Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
Information Notice 1985-62, Backup Telephone Number to the NRC Operations Center23 July 1985Backup Telephone Number to the NRC Operations Center
Information Notice 1986-97, Emergency Communications System28 November 1986Emergency Communications System
Information Notice 1989-20, Weld Failures in a Pump of Byron-Jackson Design24 February 1989Weld Failures in a Pump of Byron-Jackson Design
Information Notice 1989-21, Changes in Performance Characteristics of Molded-Case Circuit Breakers27 February 1989Changes in Performance Characteristics of Molded-Case Circuit Breakers
Information Notice 1989-23, Environmental Qualification of Litton-Veam Cir Series Electrical Connectors3 March 1989Environmental Qualification of Litton-Veam Cir Series Electrical Connectors
Information Notice 1989-24, Nuclear Criticality Safety6 March 1989Nuclear Criticality Safety
Information Notice 1989-25, Unauthorized Transfer of Ownership or Control of Licensed Activities7 March 1989Unauthorized Transfer of Ownership or Control of Licensed Activities
Information Notice 1989-26, Instrument Air Supply to Safety-Related Equipment7 March 1989Instrument Air Supply to Safety-Related Equipment
ML0210704689 April 2002Transmittal of Emergency Plan Implementing Procedures EPIP Index Pages 1 (SR/0/B/2000/003 Rev. 009), 2 (SR/0/B/2000/004 Rev. 005) & 3 for McGuire Nuclear Station Units 1 & 2
ML02325023214 November 2002Changes to Emergency Plan Implementing Procedures
ML04055009112 February 2004Changes to Emergency Plan Implementing Procedures
ML04090030118 March 2004Changes to Emergency Plan Implementing Procedures
ML15141A0497 May 2015Enclosure 3, EAL Technical Bases Document (Clean Version)
ML15141A0517 May 2015Enclosure 4, EAL Technical Bases Document (Redline and Strikeout Version)
ML15141A0527 May 2015Attachment 1, EAL Bases, Attachment 2, Fission Product Barrier Loss/Potential Loss Matrix and Bases, and Attachment 3, Safe Operation & Shutdown Areas Tables R-2 & H-2 Bases
ML15264A1572 January 1990Revised Crisis Mgt Implementing Procedures,Including Rev 32 to CMIP-1,Rev 29 to CMIP-4,Rev 33 to CMIP-5,Rev 38 to CMIP-6,Rev 37 to CMIP-7,Rev 32 to CMIP-9,Rev 1 to CMIP-14 & Rev 30 to CMIP-21
ML16056A24318 February 2016Emergency Action Level Technical Bases Document Redline
ML16056A24518 February 2016Emergency Action Level Technical Bases, Revision 1 Redline. Part 2 of 2
ML16351A3197 December 2016Revision 16-5 to Emergency Plan
ML17124A52815 April 2017EPIP Manual, Revision 16
ML17124A58917 April 2017Mcquire Nuclear Station - EPIP Manual - Revision 017
ML17235A6102 August 2017Emergency Plan Implementing Procedures Index, Revision 019, TR-NUC-MC-006675
ML19332C8451 November 1989Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 31 to CMIP-1,Rev 28 to CMIP-4,Rev 32 to CMIP-5,Rev 37 to CMIP-6,Rev 36 to CMIP-7,Rev 25 to CMIP-8,Rev 31 to CMIP-9 & Rev 19 to CMIP-13
ML19343D1313 April 1981Forwards Addl Info Re Emergency Preparedness for Facility,In Response to NRC Request.Includes Info Re Staffing Capability,Emergency Action Levels,Emergency Facilities & Meteorological Capabilities
ML19345F7856 February 1981Forwards Updated Response to TMI Concerns to Reflect Requirements of NUREG-0737.Info Provided Re Shift Technical Advisor,Shift Crew Composition,Special Training for Mitigating Core Damage & Emergency Operating Procedures
ML20028A94222 October 1982Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 5.3.1 Re Recovery Manager & Immediate Staff Group Plan & 5.3.6 Re Radiological Support Group
ML20043B2659 May 1990Revised Crisis Mgt Implementing Procedures,Including Rev 35 to CMIP-1,Rev 26 to CMIP-2,Rev 31 to CMIP-4,Rev 35 to CMIP-5,Rev 40 to CMIP-6,Rev 39 to CMIP-7,Rev 26 to CMIP-8, Rev 33 to CMIP-9,Rev 2 to CMIP-14 & Rev 10 to CMIP-16
ML20053C39830 April 1982Public Version of Revised Crisis Mgt Plan Implementing Plans/Procedures,Including Procedures 5.3.1 Re Recovery Manager & Immediate Staff Group plan,5.3.7 Re Technical Support Group & 5.3.16 Re Quarterly Inventory
