Forwards RAI Re Licensee Listed Responses to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Response Requested within 90 Days of Submittal Date ML20195B5381999-05-14014 May 1999 Forwards Rev 8,Change 2 to North Anna Units 1 & 2 IST Programs for Pumps & Valves. Summaries of Program Changes Provided for Each Unit IST Program.Relief Requests Have Been Removed from IST Programs ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML20206L4661999-05-10010 May 1999 Forwards SE Accepting Request to Delay Submitting Plant, Unit 1 Class Piping ISI Program for Third Insp Interval Until 010430,to Permit Development of Risk Informed ISI Program for Class 1 Piping 1999-09-08 Category:INCOMING CORRESPONDENCE MONTHYEARML20217K4391999-10-18018 October 1999
[Table view]Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML20195C6601999-06-0101 June 1999 Forwards Response to NRC 990216 RAI Re Summary Rept of USI A-46 Program ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML20207C9851999-05-28028 May 1999 Requests Regrading of Rt Robinson 990408 Written Exam,Based on Listed Reasons.Answer C for Question 18 Is Requested to Be Reconsidered as Correct or Question Be Deleted ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML20195B5381999-05-14014 May 1999 Forwards Rev 8,Change 2 to North Anna Units 1 & 2 IST Programs for Pumps & Valves. Summaries of Program Changes Provided for Each Unit IST Program.Relief Requests Have Been Removed from IST Programs ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML20206H0221999-05-0303 May 1999 Informs That Licensee Changes Bases for TS 3/4.6.1.2, Containment Leakage. Changes Allow Use of Other NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing.Ts Bases Page,Encl ML20206G9481999-05-0303 May 1999 Informs NRC That Insp of 58 Accessible safety-related Pipe Supports Completed in Response to NOV from Insp Rept 50-338/98-05 & 50-339/98-05.Commitments Made Include Plans to Perform Assessment of Welding & Welding Insp ML20205T1181999-04-16016 April 1999 Requests NRC Approval Prior to Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit.Nrc Concurrence with Irradiation Program Requested by End of June 1999 ML20205P1891999-04-0808 April 1999 Forwards ISI Program for Third ten-yr ISI Interval for North Anna Unit 1 for Class 1,2 & 3 Components & Component Support.Third ten-yr Insp Interval for North Anna Unit 1 Begins on 990501.Page 2-26 of Encl Not Included ML20205K3631999-04-0505 April 1999 Requests That Relief Request IWE-3 Be Removed from 980804 Relief Requests Submitted to Nrc.Subject Relief Request Was Inadvertently Retained in Attachment 1 for Unit 1 ML20205K2191999-04-0101 April 1999 Forwards Response to NRC 990106 RAI Re Util Summary Rept on USI A-46 Program,Submitted 970527.Calculations & Corrected Table 11.1-1,encl ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML20204H0331999-03-17017 March 1999 Forwards Rev 5 to PSP for Surry & North Anna Power Stations & Associated Isfsis.Description & Justification for Changes Included with Plan Rev.Rev 5 to PSP Withheld Per 10CFR73.21 ML20205E2701999-02-25025 February 1999 Forwards Rept on Status of Decommissioning Funding for North Anna Power Station,Units 1 & 2.Trust Agreement Between Old Dominion & Bankers Trust Co,Effective 990301,attached ML20207A8741999-02-25025 February 1999 Draft Response to NRC Telcon Re Licensee Request for Approval of LBB Evaluation in Support of Elimination of Augmented Insp Program on RCS Loop Bypass Lines.Response Justifies Use of Less than One Gpm Detectable Leakage Rate ML18152B5401999-02-11011 February 1999 Requests Relief from Specific Requirements of Subsection Iwl of 1992 Edition with 1992 Addenda of ASME Section Xi,Per 10CFR50.55a(a)(3) ML20203C8181999-02-0505 February 1999 Forwards Response to NRC 981217 Telcon RAI Re risk-basis of Nitrogen Accumulator Action Statement to Complete NRC Review of 951025 Proposed TS Changes 1999-09-27 Category:LEGAL/LAW FIRM TO NRC MONTHYEARML20155F7771988-08-0505 August 1988
