Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML12171A366 | 16 July 2012 | 6/12-13/2012 Summary of Meeting at the Plant Site in Russellville, AR, to Discuss Entergy Operations, Inc.'S License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 at Arkansas Nuclear One, Unit 2 | Safe Shutdown |
ML12195A328 | 13 July 2012 | AIT Meeting Summary | |
ML12222A031 | 8 August 2012 | Arkansas Monitoring Call Summary | |
ML12240A416 | 27 August 2012 | Public Meeting with Entergy Operations, Inc to Discuss the Performance of the Subject Facilities and Current Regulatory Issues | |
ML12261A196 | 16 September 2012 | Summary of Meeting with Waterford Steam Electric Station to Discuss the Performance of the Waterford Steam Electric Station, Unit 3, for the Period of July 1, 2011 Through June 30, 2012 | Open House |
ML12275A549 | 1 October 2012 | Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues | |
ML12276A301 | 12 October 2012 | Summary of October 25, November 8, and November 10, 2011, Conference Calls Related to Fall 2011 Refueling Outage Steam Generator Tube Inspections | |
ML13043A611 | 26 February 2013 | Summary of 1/25/2013 Conference Call Regarding the Upcoming 2013 Steam Generator Tube Inspections | |
ML13142A227 | 22 May 2013 | Summary of Public Meeting to Discuss Results of Augmented Inspection at Arkansas Nuclear One | Temporary Modification |
ML13172A029 | 9 July 2013 | Summary of 5/10/2013 Conference Call with Entergy Operations, Inc., 2013 Steam Generator Tube Inspections at Arkansas Nuclear One, Unit 1 | |
ML14128A512 | 9 May 2014 | Summary of Regulatory Conference to Discuss Safety Significance of Arkansas Nuclear One Unit 1 Dropped Stator | |
ML14162A371 | 26 June 2014 | 5/22/2014 Summary of Meeting with Entergy Operations, Inc. to Discuss Flooding Hazard Reevaluation Extension Request for Arkansas Nuclear One, Units 1 and 2; Near-Term Task Force Recommendation 2.1 | |
ML14163A050 | 13 June 2014 | Summary of Conference Call with Arkansas Nuclear One, Unit 2, Regarding the Spring Steam Generator Inspections | |
ML14170A060 | 23 June 2014 | Summary of 5/27/2014 Conference Call Regarding Refueling Outage Steam Generator Inspection | |
ML14197A583 | 18 September 2014 | Summary of the June 19, 2014, Category 1 Public Meeting with Entergy to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Tear Task Force Recommendation 2.1 | Safe Shutdown Earthquake |
ML14213A427 | 12 September 2014 | Summary of July 16, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers Nuclear Regulatory Commission, and Entergy Operations Inc. to Discuss Flooding Analysis Associated with Arkansas Nuclear One, Units 1 and 2 | Earthquake |
ML14259A529 | 16 September 2014 | Summary of Annual Assessment Meeting for Waterford Steam Electric Station Unit 3 | |
ML14259A597 | 16 September 2014 | Summary of Annual Performance Assessment Meeting for Arkansas Nuclear One Performance | |
ML14356A172 | 22 December 2014 | Summary of Site Audit to Support the Review of a License Amendment Request for Arkansas Nuclear One, Unit 2 to Transition to the National Fire Protection Association (NFPA) Standard 805 Fire Protection Licensing Basis | Safe Shutdown Probabilistic Risk Assessment Multiple Spurious Operation Maintenance Rule Program Fire Protection Program |
ML15007A478 | 15 January 2015 | Summary of July 15-18, 2013, Arkansas Nuclear One, Unit 2, Audit Associated with License Amendment Request to Transition to National Fire Protection Association Standard 805 | Safe Shutdown Probabilistic Risk Assessment Multiple Spurious Operation Maintenance Rule Program Fire Protection Program |
ML15089A164 | 27 April 2015 | Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis | |
ML15099A563 | 9 April 2015 | Public Meeting Summary - Regulatory Conference with Entergy Operations, Inc., for Waterford Steam Electric Station, Unit 3 | High winds |
ML15117A503 | 6 May 2015 | April 22, 2015, Summary of Pre- Application Public Meeting with Entergy Operations, Inc., Waterford, Unit 3, to Discuss the License Amendment Request to Modify Technical Specification 3.1.3.4 and the Final Safety Analysis Report | Fire Protection Program |
ML15132A175 | 21 May 2015 | Summary of Annual Assessment Meeting with Entergy Operations Inc., Regarding ANO 2014 Performance | |
ML15196A415 | 15 July 2015 | Summary of Meeting with Entergy Corporation to Discuss Annual Performance Assessment | |
ML15225A254 | 14 August 2015 | Summary of 4/20-23/2015 Audit in Support of Request to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) | Safe Shutdown Probabilistic Risk Assessment |
ML15239A739 | 31 August 2015 | Summary of Public Meeting with Entergy Operations, Inc. to Discuss Main Control Room Abandonment Regarding NFPA-805 License Amendment Request | Probabilistic Risk Assessment |
