Issue date | Title | Topic | |
---|---|---|---|
CNL-17-065, Response to Preliminary Finding from NRC Inspection Reports 05000259/2017408, 05000260/2017408 and 05000296/2017408 | 15 May 2017 | Response to Preliminary Finding from NRC Inspection Reports 05000259/2017408, 05000260/2017408 and 05000296/2017408 | |
IR 05000002/1960010 | 9 February 2010 | Notification of Licensed Operator Initial Examination - 05000259-10-301, 05000260-10-0301, 05000296-10-301 | |
IR 05000226/2003025 | 23 April 1985 | Insp Rept 50-259/85-15,50-260/85-15 & 50-296/85-15 on 850226-0325.Violations Noted:Failure to Have All Three Trains of Standby Gas Treatment Operable & to Adhere to Tech Spec 6.3.A.6 | Reactor Vessel Water Level Unidentified leakage |
IR 05000250/1985037 | 22 August 1985 | Insp Repts 50-250/85-37,50-260/85-37 & 50-296/85-37 on 850729-0802.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization & Testing & Maint.Details Withheld (Ref 10CFR2.790 & 73.21) | |
IR 05000253/2007201 | 6 November 2007 | Security Inspection 05000253-07-201, 05000260-07-201 and 05000296-07-201 on 09/27/2007 for Browns Ferry Nuclear Plant | |
IR 05000254/2020003 | 9 November 2020 | Integrated Inspection Report 05000254/2020003; 05000265/2020003 and 07200053/2020001 | Safe Shutdown Time of Discovery Anticipated operational occurrence Past operability Enforcement Discretion VT-2 Functionality Assessment FLEX Significance Determination Process Operability Determination Control of Heavy Loads Coronavirus COVID-19 Through-Wall Leak Fire Protection Program Incremental Core Damage Probability Deficit Downpower |
IR 05000259/1976010 | 23 June 1976 | Responding to Letter of 6/3/1976, Referring to IE Inspection Reports for 50-259/76-10 & 50-260/76-10, Letter Advising Tennessee Valley Authority Do Not Consider Any Part of Reports to Be Proprietary | |
IR 05000259/1976012 | 24 June 1976 | Responding to Letter of 6/11/1976, Referring to IE Inspection Reports for 50-259/76-12 & 50-260/76-12, Letter Advising Tennessee Valley Authority Do Not Consider Any Part of Reports to Be Proprietary | Fire Watch Scaffolding |
IR 05000259/1976013 | 9 August 1976 | Responding to Letter of 7/15/1976, Referring to IE Inspection Reports for 50-259/76-13 & 50-260/76-13, Letter Advising Tennessee Valley Authority Do Not Consider Any Part of Reports to Be Proprietary | Safe Shutdown High Radiation Area Fire Watch |
IR 05000259/1976014 | 20 July 1976 | Responding to Letter of 7/29/1976, Referring to IE Inspection Reports for 50-259/76-14, & 50-260/76-14, Letter Advising No Proprietary Information Is Contained | |
IR 05000259/1976015 | 5 August 1976 | Responding to Letters of 8/2 & 8/3//1976, Referring to IE Inspection Reports for 50-259/76-15 & 76-16, & 50-260/76-15 & 76-16, Letter Advising No Proprietary Information Is Contained | |
IR 05000259/1976016 | 8 September 1976 | Further Responding to Letter of 8/3/1976, Referring to IE Inspection Reports for 50-259/76-16, 50-260/76-16, 50-296/76-12, Letter Advising Cable Trays Carrying safety-related Control & Signal Cables Are Loaded to Max. of 60% by Volume | |
IR 05000259/1976017 | 10 October 2018 | Responding to Letter of 8/5/1976, Referring to IE Inspection Reports for 50-259/76-17, 50-260/76-17, Letter Advising No Proprietary Information Is Contained | |
IR 05000259/1976018 | 3 November 1976 | Responding to Letter of 10/13/1976, Referring to IE Inspection Reports for 50-259/76-18, 50-260/76-18, 50-296/76-16, Letter Advising No Proprietary Information Is Contained | Shutdown Margin Fire Watch |
IR 05000259/1976020 | 22 November 1976 | Responding to Letter of 11/2/1976, Referring to IE Inspection Reports for 50-259/76-20, 50-260/76-20, 50-296/76-18, Letter Advising No Proprietary Information Is Contained | |