[Table view]FOIA Request for Documents Re Low Level Radwaste Facilities to Be Built at Plants ML20236B6271987-10-19019 October 1987 Requests Removal of Name from Svc List for All Matters Re Plant ML18143B6431985-09-25025 September 1985 Forwards Endorsements 79 & 60 to Nelia Policy NF-186 & Maelu Policy MF-57,respectively ML20134Q3201985-09-0404 September 1985 Discusses Licensee Progress in Implementing Interim Spent Fuel Plan.Const Work at Dry Cask Facility 22% Complete. Second Dry Storage Cask Scheduled to Arrive During First Half of Oct.Related Correspondence ML20132E2131985-07-30030 July 1985 Repts on Progress of Licensee Efforts to Deal W/Accumulated Spent Nuclear Fuel.Util Shipped 12 of 19 Spent Fuel Assemblies to DOE Idaho Facility.Const of Surry Dry Cask Storage Facility Begun.Related Correspondence ML20129H7041985-07-12012 July 1985 Forwards Util Reply to Concerned Citizens of Louisa County post-hearing Brief.W/O Encl.Related Correspondence ML20128H0931985-07-0303 July 1985 Requests Addl Wk to Respond to Concerned Citizens of Louisa County Proposed Findings,Making Response Due 850718 Instead of 850711 & Addl Wk to Respond to NRC Proposed Findings. Related Correspondence ML20127M6831985-06-26026 June 1985 Requests Board Inform Parties Whether Board Wishes to Be Advised of Intervening Developments Re Const of Dry Cask Storage Facility.Licensee Will Continue to Provide Info Until Advised Otherwise.Related Correspondence ML20117F6841985-05-0909 May 1985 Submits List of Exhibits That Licensee & NRC Propose to Introduce Into Evidence During Forthcoming Hearing,Per 850319 Order.Certificate of Svc Encl.Related Correspondence ML20117H7431985-05-0909 May 1985 Requests That ASLB Consider Proposal to Adjourn Evidentiary Portion of 850521 Hearing After Testimony of Witnesses & Response to cross-examination Until Morning of 850522 When Jefferson Would Take Stand.Related Correspondence ML20117F6331985-05-0909 May 1985 Forwards to Judge Wolfe Setting Out Joint List of Exhibits Required by ASLB 850319 Order & Testimony of ML Smith,Rm Jefferson,Pn Mccreery & Jm Pickworth.Related Correspondence ML20117H4371985-05-0808 May 1985 Informs That Concerned Citizens of Louisa County Will Not File pre-filed Testimony on 850508 & Will Not Present Direct Affirmative Case During Evidentiary Hearing Beginning 850521.Related Correspondence ML18142A3931985-05-0303 May 1985 Forwards Endorsements 53 & 40 to Nelia Policy NF-240 & Maelu Policy MF-96,respectively ML20116L2151985-04-29029 April 1985 Forwards Motion for 6-day Extension of Deadline for Submittal of Prefiled Testimony.Motion Has Consent of All Parties & Intended to Supplant Concerned Citizens of Louisa County 850426 Motion ML20111B6991985-03-0707 March 1985 Informs That Parties Discussed Possible Schedule for Filing Testimony & Holding Hearing,Per Request.Schedule of 850426 for Filing Testimony & 850514 for Beginning of Hearing Recommended ML20114B4781985-01-24024 January 1985 Forwards Applicant Response to Concerned Citizens of Louisa County Request for Production & Interrogatories.W/O Encl. Related Correspondence ML20099E5661984-11-16016 November 1984 Advises That Concerned Citizens for Louisa County & NRC Request,Per 10CFR2.749,ASLB Proceed to Rule on Issue of Applicability of Table S-4 Re Storage of Fuel at North Anna as Posed in Consolidated Contention 1 ML20099E5681984-11-15015 November 1984 Forwards Brief in Opposition to Appeal of Concerned Citizens