ML15267A418 | 24 September 2015 | Summary of Meeting to Discuss Arkansas Nuclear One Performance Improvement | |
ML15348A188 | 6 January 2016 | Summary of October 28, 2015, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc. to Discuss Flood Analysis Associated with Arkansas Nuclear One, | |
ML16109A364 | 18 April 2016 | Summary of Meeting to Discuss Supplemental Inspection Results and Annual Assessment Meeting with Entergy Operations Inc. Regarding 2015 Performance of Arkansas Nuclear One | |
ML16119A342 | 28 April 2016 | Summary of Regulatory Conference to Discuss Safety Significance of River Bend Station Control Building Chilled Water System Apparent Violation | |
ML16125A083 | 4 May 2016 | Summary of Annual Assessment Meeting with Entergy Operations Inc Regarding Waterford-3 2015 Performance | Open House |
ML16323A229 | 24 January 2017 | 08/23-25/2016 Summary of Teleconference Meetings with Entergy Operations Inc., Concerning RAI Set 1 Pertaining to the Waterford Steam Electric Station, Unit 3 License Renewal Application | Coatings Aging Management Moisture barrier Dissimilar Metal Weld |
ML16341B063 | 21 December 2016 | November 30, 2016 Summary of Teleconference Held Between NRC and Entergy Operations, Inc. Concerning RAI Set 9 Pertaining to the Waterford Steam Electric Station, Unit 3, License Renewal Application | |
ML16356A582 | 30 December 2016 | 12/07/2016 Summary of Teleconference with Entergy Operations, Inc. Concerning Requests for Additional Information Set 10 Pertaining to the Waterford Steam Electric Station Unit 3 License Renewal Application | |
ML16364A290 | 24 January 2017 | 12/8/16, Summary of Public Meeting with Entergy Operations, Inc., Regarding the License Amendment Request to Revise Technical Specification Table 4.3-2 to Relocate ESFAS Subgroup Relays to the SFCP for Waterford Steam Electric Station, Unit | Surveillance Frequency Control Program |
ML17088A185 | 30 March 2017 | Summary of Telecon Held on March 28, 2017, Between NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) | Aging Management |
ML17090A047 | 31 March 2017 | Summary of Telecon Held on March 28, 2017, Between the NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) - Updated with ADAMS Accession Nos | Aging Management |
ML17152A244 | 1 June 2017 | Summary of Public Meeting - River Bend Station | |
ML17152A377 | 1 June 2017 | Errata for Summary of Public Meeting | |
ML17174B192 | 29 June 2017 | Summary of June 8, 2017, Category 1 Teleconference with Entergy Regarding Planned Request for Alternative Regarding High Pressure Safety Injection Pump for Waterford Steam Electric Station, Unit 3 | Mission time |
ML17174B226 | 28 June 2017 | Summary of June 1, 2017, Public Meeting with Entergy Regarding Planned License Amendment Request to Revise Technical Specification (TS) Table 3.7-3 and TS 3/4.7.4, Ultimate Heat Sink for Waterford Steam Electric Station | Ultimate heat sink Surveillance Frequency Control Program |
ML17180A136 | 9 August 2017 | 05/25/2017 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Entergy Operations, Inc. Representatives to Discuss the River Bend Station, Unit 1 License Renewal Application | Aging Management |
ML17187A037 | 9 August 2017 | 04/25/2017 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Entergy Operations, Inc. Representatives to Discuss the River Bend Station, Unit 1 License Renewal Application | |
ML17234A544 | 30 August 2017 | Summary of Public Meeting with Entergy Operations, Inc. to Discuss a Proposed New Technical Specification for River Bend Station, Unit 1 | |
ML17293A615 | 19 October 2017 | 09/19/2017 Summary of Meting to Describe License Renewal and Allow Members of the Public the Opportunity to Provide Comments Environmental Issues with Us NRC Should Consider During Environmental Review of River Bend Statin License Renewal A | License Renewal |
ML17331A088 | 6 December 2017 | Summary of Public Meeting with Entergy Operations, Inc. Neutron Fluence Calculation Method for the Waterford Steam Electric Station, Unit 3 | |
ML17353A154 | 22 December 2017 | Summary of Public Meeting with Entergy Operations, Inc., on Proposed Changes to Emergency Plans to Revise Emergency Action Levels for Arkansas; Grand Gulf; River Bend; and Waterford (EPID-L-2017-LRM-0060) | |
ML18005A099 | 25 January 2018 | Summary of November 16, 2017, Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Steam Electric, Station Unit 3 Technical Specification 3/4.3.2 Table 4.3-2 | |
ML18057A453 | 7 March 2018 | Summary of Telephone Conference Call Held on February 20, 2018 Between the U.S. Nuclear Regulatory Commission and Energy Regarding RAI Pertaining to the River Bend Station, Unit 1 License Renewal Application Review | Aging Management |