IR 05000259/1977026 | 3 January 1978 | Insp Repts 50-259/77-26,50-260/77-26 & 50-296/77-26 on 771213-16.Noncompliance Noted:Vital Green Area Gate Unopened & Unattended.Details Withheld (Ref 10CFR2.790) | |
IR 05000259/1978015 | 30 August 1978 | IE Inspec Repts 50-259/78-15, 50-260/78-16, & 50-296/78-14, on 780626,during Which No Items of Noncompliance Were Noted. Major Area Inspected:Whole Body Counting Practices & Procedures & Test Count of NRC Phantom | |
IR 05000259/1978018 | 26 October 1978 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted During Inspec 50-259/78-18, 50-260/78-19 & 50-296/78-17 | |
IR 05000259/1978024 | 22 September 1978 | IE Inspec Rept 50-259/78-24,50-260/78-27 & 50-296/78-23 on 780915.Meeting Held Re TVA Security Program & Managerial Changes Being Implemented | |
IR 05000259/1979016 | 30 July 1979 | Ack Receipt of 790706 IE Insp Repts 50-259/79-16, 50-260/79-16 & 50-296/79-16.No Proprietary Info | |
IR 05000259/1979032 | 29 November 1979 | RO-50-259/79-32:on 791128,during Insp of Restraints,Typical Hanger Identified as Possibly Unacceptable.Caused by Possible Misapplication of Hanger.Insp & Analyses Will Be Conducted to Determine Effect on Sys | |
IR 05000259/1980043 | 17 April 1981 | Confirms 810403 & 06 Telcons Re Deviation Noted in IE Insp Repts 50-259/80-43,50-260/80-40 & 50-296/80-39.Corrective Actions:Util Now Has Commitment Tracking Program Implemented by Compliance Staff to Insure Timely Response | |
IR 05000259/1981013 | 13 July 1982 | Notifies That Corrective Actions Re IE Insp Repts 50-259/81-13,50-260/81-13 & 50-296/81-13 Delayed.Procedure DPM N80E3 Re Exam of Cssg Items to Be Revised by 820915 | Nondestructive Examination |
IR 05000259/1981024 | 20 July 1982 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-259/81-24, 50-260/81-24 & 50-296/81-24 | |
IR 05000259/1982010 | 26 April 1982 | IE Insp Repts 50-259/82-10,50-260/82-10 & 50-260/82-10 on 820322-26 & 29-31.Noncompliance Noted:Failure to Establish Corrective Action Measures,Failure to Follow Audit Procedures & Failure to Implement QA Program | |
IR 05000259/1982013 | 14 May 1982 | IE Insp Repts 50-259/82-13,50-260/82-13 & 50-296/82-13 on 820326-0425.Noncompliance Noted:On 820421,reactor Core Isolation Cooling Sys Could Not Perform Safety Function Due to Controller in Manual Position | Safe Shutdown High Radiation Area Hydrostatic Scram Discharge Volume |
IR 05000259/1982014 | 2 June 1982 | IE Insp Repts 50-259/82-14,50-260/82-14 & 50-296/82-14 on 820503-04.Noncompliance Noted:Failure to Perform Radiation Survey After Removal of Shield Plugs & Failure to Issue Permit for Removal of Demineralizer Cell Shield Plugs | High Radiation Area Overexposure |
IR 05000259/1982015 | 2 June 1982 | IE Insp Repts 50-259/82-15,50-260/82-15 & 50-296/82-15 on 820426-0525.Noncompliance Noted:Written Safety Evaluation Re Offgas post-treatment Sampling Station Configuration Mod Not Performed | |
IR 05000259/1982016 | 3 June 1982 | IE Insp Repts 50-259/82-16,50-260/82-16 & 50-296/82-16 on 820512-19.Noncompliance Noted:Hpci Steam Supply Value Tagged Shut & Automatic Depressurization Sys,Rhr & Core Spray Not Tested to Prove Operability | |
IR 05000259/1982017 | 22 June 1982 | IE Insp Repts 50-259/82-17,50-260/82-17 & 50-296/82-17 on 820524-28.No Noncompliance Noted.Major Areas Inspected: Previous Insp Findings,Lers,Inspector Followup Items, NUREG-0803 & Meeting on Inservice Testing Program | |
IR 05000259/1982018 | 26 July 1982 | IE Insp Repts 50-259/82-18,50-260/82-18 & 50-296/82-18 on 820626-0725.No Noncompliance Noted.Major Areas Inspected: Operational Safety,Ros,Surveillance Testing,Maint Observation,Tmi Action Items & Independent Insp Effort | Fire Watch |
IR 05000259/1982019 | 30 June 1982 | IE Insp Repts 50-259/82-19,50-260/82-19 & 50-296/82-19 on 820526-0625.Noncompliance Noted:Failure to Properly Barricade Two High Radiation Areas in Torus Area | High Radiation Area Stroke time Scram Discharge Volume |