ML20063M5199 July 1982Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 5.3.1 Re Recovery Manager & Immediate Staff Group Plan & 5.3.4 Re Scheduling/Planning Support Group
ML20069E02513 August 1982Public Version of Revised Crisis Mgt Plan Implementing Procedures,Including Procedure 5.3.10, Crisis Telephone Directory. One Oversize Map Encl.Aperture Card Available in PDR
ML20076A72410 June 1991Public Version of Crisis Mgt Implementing Procedures, Including Rev 39 to CMIP-1,rev 28a to CMIP-2,rev 44 to CMIP-7,rev 39 to CMIP-9 & Rev 10 to CMIP-11
ML20086G77116 October 1991Public Version of Revs to Crisis Mgt Implementing Procedures (Cmip),Including Rev 41 to CMIP-1,rev 37 to CMIP-4,rev 41 to CMIP-5,rev 46 to CMIP-6 & CMIP-7,rev 32 to CMIP-8,rev 40 to CMIP-9,delete CMIP-12 & Rev 24 to CMIP-13
ML20095K71315 August 1984Public Version of Revised Crisis Mgt Plan Implementing Procedures,Including 5.3.1 Re Recovery Manager & Immediate Staff Group Plan & 5.3.4 Re Scheduling/Planning Support Group.W/Felton 840823 Memo
ML20244D02814 August 1984Summarizes 840719 Emergency Response Data Sys Development Exercise,Which Evaluated Benefits of Electronic Data Transmission from Nuclear Facility Emergency Operations Ctr
ML21155A21326 August 2021Plant
ML22115A14125 April 2022NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information
ML22332A49310 March 2023William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility
ML99355037514 December 1999Revised Epips, Including Revision 16 to RP/0/A/5700/012, Revision 3 to SR/0/B/2000/003, Revision 2 to HP/0/B/1009/002 and Revised Indexes. with Letter Dated December 14, 1999
MNS-14-103, Submittal of Emergency Plan, Revision 14-516 December 2014Submittal of Emergency Plan, Revision 14-5
MNS-16-016, Emergency Action Level Technical Bases, Revision 1 Redline. Part 1 of 218 February 2016Emergency Action Level Technical Bases, Revision 1 Redline. Part 1 of 2
MNS-16-086, Emergency Plan, Revision 16-47 December 2016Emergency Plan, Revision 16-4
MNS-17-039, Emergency Implementing Procedures Plan, Revision 17-119 September 2017Emergency Implementing Procedures Plan, Revision 17-1
MNS-18-009, Site Emergency Plan26 January 2018Site Emergency Plan
MNS-18-038, Revision 18-2 to Emergency Plan, and Revision 28 to Emergency Plan Implementing Procedure Ep Grp Maual 1.122 May 2018Revision 18-2 to Emergency Plan, and Revision 28 to Emergency Plan Implementing Procedure Ep Grp Maual 1.1
NRC Generic Letter 1991-1423 September 1991NRC Generic Letter 1991-014: Emergency Telecommunications
RA-15-0019, Duke Energy Carolina LLC Submits Epips, Rev 5 to SR/0/A/2000/003, Activation of the Emergency Operations Facility and Rev 4 to SR/0/A/2000/004, Notification to States and Counties from the Emergency Operations Facility for Catawba, McGuir23 April 2015Duke Energy Carolina LLC Submits Epips, Rev 5 to SR/0/A/2000/003, Activation of the Emergency Operations Facility and Rev 4 to SR/0/A/2000/004, Notification to States and Counties from the Emergency Operations Facility for Catawba, McGuire
RA-15-0024, Transmits Emergency Plan Implementing Procedures15 June 2015Transmits Emergency Plan Implementing Procedures
RA-15-0038, Transmittal of Emergency Plan Implementing Procedure, Revision 7 to SR/0/A/2000/003, Activation of the Emergency Operations Facility20 August 2015Transmittal of Emergency Plan Implementing Procedure, Revision 7 to SR/0/A/2000/003, Activation of the Emergency Operations Facility
RA-16-0009, Duke Energy - Transmittal of Emergency Plan Implementing ProceduAD-EP-ALL-0802, Revision 215 February 2016Duke Energy - Transmittal of Emergency Plan Implementing ProceduAD-EP-ALL-0802, Revision 2
RA-16-0026, Transmittal of Emergency Plan Implementing Procedure SR/0/A/2000/003, Revision 914 July 2016Transmittal of Emergency Plan Implementing Procedure SR/0/A/2000/003, Revision 9