Issue date | Title | Topic | |
---|---|---|---|
ML19312B816 | 12 June 1978 | Proposed Tech Specs 3.8,4.4 & 4.6 Re Fuel Loading & Refueling,Structural Integrity & Emergency Power Periodic Testing | |
ML19312B838 | 11 June 1976 | Proposed Tech Specs 2.1,2.3 & 4.2.12 Re Flux/Flow Trip Setpoint for Unit 1 & Incorporation of Surveillance Testing Requirement for Internals Vent Valves | |
ML19312B840 | 13 October 1976 | Proposed Tech Spec 3.7 Re Limiting Conditions for Transmission Line Paths & Monitoring Operations | Safe Shutdown |
ML19312B841 | 6 May 1977 | Proposed Tech Spec 4.18.1 Re Extension of Surveillance Interval for Hydraulic Shock Suppressors | |
ML19312B846 | 27 May 1976 | Proposed Tech Specs 4.1 & 4.11 Re Measurement & Control of Radioactive Liquid & Gaseous Effluents | |
ML19312B851 | 10 March 1976 | Proposed Tech Specs 3.3,3.8,3.15,3.16,4.4,4.5 & 4.14 Re Penetration Room Ventilation & Hydrogen Purge Sys, & Spent Fuel Pool Ventilation Sys | Shutdown Margin |
ML19312B854 | 13 October 1976 | Proposed Condition 2B to OLs Permitting Receipt,Acquisition, Possession,Use,Transfer & Import of Any Byproduct & Source Matl & SNM | |
ML19312B855 | 21 June 1977 | Proposed Revision to Tech Specs 3.1.6 & 4.17 Re Provisions for Surveillance of Steam Generator Tubing | Boric Acid Non-Destructive Examination Operating Basis Earthquake Stress corrosion cracking Earthquake Fuel cladding Eddy-Current Testing |
ML19312B857 | 13 May 1976 | Proposed Tech Spec 1.2 Re Increase in Ph Limit of Water Discharged from Station Site from 8.5 to 9.0 | |
ML19312B866 | 19 February 1976 | Proposed Tech Specs 3.14,4.1 & 4.18 Re Hydraulic Shock Suppressors | Earthquake |
ML19312B868 | 7 May 1976 | Proposed Tech Spec 1.0 Requiring Annual Submittal of Nonradiological,Environ Rept | |
ML19312B869 | 1 November 1976 | Proposed Tech Specs 3.2,3.3.6,3.5,3.5.2.5,4.11,6.4,6.5 & 6.6.2.2 Re High Pressure Injection & Chemical Addition Sys & Station Operating Procedures & Records | Boric Acid Shutdown Margin Earthquake |
ML19312B875 | 5 December 1975 | Proposed Tech Specs 6.1,6.2 & 6.3 Re Operating Characteristics of Independent Review & Audit Body, Restraints on Director of Audit Body & Min Qualification Requirements of Audit Body Members | Safe Shutdown |
ML19312B876 | 10 March 1977 | Proposed Tech Specs 4.2.10 & 4.2.11 Re Reinstitution of Surveillance Program | |
ML19312B885 | 8 July 1977 | Proposed Tech Specs 1.8,1.9,3.13,3.14 & 4.1 Re Limits on Reactor Coolant & Secondary Coolant Iodine Activities to Maintain Dose Rates from Postulated Accidents Below Limits | Power change |
ML19312B890 | 30 March 1977 | Proposed Tech Specs 2.1,2.3 & 3.5 Re Reactor Core Safety Limits,Protective Instrumentation Limiting Safety Sys Settings & Control Rod Group & Power Distribution Limit | Shutdown Margin Fuel cladding |
ML19312B891 | 1 December 1975 | Proposed Revisions to Tech Specs 2.1,2.3,3.1.9 & 3.5.2 Re Core Safety Limits,Safety Sys Settings Limitation,Low Power Physics Testing Restrictions & Control Rod Group & Power Distribution Limit | Shutdown Margin Fuel cladding |
ML19312B893 | 18 July 1977 | Proposed Revisions to Tech Specs 3.17,4.19 & 6.1 Re Fire Protection & Detection Sys | Safe Shutdown Fire Barrier Continuous fire watch Fire Protection Program Fire Watch |
ML19312B894 | 6 June 1977 | Proposed Tech Spec 3.1 Incorporating Changes to Pressurization Heatup & Cooldown Limitations for Unit 2, Based on June 1977 BAW-1437 | Shutdown Margin Hydrostatic |
ML19312B899 | 1 October 1976 | Conformance W/Asme Section Xi:Inservice Exam. | Safe Shutdown |
ML19312B900 | 6 May 1977 | Proposed Replacement Pages for Tech Spec 4.1 Defining Provisions to Identify &/Or Account for Radionuclides Which May Be Present at Low Activity Levels in Mixtures of Gamma Emitters | |
ML19312B901 | 1 October 1976 | Conformance W/Asme Section XI Subsection Iwp:Pump Testing. | Boric Acid |
ML19312B902 | 1 October 1976 | Conformance W/Asme Section Xi,Subsection Iwv:Valve Testing. | Safe Shutdown |
ML19312B903 | 1 October 1976 | Proposed Revision to Tech Specs 4 Re Inservice Insp | Power-Operated Valves |
ML19312B910 | 30 July 1974 | Proposed Tech Spec 3.11 Deleting Restriction Limiting Unit 1 to 7500 Effective Full Power Hours | |
ML19312B918 | 19 August 1974 | Proposed Tech Specs 6.1,6.2 & 6.3 Incorporating Organization & Position Titles Std for All Util Nuclear Stations | Safe Shutdown |
ML19312B921 | 21 November 1973 | Proposed Tech Spec 3.4 Deleting Tech Spec 3.4.3 Specifying Operability of Valves in Turbine Bypass | |