IR 05000259/1982021 | 22 July 1982 | IE Insp Repts 50-259/82-21,50-260/82-21 & 50-296/82-21 on 820628-0702.No Noncompliance Noted.Major Areas Inspected: Radioactive Matl Packaging,Shipment & Processing,Posting of Notices,Housekeeping & Instrument Calibr | High Radiation Area Hydrostatic Overexposure |
IR 05000259/1984025 | 30 April 1985 | Forwards 850410 RO Rept BFRO-50-259/84025R1 Containing Corrective Action & Completion Date Re Insp Rept 50-259/84-20,per Item 3 of Util 841015 Ltr & NRC 851121 Ltr. W/O Encl | |
IR 05000259/1984040 | 21 January 1985 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-259/84-40, 50-260/84-40 & 50-296/84-40 | |
IR 05000259/1984052 | 9 August 1985 | Ack Receipt of 850315 & 0620 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-259/84-52,50-260/84-52 & 50-296/84-52 | |
IR 05000259/1985006 | 5 December 1985 | Forwards Addl Info Re Insp Repts 50-259/85-06,50-260/85-06 & 50-296/85-06,per Hg Parris 851101 Ltr.Max Number of Sys & Instruments Will Be Maintained.Recommendation to Convert to STS Format Under Consideration | |
IR 05000259/1985008 | 1 May 1985 | Insp Repts 50-259/85-08,50-260/85-08 & 50-296/85-08 on 850204.Violation Noted:Failure to Control Vital Area Access. Details Withheld (Ref 10CFR2.790(d) & 73.21) | |
IR 05000259/1985009 | 10 May 1985 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-259/85-09, 50-260/85-09 & 50-296/85-09 | |
IR 05000259/1985016 | 25 March 1985 | Insp Repts 50-259/85-16,50-260/85-16 & 50-296/85-16 on 850311.Violation Noted:Guard Posted at Containment Drywell Hatch Could Not Control Access.Details Withheld | |
IR 05000259/1985018 | 7 May 1985 | Insp Repts 50-259/85-18,50-260/85-18 & 50-296/85-18 on 850401-04.Violations Noted:Inadequate Procedures & Insp of Diesel Generator Cooling Water Valves & Incorrect Classification of Emergency Equipment Cooling Water Sys | |
IR 05000259/1985019 | 3 April 1985 | Enforcement Conference Meeting Repts 50-259/85-19, 50-260/85-19 & 50-296/85-19 on 850314.Areas Reviewed:Reactor Startup W/Inoperable Water Level Instruments,Failure to Perform post-maint Testing & Certain Security Violations | Reactor Vessel Water Level Half scram |
IR 05000259/1985020 | 23 April 1985 | Insp Repts 50-259/85-20,50-260/85-20 & 50-296/85-20 on 850321-28.Violation Noted:Failure to Perform Safety Evaluation Required by Plant Procedures | |
IR 05000259/1985021 | 19 April 1985 | Insp Repts 50-259/85-21,50-260/85-21 & 50-296/85-21 on 850401-04.Violation Noted:Inadequate Design Calculations on Pipe Support HPCI R-86,R2 | |
IR 05000259/1985023 | 3 May 1985 | Insp Repts 50-259/85-23,50-260/85-23 & 50-296/85-23 on 850415-18.Violation Noted:Failure to Provide Adequate Training of Shift Engineers in Area of Offsite Protective Action Decisionmaking | Siren |
IR 05000259/1985026 | 9 May 1985 | Insp Repts 50-259/85-26,50-260/85-26 & 50-296/85-26 on 850422-26.Violation Noted:Failure to Follow Procedures for Support Insp (Units 1 & 2) | |
IR 05000259/1985029 | 21 May 1985 | Insp Repts 50-259/85-29,50-260/85-29 & 50-296/85-29 on 850506-08.No Violations Noted.Insp Held to Coincide W/Site Familiarization Given to FBI Special Agents.Details Withheld (Ref 10CFR2.790 & 73.21) | |
IR 05000259/1985037 | 23 August 1985 | Forwards Insp Repts 50-259/85-37,50-260/85-37 & 50-296/85-37 on 850729-0802.No Violations or Deviations Noted | |
IR 05000259/1985043 | 4 September 1985 | Insp Repts 50-259/85-43,50-260/85-43 & 50-296/85-43 on 850812-16.No Violations or Deviations Noted.Major Areas Inspected:Local Leak Rate Program,Fuel Handling & Followup on LERs | |
IR 05000259/1985045 | 1 August 1986 | Ack Receipt of 860715 Supplemental Response Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-259/85-45,50-260/85-45 & 50-296/85-45.Corrective Actions Will Be Examined During Future Insps |