of Louisa County & Answer Opposing Request for Stay.W/O Encl.Related Correspondence ML20094A9141984-10-30030 October 1984 Submits Parties Response to Paragraph 3 of ASLB 841015 Order.Related Correspondence ML20094A8891984-10-24024 October 1984 Forwards Executed Affidavit of Nondisclosure Concerning Concerned Citizens of Louisa County Contention 4 Re Security.Related Correspondence ML20098B0871984-09-21021 September 1984 Forwards Applicant Response to ASLB Question on Table S-4. W/O Encl.Related Correspondence ML20098A9771984-09-20020 September 1984 Forwards Proposed Draft Protective Order Re Applicant Physical Protection Sys & Draft Affidavit of Nondisclosure. Related Correspondence ML20096A5121984-08-27027 August 1984 Forwards Applicant Response to Concerned Citizens of Louisa County,Va Revised Contention 4.W/o Encl.Related Correspondence ML20094R1671984-08-14014 August 1984 Forwards Response to Contentions of Concerned Citizens of Louisa County.W/O Encl.Related Correspondence ML20093N2561984-07-30030 July 1984 Informs That Util & NRC Intend to File Response to Objectionable Contentions by 840817,based on Discussions W/ Parties ML20084F3871984-05-0101 May 1984 Forwards 840426 Settlement Agreement Between County of Louisa,Va & Util.County of Louisa Filed Notice of Withdrawal from Proceedings Per Paragraph 5 of Agreement.Related Correspondence ML20084C9521984-04-27027 April 1984 Forwards Notice of Withdrawal of County of Louisa & Board of Supervisors.W/O Encls.Related Correspondence ML20086A6071983-11-0808 November 1983 Informs That Jn Christman Should Be Removed from Mailing List ML20081A5231983-10-20020 October 1983 Summarizes 831012 Meeting W/Nrc,Util & Louisa County Re Louisa County Contentions.Mutually Agreeable Proceeding Schedule Recommended Following Publication of Environ Analysis & Ser.Related Correspondence ML20078K6961983-10-13013 October 1983 Updates Status of Full Core Reserve at Facility.Full Core Reserve Will Be Lost During Outage Scheduled for Early 1986 If Fuel Performs Properly During Future Operating Cycles ML20080G3751983-09-16016 September 1983 Requests Oral Argument on Motion for Directed Certification Be Scheduled After 831006 ML20073J7611983-04-15015 April 1983 Advises of Intent Not to File Reply to Submissions of Other Parties in Response to ASLB 830216 Inquiries.Certificate of Svc Encl ML20073D6851983-04-11011 April 1983 Forwards Attachment 4 to Application for OL Amend.Document Withheld from 830301 Transmittal Since Document Contained Safeguards Info.Util Decided Document Need Not Be Treated as Containing Safeguards Info.Related Correspondence.W/O Encl ML18139C2881983-03-24024 March 1983 Informs That Util Has Decided Not to Request Public Hearing on Orders for Mod of License Re Qualification of safety- Related Electrical Equipment ML18139C2531983-03-0808 March 1983 Forwards Endorsements 42 & 69 to Nelia Policies NF-240 & NF-186,respectively ML20079N9541983-03-0101 March 1983 Forwards Util to NRC W/Attachments Constituting Util Application to Transfer Spent Fuel from Surry. Attachment 4 Requires Special Treatment & Will Be Sent Separately.W/O Encl.Related Correspondence ML20079N9611983-03-0101 March 1983 Forwards Util W/Attachments Constituting Util Application to Expand Spent Fuel Pool.Util 821021 Encl Ltr Corrects Info in Application.W/O Encl.Related Correspondence ML18139C2431983-02-22022 February 1983 Informs That Util Will Determine,Within 30-day Period Following 830222,whether to Request Hearing Re Orders Imposing EP Requirements ML18139C2221983-01-24024 January 1983 Forwards Endorsements 52 & 53 to Maelu Policies MF-57 & 96, Respectively & Endorsements 68 & 41 to Nelia Policies NF-186 & 240,respectively ML20028E1431983-01-17017 