ML19312B927 | 30 August 1974 | Proposed Tech Spec 4.17 Incorporating Program for Surveillance of Steam Generator Tubing | Non-Destructive Examination Safe Shutdown Earthquake Stress corrosion cracking Eddy-Current Testing |
ML19312B928 | 15 January 1975 | Proposed Tech Specs 3.1,4.2,4.4,4.13,6.1,6.2,6.5 & 6.6 Re Reporting Requirements,Including Change in Frequency of Submittal of Routine Operating Repts & Elimination of First Yr Operating Rept | Shutdown Margin Hydrostatic Local Leak Rate Testing Eddy Current Testing Fuel cladding |
ML19312B934 | 28 November 1973 | Proposed Tech Specs 3.1.5.2 & 3.1.5.3 Initiating Corrective Action within 8-h to Return Chloride or Fluoride Levels to Less than or Equal to 0.15 Parts Per Million,If Chloride or Fluoride Concentrations Exceed 0.15 Parts Per Million | |
ML19312B937 | 4 September 1974 | Proposed Tech Spec 3.6 Allowing Maint Intervals on Hatches & Isolation Valves for Short Periods of Time | |
ML19312B940 | 28 February 1975 | Proposed Tech Spec 6.1.2 Re Establishment of Controls in Lieu of Onsite Review Committee | Safe Shutdown |
ML19312B941 | 30 November 1973 | Proposed Tech Specs 3.5.2.4 & 3.5.2.5 Changing Operating Limits & Basic Differences Between Units 1 & 2 Peaking Penalties | Shutdown Margin |
ML19312B952 | 12 March 1975 | Proposed Replacement Page W/Original Tech Spec 1.2.8 Deleted Re Definition of Refueling Period as Time Between Normal Refuelings of Reactor,Not to Exceed 18 Months W/O Prior NRC Approval.Remaining Specs Renumbered | Shutdown Margin |
ML19312B954 | 20 September 1974 | Proposed Tech Specs 2.1,2.3 & 3.5.2 Re Reactor Core Safety Limits,Protective Instrumentation Limiting Safety Sys Settings & Control Rod Group & Power Distribution Limit | Fuel cladding |
ML19312B955 | 19 December 1973 | Proposed Tech Spec 6.1.1 Requiring Maint Engineer Report to Station Superintendent & Maint Supervisor Report to Maint Engineer on Organization Chart.Maint Engineer or Maint Supervisor Will Meet Min Requirements Per FSAR | |
ML19312B961 | 31 December 1973 | Proposed Tech Spec 3.5.2 Incorporating Operating Limits for Unit 2 | Shutdown Margin |
ML19312B968 | 8 March 1974 | Proposed Tech Spec 3.5.2 Revising Rod Withdrawal Limits for Units 1 & 2 | Shutdown Margin |
ML19312B969 | 28 October 1974 | Forwards Proposed Tech Specs 2.1,2.3 & 3.5 Re Reactor Core Safety Limits,Protective Instrumentation Limiting Safety Sys Settings & Control Rod Group Withdrawal Limits.Supports Operation of Unit 1,Cycle 2 at Rated Power | Fuel cladding |
ML19312B971 | 9 May 1975 | Proposed Tech Specs 3.1.3.5,3.5.2.3 & 3.5.2.5 Incorporating Addl Restriction on Regulating Control Rod Positions Prior to Criticality,Deleting Spec on Inserted Control Rod Worths & Modifying Rod Withdrawal Limits After Rod Interchange | Shutdown Margin |
ML19312B983 | 15 January 1975 | Proposed Tech Spec 3.6 Providing for Momentary Passage Through Operable Door of Inoperable Hatch | |
ML19312B984 | 10 June 1975 | Proposed Tech Specs 1.6 & 3.5.4 Adding Flexibility to Measurement of Quadrant Power Tilt | |
ML19312B989 | 29 May 1974 | Proposed Figure 6.1-1 Re Station Organization for Operation, Technical Support & Maint | |
ML19312B993 | 12 November 1974 | Proposed Tech Spec 4.2.8 Modifying Reporting Requirements. Requires Forwarding of Rept of Test Results of Reactor Vessel Specimen Withdrawal to AEC | |
ML19312B998 | 19 June 1975 | Proposed Tech Spec 4.6.3 Re Annual Performance of Simulated Emergency Transfer of 4160 Volt Main Feeder Buses to Startup Transformer & to 4160 Volt Standby Buses | |
ML19312C001 | 6 July 1974 | Proposed Tech Spec 1.7 Permitting Maint on One Door of Either Personnel or Emergency Hatch for 48-h Provided Remaining Door Closed & Sealed | |
ML19312C002 | 31 December 1974 | Proposed Tech Spec Table 4.1-2 Changing Frequency for Testing Pressurizer & Main Steam Safety Valves | |
ML19312C008 | 19 June 1975 | Proposed Tech Specs 6.1,6.2 & 6.3 Re Administrative Controls,Action to Be Taken in Event of Incident Reportable to NRC & Action to Be Taken in Event Safety Limit Exceeded | Safe Shutdown |
ML19312C009 | 9 July 1975 | Proposed Tech Spec 3.1.3,3.1.7 & 3.5 Re Min Conditions for Criticality Moderator Temp Coefficient of Reactivity & Control Rod Group & Power Distribution Limits | Shutdown Margin |
ML19312C010 | 15 August 1975 | Proposed Tech Specs 3.14,4.0,4.1,4.17 & 4.18 Requiring Limiting Condition for Operation for Hydraulic Shock Suppressor Operability & Appropriate Surveillance Requirements to Assure Suppressor Performance & Reliability | Earthquake |