January 1983 Forwards Board of Supervisors of County of Louisa, VA Contentions ML20028E1571983-01-17017 January 1983 Forwards Board of Supervisors of County of Louisa, VA Contentions ML20067C5271982-12-0707 December 1982 Objects to 830117 Deadline for Submittal of Contentions. Deadline Hampers Identification of Valid Contentions & Increases Likelihood of Burdening Proceeding Due to Submittal of Unreviewed Contentions ML20027E6991982-11-0808 November 1982 Forwards Jm Coleman,Ca Lewis,R Brager,Vs Albrecht & Ch Buckley Notices of Appearance in Proceeding.Certificate of Svc Encl ML20027E6631982-11-0808 November 1982 Forwards CA Lewis,R Brager,Vs Albrecht,Ch Buckley & Jm Coleman Notices of Appearance.Certificate of Svc Encl ML20065T4591982-10-21021 October 1982 Forwards Util Application for Amend to Certificate of Public Convenience & Necessity,ET-117g,State of VA 820119 Order Requiring Notice & Scheduling Hearing & 820323 Amendatory Order.W/One Oversize Drawing.Aperture Card in PDR ML20063E1081982-08-25025 August 1982 Confirms 820820 Telcon Re Louisa County Board of Supervisors Intention to Intervene in Util 820713 Proceedings to Amend OL to Permit Receipt & Storage of Spent Fuel Assemblies ML20071K9141982-07-26026 July 1982 Forwards Endorsement 40 to Nelia Policy NF-240 & Endorsement 30 to Maelu Policy MF-96 ML20052F5411982-05-10010 May 1982 Forwards Endorsements 51,67,39 & 29 to Maelu Policy MF-57, Nelia Policies NF-186 & NF-240 & Maelu Policy MF-96, Respectively ML18139B8531982-04-23023 April 1982 Forwards Endorsements 38,66,8,8,6 & 9 to Nelia Policies NF-240,NF-186 & Binders EB-27,EB-28,EB-70 & EB-63, Respectively ML18139B7771982-03-0101 March 1982 Forwards Endorsements 27 & 28 to Maelu Policy MF-96 1988-08-05 |
Text
.~
' NRC PUBL!C DOCUMENT IluxTox & WILLI AMS 707 EAST Id AIN s]AF ET P. o. Box 1535 R ICIE M O N D, VI H U INI A 20212 TELEPHONE (804) 788-02 O CAett HUNTWAND WANIIINGTON, D. C. O rrica 1730 PENN SYLVANIA Avt,N. W. 20036 P. O. Box 19230
'" " ~ o " * (2 2' "3-
April 30, 1979 FILE N O.
V-8-50-20-29 DIR ECT DI A L N o. (8 0 4) 788-8368 Alan S. Rosenthal, Esquire Atomic Safety & Licensing Appeal Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Dr. John H. Buck e .
- Atmmic Safety & Licensing Appeal Board U.S. Nuclear Regulatory Commission Wa shini, ton , D.C. 20555
@ar g, p)J,4. Yp o
4 y
Michael C. Farrar, Esquire O
l g"1
'ey a; Atomic Safety & Licensing Appeal Boar 'rg A 2;.r V Y [/
U.S. Nuclear Regulatory Commission 8 Washington, D.C. 20555 4 77T,[,A Virginia Elect M d Power Company North Anna Powep Stat *on, Units 1 & 2 Docket Nos. 50-338 L & 50-339 OL Turbine Missi_e Testimony v
Gentlemen:
Enclosed is a second copy of the "Vepco Testimony on Probability of Generating Turbine Missiles and Turbine Over-speed Protection System." I discovered this morning that the version I , served last Friday did not have the lines num-I bered, unlike the other two pieces of testimony I filed then.
l The enclosed copy corrects that oversight. The text' is iden-tical to that in the Friday version.
ours very truly, M
James N. Christman Counsel for Virginia Electric and Power Company 790524 0giy 1
.. -. . .- . - . - - . .. .. - .._.. . --- . .-- . . . . - _ ~
i i
2 IIU N TO N & WILLI AMS
_2_
126/625
- Enclosure i
cc: Richard M. Foster, Esquire
! Anthony J. Gambardella,' Esquire
} Daniel T. Swanson, Esquire
,' Atomic Safety and Licensing Board 22nel
', Atomic Safety and Licensing Appeal Board Chief, Docketing & Service Section #
l O .-
q a
i l
O 6
f i
i w ,, , a+--a.#==*-.A** * "**
-.ww,,-g...=y
- e -yg-
-msJP e===w- es---e-e-s,m 1pm -n e -, - . ~ , , -e -.m,---p mv-.mx-.~m+w ,,%+ . ,-g-g,g,y v-r y=w,- - -gr e ry3--m.g--gq- .--g, hg +As y.,.M,e+, m--p-- p- . 9,